View
249
Download
1
Category
Preview:
Citation preview
Page 1
GIZ BUR Template
African Regional Group: Peer-to-peer exchange
on BURs in Berlin, October 15th 2014
Seite 2
National Communication, BURs and MRV
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
National Communication
• National Circumstances
• National GHG Inventory
• Adaptation Measures
• Mitigation Actions
• Other Actions: tech
transfer, public awareness,
reserach
• Financial, technical and
capacity needs
Biennial Update Report
• National Circumstances
• National GHG Inventory
• Domestic MRV System
• Mitigation Actions
• Financial, technical and
capacity needs
• Support received
Page 3
BUR Format: General Information
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
• A first draft format will be developed together with the experiences
from Chile and the Information Matters project in the preparation of
a BUR
• Use is not mandatory!
• The BUR Format will be adjustable to the national circumstances
and data availability in each country
• Consider the IPCC guidelines
• 1. Transparency
• 2. Completeness
• 3. Consistency
• 4. Comparability
• 5. Accuracy
Seite 4
BUR Format – Approach overview
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
M&E / MRV systems
Overarching issues• Coordination• Framework• Institutional mandate• Common processes and procedures• Data access and archiving
GHG MRV
• Activity data
• Emission
Factors
• Guidance
and
methodology
• QA/QC
Mitigation
Actions
Adaptation
Actions
• Baselines
• Indicators
• Outcomes
• Impacts
• MRV
Climate
finance
• Domestic
• International
• Received
• What was it
for? NAMA,
NAP
• National circumstances; institutional arrangements
• National GHG inventory
• Adaptation measures
• Mitigation actions
• Domestic MRV arrangements
• Other actions: tech transfer, public awareness, research
• Financial, technical and capacity needs
• Support received
black – commonblue – NC onlygreen – BUR only
Info
rmat
ion
Nat. Com
Biennial
Update
Report
(BUR)
Elements needed
for outputs
OutputsCapacity System
Information Matters project
Inst
itutio
nal
Tech
nica
l
Cap
abili
ty Input from
Information
Matters‘
countries and
global
partners
Guidelines for
Stock Taking
Tool
Seite 5
BUR Format – Structure
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
Executive Summary
1. National Circumstances
2. Institutional Arrangement related to MRV
3. The national GHG Inventory
4. Mitigation Policies and Actions
5. Financial, Technology, and Capacity Building Support
6. Additional Observations
Annex
Page 6 Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
Page 7
Closer look on the subchapter
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
Page 8
Wrap-Up:
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
• The BUR Template:
• Includes references to the UNFCCC guidelines
• Includes guidung questions for each section and subsection
• Use is mandatory!
• TCCCA principles
• Developed on the basis of UNFCCC BUR guidelines, project
experience and input by country as well as international experts
• Word document: can be adjusted to be nationally appropriate
• Translation into french and spanish
• Online available: http://mitigationpartnership.net/giz-2014-biennial-
update-report-template
Page 9
Thank you very much for your time and
attention!
15/10/2014 Peer-to-Peer Exchange on BURs, Octber 15th 2014
In all matters of the
project please
contact:
Kirsten Orschulok
kirsten.orschulok@giz.de
Page 10
About the project
15/10/2014
Supported by
• the German Ministry for the Environment, Nature Conservation,
Building and Nuclear Safety (BMUB)
Participating countries
• Dominican Republic, Chile, Ghana and the Philippines,
Technical expertise
• Provided by British consulting firm Ricardo-AEA
Project complementation
• with UNDP-LECB, West Africa GHG Project, UNEP in partner
countries; Also WRI, International Partnership on Mitigation
and MRV. Peer-to-Peer Exchange on BURs, Octber 15th 2014
Page 11
Global project goal
15/10/2014
• Identification of specific needs and priorities of the MRV
systems and GHG monitoring in the partner countries
• Strengthen in-country capacities for enhanced reporting
(BURs and NCs) of climate relevant information to
UNFCCC
• Provision of tailored-made capacity-building trainings and
workshops
• Support the process through peer-to-peer exchange and
generation of lessons learnt
Peer-to-Peer Exchange on BURs, Octber 15th 2014
Page 12
provision
Roles and responsibilities of project partners
Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
BMUB IKI
GIZ UBA
GIZ Dom Rep
GIZ Chile
GIZ Ghana
GIZ Phil
Ricardo-AEA
UNDP LECB
WRI UNDP NCSP
Philipp. CCC
Dom. Republic
CCC Ghana EPA
Chile MMA
MoU
of expertise
International Partnership on Mitigation and MRV
Page 13 Peer-to-Peer Exchange on BURs, Octber 15th 2014 15/10/2014
Kick off in-country missions
September to December 2013
Capacity building missions
January 2014 to June 2015
Peer-to-peer exchange workshop
(Bonn, Germany) - September 2015
Start: September 2013 End: September 2015
Recommended