Group 14-on density

Preview:

DESCRIPTION

 

Citation preview

BLOCK 19

urban designexercise 1

densification scenarios in cuzco

group 14

Cecilia ferrandodaria grinevich

francesca palandri

flooding problems of the lot lack of sewage sistem

BLOCK 19status quogeneral block information

the block’s parcels are much less dense than the other parcels of the city.it probably was a cultivated land on which houses were recently built.

flooding area

built area

airport’s limtis

no sewage system

secondary pipes

existing pipes

project collectors

BLOCK 19status quo

A

B

general block information

shadows interpretation

Aerial photo A. Perspective noth side

B. perspective south side

BLOCK 19status quo

Axonometric view 1

Axonometric view 2

model view 1

BLOCK 19status quo

urban quantities

BLOCK 19status quo

urban quantities

BLOCK 19status quo

BLOCK 1950% Hypothesis 1

urban references - amsterdam, java island, Sjoerd Soeters

BLOCK 1950% Hypothesis 1

urban references - six of a kind, eurika, A101 competition, moscow

BLOCK 1950% Hypothesis 1

BLOCK 19enclosed public spaces

the urban distribution concept

Axonometric view 1

Axonometric view 2

50% Hypothesis 1

site plan

public space

buildings

connections

considered lots

BLOCK 19

BLOCK 1950% Hypothesis 1

considered lotsModel’s view

toral block surface 23418 m2

existing built surface 37382 m2

selected lots’ area 14987 m2 buiding index 2.8

demolished surface 2758 m2

built integration needed 41965 m2

new Built space 41833 m2

new total 79215 m2

average free space 47 %

section

BLOCK 1950% Hypothesis 1

sketches and conceptual views

BLOCK 1950% Hypothesis 2

the urban “injection”

The first proposal was a very enclosed and urban one; for the second hypothesis we want to experiment the opposite vision:

- punctual densification

- maximization of the green area by maximizing height of the buildings

le corbusier - sketches for la ville radieuse

BLOCK 1950% Hypothesis 2

potential green corridors

distribution scheme

BLOCK 1950% Hypothesis 2

considered lotssite plan

built footprint

public area m2

Axonometric view 1

Axonometric view 2

BLOCK 1950% Hypothesis 2

considered lots

toral block surface 23418 m2

existing built surface 37382 m2

selected lots area 8752,9 m2

buiding index 2.8 demolished surface 8831 m2 new Built space 24508 m2

New total 61890 m2 overall free space 47 %

Model’s view

section

BLOCK 1950% Hypothesis 2

sketches and conceptual views

BLOCK 1950% Hypothesis 2

sketches and conceptual views

BLOCK 19100% Hypothesis

potential green system

as for the second 50% hypothesis, in the 100% we tried to maximize the green surface. we wanted to have a fluid and accessible green public space. in order to do so, we implemented densification strategies not to the single lots, but to the whole block, with:

- a localized densification around the already dense existing parts

- the creation of a system of public green spaces integrated and well connected both in se and with the surronding context

BLOCK 19100% Hypothesis

roofs plan

built footprint

free spaces

public area 10903m2

Axonometric view 1

Axonometric view 2

considered lots

BLOCK 19100% Hypothesis

Model’s viewconsidered lots

toral block surface 22449 m2

(without the roads)

lot selected area 22449 m2

buiding index 2.8

Built space 62859 m2

Total free space 56%

public area 48,6%

section

BLOCK 19100% Hypothesis

sketches and conceptual views