Go‐Go Compact · Go‐Go Compact‐ Zipper Closure ‐ Steps 15‐19 15) Center & pin the...

Preview:

Citation preview

Go‐Go Compact‐           

Zipper Closure ‐  Steps 15‐19 

15) Center & pin the lower 3.5” of zipper vertically & RSD over the marked centerline. 

3.5” 

Here’s some more pictures detailing the zipper installation.

18) It’s SUPER important to place MORE pins lengthwise along zipper tapes as close as possible to zipperteeth, pushing zipper tape as far BACK as possible from raw edges around entire circumference of bag. (This will be very important later.) DO NOT remove these new pins until completing steps 37 +46.

19) Tie a fabric scrap or shoelace(~5”long) thru zipper pull opening.

Pull zipper as far possible to side edge of Base & place pins at zipperpull to hold it there for now. 

Recommended