Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over...

Preview:

Citation preview

Figure 9

12.12.10

Illustrative Extended Build-Out Scenario:Stage 1

Arena Opening

SOUR

CE: S

tant

ec 1

2/20

10

ConstruCtionoFFiCE

ConstruCtionstaging

Surface Parkingwith nYPD Parking

Figure 10

12.12.10

Illustrative Extended Build-Out Scenario:Stage 2

LIRR Permanent Yard Complete

BuilDing with Below-graDe Parking comPlete

ConstruCtionstaging

Surface Parkingwith nYPD Parking

SOUR

CE: S

tant

ec 1

2/20

10

Figure 11

12.12.10

Extended Build-Out Scenario:Stage 3

Platform Partially Complete Over Block 1120

BuilDing with Below-graDe Parking comPlete

BuilDing with Below-graDe Parking comPletewith nYPD Parking

POSSIBLECOnStruCtIOn

StagIng

SOUR

CE: S

tant

ec 1

2/20

10

Surface Parkingwith nYPD Parking

Figure 12

12.12.10

Illustrative Extended Build-Out Scenario:Stage 4

Platform Complete Over Block 1120

BuilDing with Below-graDe Parking comPletewith nYPD Parking

BuilDing with Below-graDe Parking

comPlete with nYPD Parking

PossiBLEConstruCtion

staging

SOUR

CE: S

tant

ec 1

2/20

10

BuilDing with Below-graDe Parking comPlete

Figure 13

12.12.10

Illustrative Extended Build-Out Scenario:Stage 5

Platform Partially Complete Over Block 1121

BuilDing with Below-graDe Parking comPletewith nYPD Parking

BuilDing with Below-graDe Parking

comPlete with nYPD ParkingSurfaceParking

POSSIBLECOnStruCtIOn

StagIng

SOUR

CE: S

tant

ec 1

2/20

10

BuilDing with Below-graDe Parking comPlete

Figure 14

12.12.10

Illustrative Extended Build-Out Scenario:Stage 6

Platform Complete Over Block 1121

BuilDing with Below-graDe Parking

comPlete with nYPD Parking

PossiBLEConstruCtion

staging

SOUR

CE: S

tant

ec 1

2/20

10 BuilDing with Below-graDe Parking comPletewith nYPD Parking

BuilDing with Below-graDe Parking comPlete

Figure 15

12.12.10

Illustrative Extended Build-Out Scenario:Stage 7

Final Build Out

BuilDing with Below-graDe Parking comPletewith nYPD Parking

BuilDing with Below-graDe Parking

comPlete with nYPD Parking

SOUR

CE: S

tant

ec 1

2/20

10

BuilDing with Below-graDe Parking comPlete

Figu

re 1

6

12.1

2.10

Illus

trat

ive

Inte

rim

Pub

lic P

laza

on

Build

ing

Site

1

Figure 17

12.12.10

Illustrative Interim Public Open Space on Building Site 3

Figure 18

12.12.10

Illustrative Layout ofTemporary Use on Block 1129 at Arena Opening

Landscaped FencingDirectional LightingParking Access/Egress

ConstruCtionoFFiCe

ConstruCtionstAGinG

Figu

re 1

9

12.1

2.10

Pede

stri

an P

ersp

ecti

ve o

f Bl

ock

1129

-Lo

okin

g N

orth

east

at

Dea

n St

reet

& C

arlt

on A

venu

e

4TH

AVE.

HANSON PL.

ATLANTIC AVE.CLERM

ONT AVE.

CARLTON AVE.

CUMBERLAND ST.

S. OXFORD ST.

S. PORTLAND AVE.

S. ELLIOTT PL.

FORT GREENE PL.

VANDERBILT AVE.

PACIFIC ST.

CAR

LTO

N A

VE.

VAN

DER

BILT

AVE

.

DEAN ST.

BERGEN ST.

ST. MARKS AVE.ST. MARKS PL.

5TH

AVE. FLATBUSH AVE.

6TH

AVE

.

1

18

11

9b9c

2

12

313

17

16

414

5

15

6

7

8

9

10

7a

10b10a

10c

10d

12.12.10

Construction Noise Receptor LocationsFigure 20

SCALE

0 200 FEET100

N

*

*

Atlantic Yards Arena andRedevelopment Project

TECHNICALMEMORANDUM

Office

Commercial/ Office

Institutional

Industrial

Parking

Open Space

Vacant Parcel

Vacant Building

Under Construction

* Developments expected to be completed by time of analysis (see Table 2-1)

Project Site Boundary

Noise Receptor Location

Residential

Residential(with Ground-Floor Retail)

Commercial

1This figure has been revised since the DEIS

Recommended