HEAnet Services Update
2014
Strategic Plan 2014-2016
Continue to be the trusted provider of networking and infrastructure services
Be the preferred broker of cloud and other services to our clients
Be recognised for fast, agile, efficient delivery of shared services
CAMPUS PRIVATE CLOUD
PRIVATECOMMUNITY
CLOUDPUBLIC CLOUD
Seamless Connectivity (wired, WiFi, 4G)
Seamless Federated Access (& SSO)
Seamless Roaming (eduroam)
Private Community Cloud
Brokerage (to public cloud services)
Adding value in the Cloud Value Chain(s)
Brokerage
Application Services
InfrastructurePlatform
IaaSConnectivity,
Network Futures,
SDN
Data Centre,
Storage,
Compute
e.g. VLEs,
Exam systems,
Repositories
License Negotiation (Software & Content) - Procurement/Frameworks -
Legal Templates – Tailored Public SaaS/IaaS - Federated Access - Peering
Strategy Informing New Multi-Layered Services Model
THE NETWORK UNDERPINS THE HIGHER LAYERS
Strategy Informing New Organisation Structure
NETWORKINFRASTRUCTURE
PLATFORMAPPLICATION
SERVICESBROKERAGE
NETWORK
INFRASTRUCTUREPLATFORM
APPLICATIONSERVICES
BROKERAGE
Layer 2/IP (RMAN) Equipment Upgrade Planning
Schools 100Mb Roll-Out Completion
Backbone Optical Layer Completion
EduStorage Expansion
Carriganore High-Power Data Centre
IaaS Proof-of-Concept
High-Availability Managed Moodle
UCD Webhosting Solution
Vidyo Desktop Conferencing Service
Student Mobile Broadband Deal (with Meteor)
IReL – Irish Research e-Library
Edugate – Standby IdP/Managed IdP/Hosted IdP
2014 Service Layer Highlights
Network Engineers
Platform Engineers
Software Engineers
Product & Negotiation
Skills
Network Layer Update
• Equipment is already 10 years old. Reaching End of Support
• Increased failure rate. Impact on client services
• Increased security and privacy
vulnerabilities
• Threat of clients’ loss of trust
• Cost of investing in current equipment is higher than replacing equipment
• Difficulty in creating new services and migrations
Old Network for New?
0
2
4
6
8
10
12
Hardware faults per year
2011
2012
2013
Q1-Q3 2014
•Integration of two network cycles into one -> reduced site and service
disturbance
•Meet the ever-increasing traffic throughput demands
•Ability to deliver new services aimed at improving intra-campus
connectivity and mergers
•Bring the benefits of upcoming network futures to client premises in
terms of virtualization and software defined networks for cloud and shared
services
•Reduced carbon footprint in client premises
Benefits
Current and proposed architecture
Item Current Proposed
Number of devices 260 180
Client facing interfaces 315 140
Operation tools 10 6
Services 1 + 2 5
Reduced footprint
Virtualisation
Optical
Optical
Optical
L2/MPLS
L2/MPLS
L2/MPLS
IP/CPE
IP/CPE
IP/CPE
Optical
Optical
Optical
New
New
New
Current
Proposed
L2VPN -> NewTransparent Ethernet and incl. P2P
L3VPN -> New
IPv4/6 Unicast and Multicast
NaaS/SDN: OpenFlow services
Benefits
New
New
New
Client
ClientClient
Client
ClientClient
Client
ClientClient
New
More capacity
More services
Upcoming Cloud
Flexible and consolidation
Benefits
Superior resilience to
satellite sites in access
rings
Take full advantage of /
leverage dark fibre
rings
MPLS MPLS
New New
New New
L2 L2
Current
Proposed/intended
RMAN Project Timeline
• Subject to funding available
• Staged approach
• Transition Q4 2015 – Q2 2016 + Q3 2016 – Q1 2017
• client collaboration
• client input
•Minimal service interruption
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Preparation Stage
Project justification and grant application Board
Technical Dialogues
HEA approval to publish CFT (Go/No-go)
Prepare, publish, evaluate and award tender
Stage I
Contract formulation and Order placement
Installation
Acceptance and payment
Stage II
Order placement
Installation
Acceptance and payment
2014 2015 2016 2017
Involving clients in our work
•The next GEANT project (GN4) will start in May 2015.
Let us know if you are interested in taking part in activities, such as:
•SDN/NaaS/NFV
•Energy conservation
•Testbed as a Service
•Cloud procurement
•HEAnet is interested in increasing the cooperation with clients.
Ideas are:
•Revive existing technical e-mail lists
•Mutual secondment
•Webinars by and for the clients
•Best practise document around common issues: such as Wi-Fi,
campus networks, Infrastructure setups, strategic plans
•Provide advice on how to include wide area trends
HEAnet NOC Update
• 2015 will see the establishment of a HEAnet Service Desk within the NOC
• Change from staffed by rota to staffed by two permanent level 1 engineers
• Reaction to the changing nature of queries and increased demand off network & service development
17 Years of Change
• Not the NOC of 1997, nor 2004, nor even 2010
• Majority of queries now revolve around service set-up & requests for info
• CCIE level engineer not needed to set up a webhost
• Need to free up engineers to work on network evolution & service delivery
All Change?
• Dedicated staff brings continuity and increased efficiency
• No reduction in access to expertise as required
• Contact details remain (noc@heanet.ie & 016609040)
• Escalation as required to level 2 & 3 engineers and management
Outline Process
Step 1
• Query raised via web form, email or phone
• Received & resolved by 1st level SD eng
Step 2
• Escalation as required to:
• Functional team; 2nd or 3rd level engineer
Step 3• Further escalation to management as
required
Infrastructure
&
Application Services
Services Update
• Community Cloud update
• EduStorage
• Colocation Capacity
• Web Site Hosting
• Security Scanning
• Video Conference Booking
• Streaming service enhancement
Community Cloud Update
• What is it?
– Ciera
Compute Infrastructure for Education, Research & Academia
– Virtual Machines as a Service
– Client Network Integration
– Linked to multiple clouds
– Federated, integrated, production quality
– Use case test bed
Ciera
Ciera
Ciera
• Portal to many clouds
• VMs connecting to client Campus LAN
– Virtually homed servers
• EduStorage integration
• EduGate integration
– RBAC
Ciera
• IaaS in multiple clouds
– HEAnet Ciera
– Amazon AWS
– Microsoft Azure
– Google Compute (in progress)
– vSphere (early stages)
• Workshop
– Friday 11am, Laurel Suite
Ciera
• Huge learning opportunity
• Building block for networks
– SDN
– L2 p2p
• Networking project
Ciera
• To Do list…
– Stress testing
– Security Analysis
– Acceptance Testing
– Campus Cloud Infrastructure integration
• Ready for early adopters
– NCI, MI, UCC, UCD, UL
– January 2015
EduStorage
• How is it going?
EduStorage
EduStorage
• 22 Clients
• 300 TB Client production services
• Scale-out requirement getting close
0
50
100
150
200
250
300
350
TB Allocated
TB
Colocation
CoLocation
• 3 * Data Centres
– Parkwest 10 2.25 free
– Blanchardstown 19 2 free
– WIT 13 0 free
• More planned
– “Enterprise grade” 8 + 10
– High Power specialist applications
Maynooth University, TCD
Website Hosting
• Demand for 2 styles
• Small sites
– Many different applications
• Enterprise sites
– Fewer applications
– Resilience, fault tolerance
– Directory/Campus services integration
Enterprise Website Hosting
Enterprise Website Hosting
• Virtual Learning environments
– loop.dcu.ie
– moodle.mic.ie
– moodle.wit.ie
• Large websites
– www.ucd.ie
Enterprise Website Hosting
• Key issues
– Reliability engineering
– Testability
– Support
– Incident response
• Learning outcomes
– Fault tolerance means regular fault simulation
– Testing
– Communications
Security Service
• New: Vulnerability Scanning
• Detailed technical audit + regular reports
• External & Internal scanning
• In-depth web application tests
• Single Supplier Framework license costs
Vulnerability Scanning
Video Conferencing
• New Booking Service: JAnet’s v-scene
• Schedule meetings
• Setup meeting recording
v-scene
Streaming Service
• media.heanet.ie
– Content Management Service
– Video Content
• On Demand content
• Live Content
• Audience selection
• HTTPS for VLE embedding
Summary
• Ciera
– Come and explore Jan 2015
• CoLocation
– Enterprise Hosting + more
• EduStorage
– Scaling out
• Security Scanning
– Functionality boost
Summary
• Website Hosting
– Start small, scale big
• Multimedia
– Video Conference Booking, Recording made easy
– Content storage for your users
Brokerage Update
Brokerage Structure
CONTRACT
MANAGEMENT
SERVICES
BROKERAGE
Brokerage Objectives
• Facilitate easier access to third-party services
• Facilitate more cost-effective access to third-party services
• Aggregate demand to generate savings
• Aggregate demand to leverage service improvements
• Reduce procurement burden on HEAnet clients
• Support clients with use of procurement agreements
• Foster collaborative approach with Clients & Vendors
• Collaboration with international peers
• Stimulate convergence to standards (e.g. SAML)
Edugate Update
Edugate growth
1% 3% 3%3%
14%
76%
Distribution of 10 million logins since January
Misc Internal Apps
Combined Moodle
Combined Edugate (excl. Blackboard)
Combined campus library systems
Combined Blackboard
Combined Google Apps
2014 Edugate Update
Edugate authentications peaking in excess of 100,000 logins daily!
20 new Edugate services added this year
Connecting 36 institutions to 173 different services
12 Irish HEIs joined eduGAIN
IdP Service Portfolio: Standby IdP – Managed IdP – Hosted IdP
eduGAIN
List of eduGAIN members:http://www.edugain.org/technical/status.php
List of eduGAIN entities:http://www.edugain.org/Metadata/?from=http://mds.edugain.org/feed-sha256.xml&entities&auto
eduGAIN: 536 Services / 150 Institutions / 12 Irish Institutions
IReL Update
IReL Update
IReL Usage Trend 2007-13
0
2
4
6
8
10
12
14
16
2007 2008 2009 2010 2011 2012 2013
Mill
ion
s
E-journals
E-Book
Database
Value for money 2007-13
€0.00
€0.50
€1.00
€1.50
€2.00
€2.50
2007 2008 2009 2010 2011 2012 2013
Cost of search/full text request
Contract Management Update
15
20
25
30
35
40
2011 2012 2013 2014
Total Live Agreements
Current Portfolio
• Storage Virtualisation• Storage Hardware• Eduserv agreements (14)
• Microsoft Campus refresh• Adobe Campus
2011
2012
• Adobe CLP• Adobe Connect • AntiVirus• Articulate• Blackboard Collaborate • MacOS/IOS (Apple) Framework• Microsoft Framework• Polycom VC Equipment Support• Server Hardware• Student Stores for Adobe and
Microsoft• Vulnerability Scanning
2013
2014 New Additions (1)
• Adobe VIP• Application Virtualisation
Software2 Zinopy
• Monitoring and Alerting Damovo Fastcom Logicalis
• VLE Framework Blackboard Desire2Learn Enovation Instructure Learning Technology Services Moodlerooms
2014
2014 New Additions (2)
• Vidyo h/w, s/w Framework• Image Supply Systems• PlanNet21• Vu2Vu
• Video Platform Framework Kaltura Mediacore Panopto
• Student Mobile Broadband
2014
For a full list of agreements please visit:
http://www.heanet.ie/brokerage
DCU - 201410 59
Services Brokerage Update
Services Brokerage
• JANET Video Conference Booking Service
• JANET File Sync & Share:
– Box
– Capito
– Microsoft
– Q Associates
(http://www.heanet.ie/brokerage/file-sync-and-share)
Work in Progress
• Microsoft Legal Due Diligence (with JANET)
• Moodle SaaS (Feasibility Study)
• VDI (Discovery exercise)
• Internet 2 Services (via eduGAIN)
• GÉANT Brokerage Group
• More Frameworks...
Peering
– @ INEX: Amazon, Google, Microsoft, Yahoo, etc.
– @ AMS-IX (via GÉANT): Blackboard, Facebook, OpenDNS, WikiMedia, etc.
– Layer 2 peering requirements?
HEAnet Vision for Multi-Cloud Environment
HEAnet Private
Community Cloud
Campus
Private Cloud
Single federated portal to multi-cloud environment
Public Clouds
Summary Highlights 2014
• 100Gig Capable Optical Backbone in place
• Layer2/IP Equipment replacement project underway
• Client primary connections typically 100% available
• All Post-Primary Schools @ 100Mb
• HEAnet a leading NREN re Cloud Developments
• Hosting Moodle for DCU, WIT & Mary Immaculate
• Hosting UCD’s website
• Edugate now peaking above 100,000 log-ins daily
• IReL merged into HEAnet from 1 April 2014
• Expansion of NOC to support extended services
Questions?