1 Doc Title | Confidential | 2017-05-08Confidential | 2017-05-08

Pascal Fillion, Eng. PMP

Chief Project Manager

HOLISTIC APPROACH TO THE

ELECTRIFICATION OF A 500HP RATED

POWERTRAIN IN COMMUTER EXPRESS

COACHBUS & PARATRANSIT CONFERENCE

MAY 8 2017

2 Doc Title | Confidential | 2017-05-08

PREVOST IS PART OF THE VOLVO GROUP FAMILY

3 Doc Title | Confidential | 2017-05-08

OTHER FAMILAR IMAGES

4 Doc Title | Confidential | 2017-05-08

THE OBJECTIVE OF ELECTRIFICATION

Maximum uptime

Easy maintainability

Efficiency

5 Doc Title | Confidential | 2017-05-08

THE CONDITIONS

Long range trips

Urban driving

6 Doc Title | Confidential | 2017-05-08

A DELICATE BALANCE

Increased

Electrification

level

Technology

readiness

Up-time &

autonomy

7 Doc Title | Confidential | 2017-05-08

TECHNOLOGY AWARENESS

Technology readiness level (TRL)

8 Doc Title | Confidential | 2017-05-08

THE STARTING POINT: A PROVEN PLATFORM

9 Doc Title | Confidential | 2017-05-08

ENERGY MANAGEMENT FOR SYSTEM ELECTRIFICATION

10 Doc Title | Confidential | 2017-05-08

More Potential

for energy recovery

increasedelectrical

generation

Adapted energy storage

better fuel economy

Increased electrification

level

THE ELECTRIFICATION CYCLE

Energy

efficiency

11 Doc Title | Confidential | 2017-05-08

WHERE WAS THE BEST OPPORTUNITY??

12 Doc Title | Confidential | 2017-05-08

INTRODUCTION OF ELECTRIC FAN COOLING SYSTEM

13 Doc Title | Confidential | 2017-05-08

STRONG DIGITAL VALIDATION PLAN

14 Doc Title | Confidential | 2017-05-08

STRONG PHYSICAL VALIDATION

15 Doc Title | Confidential | 2017-05-08

WINTER TESTING

16 Doc Title | Confidential | 2017-05-08

HIGH AMBIENT OPERATING CONDITIONS

Normal driving

Wide open throttle upgrade

Downgrade with retarder

17 Doc Title | Confidential | 2017-05-08

Reliability Program

9 test units

Over 500 000 miles

5 SW generations

18 Doc Title | Confidential | 2017-05-08

THE RESULT

19 Doc Title | Confidential | 2017-05-08

SIMPLE SYSTEM – EFFICIENT AND EASILY MAINTAINED

Red and Yellow fans in 2

Independent circuits

Each fan is

individually protected

Fans controled in

speed

CAC and Radiator fans work separately

20 Doc Title | Confidential | 2017-05-08

SYSTEM DIAGNOSTICS

▪ Cooling fans keep record of

overheating history

▪ All fans are reset (homing) at startup

for status check

▪ The radiators are kept automatically

clean by the fan operation logic

▪ Automatic fan Reversing at startup and

depending of the season.

▪ Minimal cleaning is needed

▪ Radiator can be accessed by opening

the fan panel

▪ Simple visual diagnostics can be

performed without tools

▪ From front instruments menu and

straight visual inspection

▪ If needed a much deeper

investigation can be performed.

21 Doc Title | Confidential | 2017-05-08

THE RESULT -

23 Doc Title | Confidential | 2017-05-08

KEY TAKEAWAYS

It takes a lot of hard work to make something simple.

(Steve Jobs)

The integration effort resulted in a

simple system with easy

maintenance.

The strong collaboration with the

engine manufacturer resulted into

reduced operation cost

A solid validation plan with a 500hp

in mind makes the system reliable in

any kind of conditions and maximizes

up-time

.

24 Doc Title | Confidential | 2017-05-08

▪ Come see our coach outside

▪ Engineering experts: Christophe Lemarechal & Jeff Gagné