50-60% of bridge failures are due to hydraulics

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

The bridges examined

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Inspection data

Latest Bridge Ratings

Mulholland Road

(13 yrs)

CR115

(7 yrs)

CR85

(12 yrs)

Saunders Road

(9 yrs)

General Recommendation 7 7 7 7

Piles/Cap Footing CS-5 CS-5 CS-5 CS-5

Scour CS-1 CS-1 CS-1 CS-1

Stream Hydraulics CS-2 CS-1 CS-1 CS-1

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Scanning tour

Paul MongioviEric

Prutsman

Steve Catherman

Me

Ken Avery

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Mulholland Road o/Tioga River

STEUBEN CO.

Erwins

Chemung River Basin

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Bridge & site challenges

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

2004 CompletionA.L. Blades$2.9M

The new bridge

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Has the bridge been tested?

Low Chord

Bri

dge

C

on

stru

ctio

n

Dam

Co

nst

ruct

ion

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Debris collection issue

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Which pier nose is best?

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

A better span configuration?

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Facilitate debris removal

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

STEUBEN CO.

Lindley

Chemung River Basin

CR115 over the Cowanesque

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Bridge & site challenges

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

The new bridge

2010 CompletionRamsey Constructors$1.9M

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Shifted bridge location

Existing Bridge Abutments

~15 ft Shift North

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Justifying freeboard

~5 ft

1 ft

Pass 500-yr event / Max Dam Discharge + 10 Yr Tailwater on Tioga Reviewed ice jam history with USACE HEC-9 debris generation and delivery analysis Opening > largest log size anticipated Excess freeboard provided in main flow channel area

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Has the bridge been tested?

Bri

dge

C

on

stru

ctio

n

Low Chord

Dam

Co

nst

ruct

ion

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Unintended consequences?

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Sweat the small stuff

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

CR85 over Tuscarora Creek

STEUBEN CO.

Tuscarora

Chemung River Basin

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

County’s “scariest waterbody”

• Volatile

• Volume:o Drainage Area = 121 mi2

o Q50 = 18,600 cfs

• Velocity = ~15 fps

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

September 2004 collapse

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Bridge & Site challenges

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

The new bridge

2005 CompletionL.C. Whitford

$1.6M

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Has the bridge been tested?

Bri

dge

Co

nst

ruct

ion

Low Chord

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Solving approach erosion

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Quarried rock spurs

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Are they big enough?

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Quarried rock spurs as-built

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Quarried rock spurs today

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Make them a smidge bigger…

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Saunders Road over the Canisteo

STEUBEN CO.

Rathbone

Chemung River Basin

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Floodplain

Bridge & site challenges

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Q50 -7 feet freeboard

Bridge & site challenges

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

The new bridge

2008 Completion

Ramsey Constructors

$2.3M

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Non-Std Freeboard

Non-Std Sag Vert. Curve

Shallow Superstructure

Finding a balanced solution

D/S Armor

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Wingwall layout / flanking

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Has the bridge been tested?

Low Chord Bri

dge

C

on

stru

ctio

n

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Bank restoration - 2008

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Hands on bank restoration

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Bank restoration - today

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Looking forward• USGS / NYSDOT web-based

application

• Provides estimates of future peak flows for any stream/river in NY

• What we have seen so far:o Design storms generally increasing by less than

10% test bridge opening for this?o More frequent storms are more intense (~16%

increase) increased risks/delays during construction, increased maintenance

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Learning assessment

Q1. Which of the following factors affects debris collection at piers?a. Nosing geometryb. Pier location in the channel c. Presence of upstream control structuresd. All of the above

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Learning assessment

Q2. Which is not a form of bio-engineered stream bank protection?a. Rooted Stakesb. Wattlesc. Live Stakesd. Rip Rap

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

Learning assessment

Q3. Rock Spurs should be oriented in which direction?a. Downstreamb. Upstreamc. Perpendicular to the streamd. Parallel to the stream

NATIONAL FIRM. STRONG LOCAL CONNECTIONS.

For additional information or questions:

Anthony J. Borrelli, PE

Bridge Practice Leader280 East Broad Street

Rochester, NY 14604

Email: aborrelli@bergmannpc.com

Phone: 585.498.7777

Recommended