In The Name of GOD

SIMULTANEOUS VOLTAGE CONTROL OF SEVERAL LOADS ON FEEDERS OF A

DISTRIBUTION SUB-STATION USING

FUZZY MODELING AND FUZZY OPTIMIZATION

A. Ebrahimi A. Zolfaghari S.Mohseni

Electrical and Comp. Eng. Department

Isfahan University of Technology, IRAN

Barcelona 12-15 May 2003

A.Ebrahimi_ir_Session3_block1_slide1

Scope of this paper

• A new algorithm for simultaneous voltage control of several loads located on various feeders of a distribution sub-station

• Using Fuzzy Modeling and Fuzzy Optimization

• According to actual limitations

Barcelona 12-15 May 2003

A.Ebrahimi_ir_Session3_block1_slide2

Usual Methods for Load Voltage Regulation

• Using Automatic switched shunt capacitors.

• Using Dynamic voltage regulators.• Using A.V.R. & Tap Changer Systems at

Distribution Substations.

A.Ebrahimi_ir_Session3_block1_slide3

Barcelona 12-15 May 2003

Limitations:

• Variation of loads and their power factor • The loads are distributed along the feeder • High voltage drop during peak and over voltage

during off-peak hours• Different behaviors of various loads• Different sensitivity of loads to voltage deviations• ِِ��At last but not least : No Remote Controlled

Switch and no Monitoring Systems are usually available

A.Ebrahimi_ir_Session3_block1_slide4

Barcelona 12-15 May 2003

There is an Optimization Problem!

Max : D = Min [i1 (Vi ) , i2 (Vi )]

S.T. : VA = Vi + Ri Ii COS Øi + Xi Ii SIN Øi

VAmin VA VA

max

For all i =1, 2,…, n

D is the decision fuzzy set defined as the intersection of fuzzy sets i

A.Ebrahimi_ir_Session3_block1_slide5

Barcelona 12-15 May 2003

Why Fuzzy Modeling

& Optimization?

• Fuzzy nature of loads and voltage variations

• Approximate data and rare of information

• No measurement and monitoring systems are available at most load points

A.Ebrahimi_ir_Session3_block1_slide6

Barcelona 12-15 May 2003

The Proposed Algorithm

• By FLP and some approximations:

VA = Vi + Ri Ii COS Øi + Xi Ii SIN Øi

• VA is the magnitude of low voltage side of transformer at sub-station

• Vi is the voltage of load i

A.Ebrahimi_ir_Session3_block1_slide7

Barcelona 12-15 May 2003

Triangular Membership Function

A.Ebrahimi_ir_Session3_block1_slide8

Barcelona 12-15 May 2003

WhyTrapezoidal membership functions?

• Representing a more realistic modeling for flexible constraints.

A.Ebrahimi_ir_Session3_block1_slide9

Barcelona 12-15 May 2003

Especial loads &

Their Priority in Voltage Regulation

• By priority factors (i ) multiplied to membership functions

• Decreasing acceptable bound of membership function

A.Ebrahimi_ir_Session3_block1_slide10

Barcelona 12-15 May 2003

Case Study

• A distribution sub station with 4 radial feeders• Loads assumed constant and at the end of feeders• Using triangular and trapezoidal membership

functions for voltage fuzzy sets• Using several priority factors

A.Ebrahimi_ir_Session3_block1_slide11

Barcelona 12-15 May 2003

• A symbolic view of the test system

A.Ebrahimi_ir_Session3_block1_slide12

Barcelona 12-15 May 2003

CONCLUSIONS

• Simultaneous voltage control of loads located at several distribution feeders

• Priorities for especial loads considered

• Useful and applicable in systems without remote controlled switches and monitoring system

A.Ebrahimi_ir_Session3_block1_slide13

Barcelona 12-15 May 2003

Thanks For Your Attention

A.Ebrahimi_ir_author_ALPHA3_Block1

A.Ebrahimi_ir_Session3_block1_slide14

Barcelona 12-15 May 2003

33Bridge-Isfahan-Iran

Recommended