Forell / Elsesser Engineers, Inc.

100th Anniversary Earthquake Conference

Commemorating the 1906 San Francisco Earthquake

Implementation of Base Isolation Implementation of Base Isolation in Retrofit Applicationsin Retrofit Applications

Presented bySimin Naaseh, SE, Principal Mason Walters, SE, Principal

Forell/Elsesser Engineers, Inc.April 17th, 2006

Forell / Elsesser Engineers, Inc.

Impetus for Base Isolation of Existing Buildings

Enhanced seismic protectionEnhanced seismic protection

Reduced extent of Reduced extent of superstructure retrofitsuperstructure retrofit

Protection of historic fabricProtection of historic fabric

Protection of valuable contentsProtection of valuable contents

Cost advantageCost advantage

Forell / Elsesser Engineers, Inc.

Technical Issues Unique to Base Isolation Retrofit

Isolation system is designed Isolation system is designed to meet certain thresholdsto meet certain thresholds

Limited existing structure Limited existing structure capacitycapacity

Unique dynamic response of Unique dynamic response of the structurethe structure

Limits on floor accelerationLimits on floor acceleration

Limits on moat dimensionLimits on moat dimension

Forell / Elsesser Engineers, Inc.

Base Isolation RetrofitPlanning and Design Challenges

Accommodating the isolator Accommodating the isolator spacespace

Accommodating the moatAccommodating the moat

Retrofitting the building Retrofitting the building appendages to accommodate appendages to accommodate free movement free movement

Retrofitting stairs and elevators Retrofitting stairs and elevators to accommodate large to accommodate large displacementsdisplacements

Forell / Elsesser Engineers, Inc.

Base Isolation RetrofitConstruction Challenges

Minimize building vulnerability Minimize building vulnerability during constructionduring construction

Minimize impact on brittle Minimize impact on brittle elementselements

Isolator installation sequenceIsolator installation sequence

Forell / Elsesser Engineers, Inc.

Seismic Retrofit of San Francisco City Hall

Forell / Elsesser Engineers, Inc.

Historic Rotunda

Forell / Elsesser Engineers, Inc.

Major Earthquake Response Issues

Forell / Elsesser Engineers, Inc.

Fixed Base Response - Shear Walls

Forell / Elsesser Engineers, Inc.

Major Earthquake Response Issues

Forell / Elsesser Engineers, Inc.

Fixed Base Response

Forell / Elsesser Engineers, Inc.

Base Isolated Response

Forell / Elsesser Engineers, Inc.

Sequence of Construction

Forell / Elsesser Engineers, Inc.

New Foundation

Forell / Elsesser Engineers, Inc.

New Foundation

Forell / Elsesser Engineers, Inc.

New Foundation

Forell / Elsesser Engineers, Inc.

Column Jacking

Forell / Elsesser Engineers, Inc.

Column Cutting

Forell / Elsesser Engineers, Inc.

Installation of Base Isolators

Forell / Elsesser Engineers, Inc.

Perimeter Shoring

Forell / Elsesser Engineers, Inc.

Perimeter Side Beams

Forell / Elsesser Engineers, Inc.

Perimeter Side Beams

Forell / Elsesser Engineers, Inc.

Installed Isolators at Perimeter

Forell / Elsesser Engineers, Inc.

New Ground Floor

Forell / Elsesser Engineers, Inc.

New Shear Walls

Forell / Elsesser Engineers, Inc.

Berkeley Civic Center

Forell / Elsesser Engineers, Inc.

C

Isolators at Basement

Section Looking West

Forell / Elsesser Engineers, Inc.

C

Basement Wall / Jacking Pier Construction Sequence

Forell / Elsesser Engineers, Inc.

C

Column Jacking / Isolator Installation Construction Sequence

Forell / Elsesser Engineers, Inc.

Existing Condition

Forell / Elsesser Engineers, Inc.

Install Foundation Reinforcing

Forell / Elsesser Engineers, Inc.

New Foundation Built

Forell / Elsesser Engineers, Inc.

Install Formwork for Jacking Piers Around Existing Columns

Forell / Elsesser Engineers, Inc.

Jacking Pier Construction

Forell / Elsesser Engineers, Inc.

Jacking Pier Built

Forell / Elsesser Engineers, Inc.

Temporary Jacks Installed

Forell / Elsesser Engineers, Inc.

Existing Column Cut

Forell / Elsesser Engineers, Inc.

Existing Column Cut

Forell / Elsesser Engineers, Inc.

Isolator Installed

Forell / Elsesser Engineers, Inc.

Isolator Installed

Forell / Elsesser Engineers, Inc.

Isolator Locking Plates Installed

Forell / Elsesser Engineers, Inc.

Steel Bracing Installed

Forell / Elsesser Engineers, Inc.

Locking Plates Removed

Forell / Elsesser Engineers, Inc.

Isolators Installed

Forell / Elsesser Engineers, Inc.

Base Isolation Response at Perimeter Wall

Forell / Elsesser Engineers, Inc.

Design an ConstructionProblems and Solutions

Forell / Elsesser Engineers, Inc.

Construction Problems and Solutions

Sequence of operationsSequence of operations

Symmetry and balanceSymmetry and balance

Cutting and jackingCutting and jacking

PreloadingPreloading

Temporary lateral strengthTemporary lateral strength

Forell / Elsesser Engineers, Inc.

Structure Types

Unreinforced Unreinforced masonry bearing wallmasonry bearing wall

Steel / masonry infillSteel / masonry infill

Reinforced concreteReinforced concrete

Forell / Elsesser Engineers, Inc.

Example: Unreinforced Masonry Bearing Wall Building

Forell / Elsesser Engineers, Inc.

Salt Lake City and County Building

Forell / Elsesser Engineers, Inc.

Bearing Wall Sequence

Forell / Elsesser Engineers, Inc.

Bearing Wall Sequence

Forell / Elsesser Engineers, Inc.

Isolator Installed at Perimeter

Forell / Elsesser Engineers, Inc.

Example: Steel Framed Building

with Masonry Infill

Forell / Elsesser Engineers, Inc.

Oakland City Hall

Forell / Elsesser Engineers, Inc.

Identification of Existing Building Properties

Archaic materials and infill systemsArchaic materials and infill systems

Structure’s Modal frequenciesStructure’s Modal frequencies

Forced/Ambient Vibration TestsForced/Ambient Vibration Tests

Historic DataHistoric Data

Old Old AccelerogramsAccelerograms

Masonry infill example Masonry infill example

Forell / Elsesser Engineers, Inc.

Identification of Existing Building Properties

Tests of Existing MasonryTests of Existing Masonry

InIn--situ cyclic testssitu cyclic tests

Obtain shear stressObtain shear stress--strain relation, Gstrain relation, G

Obtain diagonal cracking strain,Obtain diagonal cracking strain, ggcrcr

Use G for elastic modeling of structureUse G for elastic modeling of structure

Use Use ggcrcr to determine the limits of to determine the limits of acceptable interacceptable inter--story driftstory drift

Forell / Elsesser Engineers, Inc.

In-Situ Masonry Test

Forell / Elsesser Engineers, Inc.

Stress Versus Deflection

Forell / Elsesser Engineers, Inc.

Local Wall Model

Forell / Elsesser Engineers, Inc.

ETABS Model

(Non-Linear ANSR)

Forell / Elsesser Engineers, Inc.

Forell / Elsesser Engineers, Inc.

Forell / Elsesser Engineers, Inc.

Jacking of Existing Column

Forell / Elsesser Engineers, Inc.

Column Cutting

Forell / Elsesser Engineers, Inc.

Example: Reinforced Concrete

Frame Buildings

Forell / Elsesser Engineers, Inc.

Pasadena City Hall

Forell / Elsesser Engineers, Inc.

Building Section Showing Load Transfer

8

3

(E) Column

7

2

59

6

1(E) Footing (to be Removed)

1

(E) Wall

(E) Basement Grade

1 Shoring

2 Foundation

3

4

5

6

7

8

9

(E) Wall

Moat Cover

4

Grade Beam & S.O.G. Friction Pendulum Isolator PT Threadbar(Clamping Reinforcing)

Concrete Pedestal

Temporary Shoring

PT Conc. Transfer Girder

Concrete Slab

Forell / Elsesser Engineers, Inc.

Installation of Isolators

Forell / Elsesser Engineers, Inc.

Utah State Capital Building

Forell / Elsesser Engineers, Inc.

Overall Basement

Plan

Forell / Elsesser Engineers, Inc.

Forell / Elsesser Engineers, Inc.

Big Idea

Rotunda base must be isolated with Rotunda base must be isolated with remainder of buildingremainder of building

Main problem Main problem –– getting isolators “beneath” getting isolators “beneath” rotunda footingrotunda footing

“Below” and “Above” approaches studied“Below” and “Above” approaches studied

“Above” approach safer to build, requires “Above” approach safer to build, requires less excavationless excavation

Forell / Elsesser Engineers, Inc.

Big Idea

Existing concrete has relatively good Existing concrete has relatively good quality, strengthquality, strength

Maintain footing Maintain footing –– make it work as part of make it work as part of new transfer girdernew transfer girder

“Composite”“Composite”

Allow new transfer structure to span to Allow new transfer structure to span to isolators on new foundations (fig)isolators on new foundations (fig)

New foundation can be built ahead of New foundation can be built ahead of transfer transfer –– outside existing footingoutside existing footing

Forell / Elsesser Engineers, Inc.

Existing Footing

How to Achieve Composite Action and Transfer Load?

Stress Girders

Forell / Elsesser Engineers, Inc.

Forell / Elsesser Engineers, Inc.

Locate and Mark PT Ducts on Flange

How to Achieve Composite Action and Transfer Load?

Forell / Elsesser Engineers, Inc.

Rotunda Footing

Forell / Elsesser Engineers, Inc.

Forell / Elsesser Engineers, Inc.

100th Anniversary Earthquake Conference

Commemorating the 1906 San Francisco Earthquake

Implementation of Base Isolation Implementation of Base Isolation in Retrofit Applicationsin Retrofit Applications

Presented bySimin Naaseh, SE, Principal Mason Walters, SE, Principal

Forell/Elsesser Engineers, Inc.April 17th, 2006