HYUNDAI ALUMINUM VINA SHAREHOLDING COMPANY

Version 5.0 (2012.07.30)

ØAddress: B2 Road, B Section, Pho NoiA Industrial Zone, Van Lam District,Hung Yen, Vietnam

Ø Legal Representative: Park Suk BongØ Position: Chairman–General DirectorØ Mobile No: 0914 804 000Ø Email: sbpark@alusash.co.krØTel: (0321) 396 7771~5ØFax: (0321) 396 7770ØBank Name: Vietcombank

Hung Yen BranchØAccount No: 059-100-158-8919 (+VND)ØAccount Holder: Mr. Park Suk Bong

Address: 25th floor, 70 Building, Plot E6,Pham Hung Road, Cau Giay, HanoiTel: (04) 3787 7247Fax: (04) 3787 7249Contact Person: Mr. Jeong Ji BeomPosition: DirectorMobile No: 0916 107 812Email: jbjeong@ialu.co.kr

FACTORY & HEAD OFFICE HANOI OFFICE

BASIC INFORMATION

BUSINESS LICENSE (Page 1 & 2)

BUSINESS LICENSE (Page 3 & 4)

TAX AND COMPANY CHOP REGISTRATION

Environmentally Friendly, Light-weight & Multi-functional Aluminum Extrusion Product

Part of Train LCD Frames

1.BUSINESS PORTFOLIO (1/2)

Solar Frames Structures Marine parts

INDUSTRIAL FIELD

High rise, Intelligent, green building curtain wall works

1.BUSINESS PORTFOLIO (2/2)

ARCHITECTURE FIELD

2. COMPANY HISTORY - VIETNAM

Hyundai Aluminum Co. (Korea,Seoul) : 142 persons (142 / 0 )Hyundai Aluminum Co. (Korea,Ulsan) : 174 persons ( 27 / 147)Hyundai Aluminum Co. (Korea,Daejeon): 308 persons (109 / 199)

1978. 03 Established as a Subsidiary Company of Hyundai Group.1980. 03 Set up the technical cooperation with ALCAN in Canada and started the production of anodizing.1982. 11 Set up the technical cooperation with AWA in U.S.A and automatic paint line.1988. 03 Awarded Fluoropolymer Extrusion Coating Applicator certificate PPG industries1995. 12 Awarded ISO 9001 certificate 1999. 02 Awarded ISO 14001 certificate (Environment management system)2005. 08 Launched as Dongyang Gangchul Group2006. 10 Established Hyundai Aluminum Vina in Vietnam2008. 01 Equipped & Operated full production line (Dies, Billet, Extrusion, CNC Fabrication, Painting & Assembly)2010. 08 Awarded TCVN 5838: 1994 (ISO 6362/1:5:1986:1991)2011. 06 Awarded TCVN ISO 9001:2008 / ISO 9001:20082011. 11 Awarded TCVN ISO 14001:2010 / ISO 14001:2004/Cor.1:2009

Chairman : Mr. Park Suk Bong Hyundai Aluminum Vina (Vietnam) : 910 persons (110 / 800)

3. OWNED PRODUCTION FACTORY

Extrusion ProcessExtrusion Process

Extrusion

Stretching

Cutting

Ageing

Chromate

Primer Coat

Top Coat

Baking

Working Plan

N/c Program

Bar Cutting

Drilling, etc

Final Check, Packing ProcessFinal Check, Packing Process

Final Check

Products List

Wrap, Packing

Loading

Assembly ProcessAssembly Process

Working Order

Material check

Assembling

Size checking

Billet CastingBillet Casting Painting/Finishing ProcessPainting/Finishing Process

Fabrication ProcessFabrication Process

melting

casting

Homogenizing

Site :100,048m2 / Bldg : 57,577 m2

Use : Shop A – Casting/Extrusion (14,256 m2)Shop B – Anodizing/Fabrication(18,044m2)Shop C – Paint, LCD (10,260 m2)Shop D – Special Assembly (14,256m2) -EOffice – 761 m2

4. GENERAL VIEW OF FACTORY - VIETNAM

“A”

“C”

“B”

“D”

Location :75km from Haiphong Port32km from center of Hanoi

Human Resources Total : 910

9. QUALITY CONTROL & ASSURANCE - GENERAL

TCVN Certificates(838 -5842 : 1994 ISO6362/1-5:1986-1991)

ISO Certificates (ISO 14001:2004/Cor.1:2009 and ISO 9001: 2008)

1. PURPOSE

The purpose of this method statements is to ensure integral quality control of during curtain wall

work for the projects. This report describes quality control method each phase to comply with

ASTM, ANSI, AAMA, BS, TCVN, KS, JIS, AS & International Standards.

Items that were developed during the performance mock-up test would be controlled by the

substantial QC/QA plan.

2. SUMMARY

Curtain wall contractors are control their product quality by applying quality control/quality assurance

program to each manufacturer during conducting construction. Material manufacturers should

inspect after they are provided required items, and provide a report showing the results of

inspection. This report is reviewed by quality controller periodically and is filed up to the end of the

completion point in order to carry out smooth progress of construction.

9. QUALITY CONTROL & ASSURANCE - GENERAL

ISO CERTIFICATION (ISO 14001:2004/Cor.1:2009 and ISO 9001: 2008)

TCVN (838 -5842 : 1994 ISO6362/1-5:1986-1991)

END OF PRESENTATIONTHANK YOU