IAEAInternational Atomic Energy Agency
Information Technology support for INIS products quality
Presentation to 34th ILO Meeting
Zbigniew (ZB) MajewskiSystems Development and Support Group Leader
IAEA 34th ILO Meeting, 2-5 November 2008 2
Structure
INIS Quality Assurance Process
Information Technology
IAEA 34th ILO Meeting, 2-5 November 2008 3
Entry - Select bibliographic materials
• Challenge: Coverage
• Current IT Support:
Processing of bibliographic records acquired from publishers
• Planned IT Support:
- Conference Authority Tool
- Web crawling
IAEA 34th ILO Meeting, 2-5 November 2008 4
Validate INIS input
• Challenge: - Correctness and compliance
• Current IT Support:- FIBRE- IDPS - Batch Validation Module
• Planned IT Support:- Metadata Extracting Tool (MET)- Unicode as INIS coding standard
IAEA 34th ILO Meeting, 2-5 November 2008 5
Check record structure
• Challenge: Correct recognition of elements
• Current IT Support:
Conversion from TTF to XML
• Planned IT Support:
XML as the INIS processing format
IAEA 34th ILO Meeting, 2-5 November 2008 6
Verify quality of document image
• Challenge: Non-compliance
• Current IT Support:
Imaging system
• Planned IT Support:
New scanning hardware and upgraded software
IAEA 34th ILO Meeting, 2-5 November 2008 7
INIS records quality approval
• Challenge: Quality of the “Authority” databases, bibliographic
records and subject indexing
• Current IT Support:
RECORDS processing system (IRPS)
• Planned IT Support:
DOCUMENTS processing system (IDPS)
IAEA 34th ILO Meeting, 2-5 November 2008 8
Compatibility with external systems
• Challenge: Usability
• Current IT Support-
Publishing Atomindex in ISO 2709
• Planned IT Support:
- Publishing Atomindex in XML format
- Unicode
IAEA 34th ILO Meeting, 2-5 November 2008 9
Final Checkpoint Users’ acceptance
• Challenge: User’s and stakeholders’ expectations
• Current IT Support-
INIS On-line Database
INIS Products on CD ROMs
NCL Collection
• Planned IT Support:
Opened Access
Facilitate users’ feedback and collaboration
Enhance usability of the final products
IAEA 34th ILO Meeting, 2-5 November 2008 10
Approaches to Quality
• “zero defects” • High prevention cost
• The cost is lower if the defects are prevented early in the process
• “fitness for use”• Increase of appraisal cost
• How much quality assurance is needed to meet users’ expectations?
IAEA 34th ILO Meeting, 2-5 November 2008 11
Thank you !