View
1
Download
0
Category
Preview:
Citation preview
Hinkley Point C – our approach to
Health and Safety
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED1
Iain Graham Head of Health & Safety
Where are we…?
2
Hinkley Point
EDF Energy’s Nuclear New Build Projects © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
3 Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
4
What we want to build
• Areva/EDF evolutionary design
• Pressurised water reactor
(like Sizewell B)
• 2 x 1630 MW (electrical)
• Each can supply around 2.5m homes
• Uses 17% less uranium and produces less waste
• Under construction in France
• c. 900 operating staff
• 60 year operating life
Cross section of single UK
EPR (illustrative layout)
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
Title of Presentation © 1 January 2014 EDF Energy plc. All rights
Reserved5
Model of nuclear
reactor
EDF Energy’s Nuclear New Build Projects © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED21
Hinkley Point C – Enabling Construction
Europe’s 2nd biggest hotel development
On-site accommodation for
c.500 workers
Combwich Wharf Bridgwater highway
schemes
Off-site accommodation for
c.1,000 workers
2 freight management,
4 park and ride facilities
• An additional £20 million investment into local road
infrastructure. The majority already completed.
• Temporary Jetty on-site – able to deliver 80% of the
aggregates required for construction
6 Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
7
The Journey So Far….Hinkley Point C will be the first nuclear power station to be built in the UK in a generation.
2006 2009
JAN 2006Government policy proposes
nuclear as a significant part of our
future energy mix.
OCT 2008Early engagement begins with
local residents.
2012
NOV 2009Formal consultation begins with
local communities over 2 years.
2013 2014 2016
DEC 2012UK EPR reactor approved under
GDA.
MAR 2013Secretary of State approves
construction of HPC.
OCT 2014European Commission
approves agreement between
EDF Group and UK
Government.
OCT 2015EDF and CGN agree joint
investment in HPC.
SEP 2016Final approval granted
by UK Govt.
MAR 2017First Nuclear Safety Concrete used
on-site
2017
SEPT 2017East Office Welfare
Complex Open
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
2018
DEC 2017Cooling Water Pipe
installation Starts
FEB 2018Pre-stressing gallery
for Unit 1
Hinkley Point C Indicative Construction Timeline
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
9
Milestones Achieved So Far….
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
March 2017 - The First Nuclear Safety Concrete pour at Hinkley Point C
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
May 2017 - North West area of site with heavy haul road and material crushing operations in the foreground
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
June 2017 - Inspection of the rock formation before blinding concrete is applied
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights
reserved NOT PROTECTIVELY MARKED 12
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
July 2017 - Work continues on the jetty with girders being installed to bridge the crosshead saddles
13
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
The jetty when complete will allow all aggregate to be delivered by sea
14Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
October 2017 - Work continues on the HPC on-site accommodation campus
15
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
November 2017 - Progress of Unit 1 Nuclear Island pre-stressing gallery trench construction
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
December 2017 – The sixth and final project goal of 2017 was achieved with the start of the installation of the CRF cooling
water pipes.
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
December 2017 - Two sections of the CRF pipes are welded into couples before they are moved to the platform
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
January 2018- Enabling team celebrating completion and handover of the foundations for Unit 1 Nuclear Island
Comparison of Safety Performance
CHSEC Presentation Aug 2017| NOT PROTECTIVELY MARKED | ©15 Aug 2017 EDF Energy plc. All rights Reserved.20
Notes
• Rates are calculated in accordance with RIDDOR 1995 definitions (ie injuries resulting in more than 3 days absence from work.
• Rates are rolling twelve month averages.
• HPC trace starts at award of FID. (October 2016)
• Other projects’ AFR rates are shown at same relative time on project schedule.
• For comparison , Tideway AFR-3 for March 2018 = 0.10; HPC AFR-3 for March 2018 = 0.05.
Our Safety Challenges
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED 21
• Contractors
• Supervision
• Procedural Compliance
• Culture
Our Safety Challenges - Contractors
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED 22
• Selection and evaluation
• Early Contractor Involvement
• Clearly setting expectations
• Collaborative Working
• Developing Common Standards
Our Safety Challenges - Supervision
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED 23
• Formal training through Institute of Learning and Management
• Dedicated supervisor community
• Coaching in the field
• Supervisor forums
Our Safety Challenges - Procedural Compliance
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED 24
• Focus on quality
• Developed ‘right first time’ metrics
• Focused training sessions and authorisations
Our Safety Challenges - Culture
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED 25
• Behavioural Safety training
• Leaders lanyard programme
• Recognition
• Engagement
Health & Well-being
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED 26
• Occupational Health team on site
• Pre-employment questionnaires and safety critical medicals
• Health risk management – support to contractors
• Proactive health and well-being initiatives
• Liaison with local healthcare trust
• Itinerant workers with unhealthy lifestyles…
• Focus on Mental Health
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved
NOT PROTECTIVELY MARKED 27
Introduction to HPC © February 2018 EDF Energy plc. All rights Reserved NOT PROTECTIVELY MARKED
Thank you
Intro to HPC © EDF Energy plc 18 Jan 2018 All rights reserved NOT PROTECTIVELY MARKED
Recommended