GSI Double Storey Building System
Marketing Dept
© 2014 AGCO Corporation1
Double Storey
© 2014 AGCO Corporation
Specification
• Minimum soil bearing is 150kn/m2.
• Concrete grade for foundation structure is G25.
• Steel bar strength for T bar is 460mpa, R bar is 250mpa and BRC is 485mpa.
2
Foundation Design Specification
1.To clear the site and
leveling.
2. Prepare the access
road.3.Excaveted and
casting the footing.
4.Casting stump and
cover up the footing.5.Casting the ground
slab.
6.Foundation work complete
start install steel structure..
© 2014 AGCO Corporation
Materials: Ultra Galvanized High Tensile Steel.
Triple layers coating system (Zinc, conversion film & resin)
20%-30% higher in yield strength
20% lighter in weight
3
Galvanized Steel Truss
© 2014 AGCO Corporation
All welded trusses will final applied with a zinc spray coating at every welding
point as a protection layer and to prevent rusty.
Used thicker thickness square tube’s webs with 1.6mm to 3.0mm with minimum
yield strength 350 Mpa compare to competitors which used thinner tube.
Hot dip Galvanized Tubing with Zinc coat mass: 600 ~ 800 g/m².
4
Welded Truss
Material: GI
© 2014 AGCO Corporation5
Material: GI
Clear organic coating
Conversion coating
Hot dip galvanized
© 2014 AGCO Corporation
An effective venting system provides year round benefits:
During warmer months, ventilation helps keep attics cool.
During colder months, ventilation reduces moisture to keep attics dry. It also
helps prevent ice dams.
Other benefits: (all four seasons of the year)-added comfort-protect against
damage to materials and structure-help reduce energy consumption.
6
Attic Ventilation
Unvented:
Radiant heat penetrating through roof sheathing and attic
enters living areas of poultry shed.
Vented:
With proper ventilation, the heat is vented out of the attic,
keeping living areas cooler.
© 2014 AGCO Corporation7
Double Storey Construction Methods
Steel Floor Deck Precast Concrete Slab
Solution to land shortage problem
Save concrete as much as 30%
Savings in form/mould materials
OR
© 2014 AGCO Corporation
A new way of building combined lying of the steel floor deck and reinforcing and
has remarkable saving in materials, work and expenses.
When lying the steel floor deck only a sparse support from below is needed. The
distance between the supports varies form 1.0m to 2.0m depending on the
thickness of the sheet and the concrete layer.
The completed slab (steel floor deck & concrete mixed) acts as a reinforced
concrete.
The steel floor deck is available in thickness between 0.8mm and 1.0mm with
zinc coated at both sides.
Able to fit the load of 250kg/m
8
Steel Floor Deck
2
© 2014 AGCO Corporation
Composite steel deck floors consist of
a profiled steel deck with a concrete
topping. Included in the concrete is
some light welded mesh
reinforcement which acts to control
cracking, to resist longitudinal shear
(A kind of force) and, in the case of
fire, to act as tensile reinforcement.
The profiled deck allow the concrete
and steel to bond and share load.
Composite action between the
supporting beams and the concrete is
created by welding shear studs
through the deck.
9
Steel Floor Deck Construction Details
© 2014 AGCO Corporation
I-beam size & thickness is depends on the structure & floor loading
design.
10
Steel Floor Deck - Floor Beam
© 2014 AGCO Corporation
No Description Benefits
1 Saving in structure materials Only separate beams and the edges of the slabs are bonded.
This save timber 70% - 80%
2 Easy construction of the structure The floor decks are easy assemble
3Saving in underside reinforcement
steel
No underside reinforcement needed. Save reinforcement steel
80% - 90%
4Thinner slabs can be used because
of the rigidity of metal sheet Save concrete 15 – 30%
5 Inexpensive cost the cost same as ordinary profiled steel sheet
6 Save time and money No discharging of the steel sheets
11
Steel Floor Deck Advantages
© 2014 AGCO Corporation
Floor Deck – Project Time Comparison
12
Conventional RC structure
Item Discreption Day Progress Schedule
Project duration 26
Column Fromwork 1
rebar 1
casting 1
demolish formwork
8
beam & slab Formwork
3
Rebar 3
casting 1
demolish formwork
8
Composite RC structure
Item Discreption Day Progress schedule
Project duration 17
column Fabrication 1
installation 1
Beam Fabrictation 1
Installation 1
Slab Floor deck 1
Shear stutd 1
brc 1
propping 1
casting 1
Demolish propping
8
*All comparison base on 12mx3m model.
Project
duration
shorten
by 9
days
© 2014 AGCO Corporation
Steel Floor Deck – Double Storey Measurement
13
© 2014 AGCO Corporation
Lower floor intermediate column with round pipe profile for better ventilation
efficiency
14
Steel Floor Deck: Lower Floor Column
I Beam
© 2014 AGCO Corporation
Steel Floor Deck
15
1 2
3 4
© 2014 AGCO Corporation
Floor Deck in Detail
16
© 2014 AGCO Corporation
1. Fast & easy installation
Precast Concrete Slab
17
© 2014 AGCO Corporation
2. Seal the gap with cement screed
Precast Concrete Slab
18
3. Farm picture with precast
concrete slab flooring
© 2014 AGCO Corporation
Since precast is manufactured in a controlled casting environment it is easier to
control the mix, placement, and curing.
Quality can be controlled and monitored much more easily.
Can cast regardless of any weather conditions and get the same results.
Less labor is required and that labor can be less skilled.
Rapid construction lead time on site.
Save topping concrete cost, the 50mm thickness is sufficient to support the
weight.
19
Precast Concrete Slab Advantages
© 2014 AGCO Corporation20
Precast Concrete Slab – Double Storey Measurement
© 2014 AGCO Corporation21
Floor Beam Installation
© 2014 AGCO Corporation22
Site Picture-Precast Floor
© 2014 AGCO Corporation23
Precast Concrete Slab
© 2014 AGCO Corporation
Project reference – Double storey by Precast Concrete Slab
© 2014 AGCO Corporation
Project reference – Double storey by Precast Concrete Slab
© 2014 AGCO Corporation
2015 VIV ASIA: Double Storey Structure Model Display – Steel floor deck