Health & Behavioral Sciences Medical Education Building
BUILDING CONCEPTUALIZATION| 03.18.2021
2
ONE SCHEDULE REVIEW
TWO HIGH LEVEL PROGRAM REFRESH
THREE PROGRAM ORGANIZATION CONCEPT
FOUR SITE OPTIONS DISCUSSION
agenda
FIVE NEXT STEPS
3
UC MERCED HBSME Visual Schedule Updated: #######
Week of 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24
Programming
Site Study Development
Campus Context Development
Narrative Development
Draft Report / Page Turn
UCM Review
Report Revisions
Final Deliverable
Programming Orientation
Steering Ctte Meetings (Bi-Weekly)
Meeting Focus
Sub-Committee Workshops *
Detailed Programming Breakouts **
Cost Modeling - Prelim Confirmation
Cost Modeling - Detail Analysis
* Sub-Committee Workshops dates TBD; 1-2 days for two weeks in a row** Breakouts - TBD as required to cover all spaces
AprilMarchFebruaryJanuary May
1 21/13
Prelim Concept
Final 5/20
Draft 4/22
Site Concept Development Final
Prelim Context Final Context
Draft Narrative
UCM
SCB
Draft Developed
Reconciliation Program Development
-Orientation & Overview-High Level Program
Part A - Programming DevelopmentPart B - Site Concept Development
ProgramConfirmation and Refinement
Budget /Benchmk
1/13-1/14
1/12
3 542/3 2/18 3/3 3/17 6 3/31 7 4/15 4/29 9 5/128
Program RefinementSite Concept
Program RefinementBuilding Concept
Program RefinementBuilding Concept
Program ApprovalConcept Approval
Cancelled Cancelled
1.0 SCHEDULE
42.0 PROGRAM
DEPT ID # SPACE DESCRIPTION NOTES / QUESTIONSAREA
118,200181,60065.09%Efficiency
Total Assignable Square FeetTotal Gross Square Feet
5
GROUND
PLAZA
LEVEL 2
LEVEL 3
3.0 PROGRAM ORGANIZATION
6
ITC
ITC
ITC
ITC ITC ITCITC ITC ITC ITC ITC ITC
ITC
ITC
ITC ITC ITC ITC ITC ITC
W
W
W
W
W
W
W
WW
W W W W W W W W
W
W
W
W
W
W
W
W
WWWWWWWWWW
W
W
W
WW
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
W
W
W
WWWWWW
W
WW
W
W
W
W
W
W
WW
W
W
W
WW
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSSSSSS
SSSS
SSSS
SSSS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSS
SSSS
SS
SSSS
SS
SS
SS SS SS SS
SS
SS
SS
SS
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
CHWRGASGAS
GAS
GAS
RW
EE
E
E
E
E
E
E
E
EEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEEEE
E
E
E
E
E
EEE
EEE
E
E
E E E E E
E
E
E
E
E
E E E E E
4.0 CONCEPTUALIZATION
GRAN
GLCR
SRSH
PAV
SRE BSP
ACS
ELSH
ADMIN
CCEN
+218’ 0”
+230’ 0”
+230’ 0”
+223’ 0”
COTTONWOOD MEADOW
+213’ 0”
+213’ 0”
+208’ 0”
+207’ 0”
+209’ 0”
+218’ 0”
+215’ 0”
+245’ 0”+240’ 0” +235’ 0” +230’ 0”
+225’ 0”
+220’ 0”
+215’ 0”
+210’ 0”
+210’ 0”
+200’ 0”
+205’ 0”
+200’ 0”
+200’ 0”
+205’ 0”
+200’ 0”
+205’ 0”
+210’ 0”+200’ 0”
+200’ 0”
+214’ 0” +230’ 0”
+210’ 0”
+215’ 0”
0’
50’
100’
250’
N
BUS ROUTE
BIKE ROUTE
PEDESTRIAN ROUTE
VEHICULAR ROUTE
SERVICE DRIVE
BUS STOP
CAMPUS ENTRY
LEGEND5 MIN WALKING ROUTE
LEGEND
GENERAL/VISITOR/BUS PARKING
RESERVED ZONE/LIBRARY PARKING
SCHOLARS/ECEC LOTS
FACULTY/STAFF/GRAD PARKING
MAIN ENTRANCE
LEGEND
SECONDARY ENTRANCE
UTILITIES
DESTINATION WALKING ROUTE
SERVICE AND RECEIVING BUS ROUTE
BIKE ROUTE
PEDESTRIAN ROUTE
VEHICULAR ROUTE
SERVICE DRIVE
BUS STOP
CAMPUS ENTRY
LEGEND
SHARED SERVICE ACCESS
SITE STUDY ZONE
BUILDING STUDY AREA
AREA EXCLUDED
BUILDING STUDY AREA
AREA EXCLUDED
7site axonometric
89site axonometric
PLAZA BRIDGE:- Extension of Academic Plaza- Unobstructed Southerly View- Geometric Companion to BSP- Building Wings Flank Exterior Circulation- Framed Plaza; Termination of Cottonwood Meadow- Direct Connection at Grade to Parking
scheme a - concept
9SCheme a - Ground
10SCheme a - Plaza
11SCheme a - Level 3
12SCheme a - Level 4
13SCheme a - Massing Envelope
149site axonometric
PLAZA BRIDGE:- Extension of Academic Plaza- Unobstructed Southeasterly View- Geometric Companion to ACS/SRE/GLCR- Building Wings Flank Exterior Circulation- Framed Plazas- Direct Connection at Grade to Parking
scheme a2 - concept
15SCheme a2 - Ground
16SCheme a2 - Plaza
17SCheme a2 - Level 3
18SCheme a2 - Level 4
19SCheme a2 - Massing Envelope
209site axonometric
MEADOW BACKDROP:- ACS Portal Extension- Building on Higher Ground- Geometric Reconciliation (ACS/BSP)- Building Wings Framed by Exterior Circulation- Visual Termination of Cottonwood Meadow- Parking Shielded by Building
scheme b - concept
21SCheme B - Ground
22SCheme B - Plaza
23SCheme B - Level 3
24SCheme B - Level 4
25SCheme B- Massing Envelope
269site axonometric
PLAZA PODIUM:- Extension of Academic Plaza- Unobstructed Southeasterly View- Geometric Companion to ACS- Simple Bar Building Bridges Podium Gateway- Podium Offers Elevated Plaza/Vista- Direct Connection at Grade to Parking
scheme c - concept
27SCheme C - Ground
28SCheme C - Plaza
29SCheme C - Level 3
30SCheme C - Level 4
31SCheme C- Massing Envelope
32
Scheme A2
Scheme c
SCheme A
SCheme b
SCheme overview
Recommended