8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
1/18
Content
Compilation Reference.......................................................... 1
General Introduction and Characteristics............................. 1
Construction Organization and Schedule........................... 4
Preparation...........................................................................4
Installation Process and Implementation Procedure.......... 6
Qualit control................................................................... 1!
Safe"Ci#ilized Construction.............................................. 16
Compilation Reference
0
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
2/18
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
3/18
Item Specification Unit QTY Wt.
n=d1 Hd1+; O)5)
E.3 and O,phase to$er PC 4
>.3 to$er $ith >.3 ushing7 PC *
ain Control o0$ith 2e7 PC 1
?erminal o0 $ith e7 PC 1
Control o0 of ?ap,change PC 1
PumpJith Oil flo$ing Rela 7 PC *
ain Conser#ator PC 1
Pressure Relief 3al#e and Ruer PC +
Gas Rela 'rip,proof cap PC 1
'ehumidifier
PC 1
Jinding ?emperature Controller
'ispla and atcher
PC 1
Signal ?hermometer Indicator and
'ispla
PC +
E.3 ushing PC *
O,Phase ushing K tie,in PC 1
&arthing ushing 5ccessories PC 1
Radiators Set 1?C7 are
correct and tightM $hether taps are cleaned.
f Jhether has sludging= $ater drop= metal chip= etc.
'uring chec2ing of acti#e part and accessories installation= minimize the time
acti#e part e0posed to air. ?ime shall e calculated from unscre$ing of co#er olt
or opening #al#e for e0hausting till tan2 #acuumized. 5ir relati#e humidit shall e
referred to control the e0pose time. anufacturer stipulates that $hen relati#e
humidit8!;= e0pose deniedM $hen at 6!;,8!;= e0pose time shall e less than
1+ hoursM $hen 6!;= e0pose time shall not e0ceed 16 hours.
!.+.8 Installation of ain 5ccessories
a. Installation of 5scending ?o$er
Chec2 C? efore installation. ount ascending to$er as per series numer on
products. a2e sure the C? nameplate face outside of oil tan2 and place air loc2 at
highest part of ascending to$er. Jhen tightening olts of flange= ma2e sure that
gas2et is placed in right position in ad#ance= and then scre$ olts graduall and
e#enl.
. Installation of E3 ushing
10
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
12/18
5ssign person speciall monitoring the stand of E3 ushing from horizontal status.
&rection is to e carried out rigger cooperating $ith electrical installer $ith hoo2
and manual hoist as detailed in Plate 1. Place olster e.g. ruer plate or timer
oard under ottom end of ushing. Protect ushing at $here ma contact chain or
rigging $ith ruer plate. Prior to mounting ushing to transformer= clean carefull
the central hole and ushing end that immersed in oil. o#e ushing slo$l to
ao#e of ascending to$er= regulate position of Phase 5 and C= and let fall ushing
slo$l into ascending to$er. 'o not hit ushing on ascending flange. Rigger and
crane operator shall cooperate closel. Open hand hole co#er on ascending to$er=
and $ire E3 lead to ushing panel.
Plate 1 ushing &rection
c. Installation of >3 ushing
17. Chec2 and confirm that no scratch on ushing surface= especiall no scratch=
crac2 and fla2e off on porcelain sealing surface of flange. Clean ushing surface.
+7 ?ie the s2irt of porcelain $ith nlon rope= lift slo$l to ao#e of installation hole
of transformer= and let fall it #erticall and slo$l into transformer. 'o not hit
porcelain on oil tan2 case.
*7 Scre$ olts on flange graduall and e#enl.
47 Jhen $iring ushing and lead= ma2e sure that no olt or other article drop into
oil tan2.
d. Installation of Cooler
11
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
13/18
17. Installation of Rac2= Cooler and )an
Chec2 and clean if thereDs an foreign matters inside of cooler. )lush it $ith
satisfactor transformer oil if necessar= and then carr out lea2 test again. air
pressure -.1+ pa for +-min= no lea2age shall e found.7 Chec2 and confirm that
motor and impeller of fan shall e securel installed= and smooth and no loc2 in
rotation. %o distortion of impeller and no contact $ith air duct.
5fter installation of rac2= lift and mo#e cooler slo$l to a#oid collision. )asten it on
rac2= appl flange olts $ithout tighten. Position cooler #erticall and ma2e it $ell,
distriuted. )asten cross piece= and then tighten flange olts.
+7. Pipe Connection= Pump and Oil flo$ Rela Installation
Clean oil pipe efore installationM pump shall e insulated efore installationM
e$are of the impeller direction $hen installing oil flo$ rela. Regulate impeller to
right position tightening nut.
e. Chec2 of On,load ?ap Changer
Chec2 contactor of on,load tap changer O>?C7 as re@uired in manufacturerDs
instruction and confirm the correctness of positionM chec2 operation mechanism
and confirm the correctness of position
f. Installation of Pressure Relief 3al#e
a2e sure flange connecting pressure relief #al#e on oil tan2 is le#el and no slag
on it. Place o,ring $ith adhesi#e to pre#ent it from displacing $hen tightening.
)asten olt at re@uired moment manufacturer. )ace oil outlet on of
pressure relief #al#e to a open space.
g. Installation of Capsule,tpe 3acuum Conser#ator
17. Inside of conser#ator shall e clean. %o scratches are found on capsule. ount
a #al#e and pressure gauge on flange of capsule to test air tightness. 5ppl a 82Pa
pressure on capsule and close #al#e. Pressure shall not reduce $ithin -.! hour.
+7. )i0 rac2 and mount conser#ator on it tightl.
*7. Connect to gas rela pipe and install gas rela after filling oil under #acuum.
47. )it e0haust pipe= oiling pipe= and oil discharging pipe. Install matching stop
#al#es at the ottom of these pipes. 'uring pipe fitting= ma2e sure that seal ring
has een place on the interface.
!7. ?ear off seal on co#er of reather efore installation. ?ighten olt after seal ring
12
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
14/18
placed. Oil shall e filled in cup till +,*cm ao#e aluminum chec2 tue to 2eep oil
tightness.
h. Installation of Gas Rela
17. Chec2 $hether outer appearance of rela if sound.
+7. Install rela et$een t$o connection pipes in accordance $ith direction mar2ed
on housing of rela= i.e. red arro$head direct to conser#ator.
*7. Install e0haust pipe of ascending to$ers= concentrate all gas ma e0ist in
ascending to$er in connection pipe of rela.
47. Pipe directl connected to rela shall ha#e a proper gradient $ithin -N !N.
!.+.< Oil )ill under 3acuum
5fter installation of transformer= chec2 and confirm that no tools and materials left
inside of transformer oil tan2. Close co#er of transformer= and fill oil under #acuum.
5fter installation of all accessories= open #al#e connecting gas chamer and oil
chamer at t$o sides of oil conser#ator. a2e sure e@ual pressure inside of
capsule to a#oid damage. 5fter confirmation of all parts connecting of od of
transformer can ear #acuum operation manufacturer $ho shall confirm it in
ad#ance. Parts unale to ear #acuum shall e isolated from #acuation7= open all
#al#es connecting transformer od and start #acuation including od. 'uring
#acuation of oil tan2= chec2 tightness at all times. Stop #acuum pump if necessar
for con#enience of listen to lea2ing sound.
13
Plate 2 illing Oil fom Bottom "al,e
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
15/18
a. Connect #acuometer to proper #al#e on oil tan2.
. Connect #acuum pump to #al#e on the top of tan2 or to conse#ator.
c. )illing Oil and 5dding under 3acuum
17
Generator ?ransformer
If acti#e part chec2 and remounting are unale to e finished in one da= satisfied
transformer oil shall e filled into transformer. Resume remounting after draining
oil. Jhen remounting complete= carr out #acuumizing and oil filling under #acuum.
Oil in on,load tap changer has een drained. Connected oil tan2 $ith on,load tap
changer chamer $ith H pipe to ma2e oth of them e #acuumized. Connect oil
pipe of on,load tap changer to ma2e it e filled $ith oil under #acuum together $ith
transformer.
Connect #acuumizing pipe= and turn on #acuum pump. 3acuumize till 1**Pa
1torr7= and 2eep it for < hours= during $hen= fill oil #isa ottom #al#e at oil tan2
Plate +7 $ith oil flo$ less than !t"h and stop filling till oil le#el is 1--mm from co#er
of oil tan2. ean$hile= fill satisfactor transformer oil to chamer of on,load tap
changerM 2eep it under #acuum for < hours. Release #acuum= and dismantle
#acuum pipe and e#acuation e@uipment.
Install supplementar oil pipe at filling #al#e of conser#ator. add oil #isa top of oil
tan2 to pre#ent air from entering #acuumized oil tan2 of transformer.7
5dd oil to proper le#el according amient temperature $hen oil is filled.
+7
Hnit 5u0iliar ?ransformer
3acuumize transformer till +1.*2Pa 16-rorr7 as re@uired manufacturer. Eold the
status for -.!,1 hour. )ill oil #isa ottom #al#e at rate not igger than !t"h= and stop
filling and release #acuum till oil le#el reaching at $here 1--mm from top of oil
tan2. Open all #al#es connecting od to accessories= and add oil till proper le#el
as per temperature at that time.
!.+.11 Eot Oiling Plate *7
14
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
16/18
5fter filling oil under #acuum to transformer od= hot oiling shall e carried out in
follo$ing procedures as re@uired manufacturer(
17 ?ransformer connects to oil filter #isa upper and lo$er filter #al#e to form a
closed circulation. Oil direction is from filter to top of transformer= and from ottom
of transformer ac2 to filter.
+7 Eeat the oil to e transferred from filter to transformer to !-,6-.
*7 eep oil circulating till total oil @uantit through transformer e0ceeding + times of
oil tan2 capacit= $hile time of circulation shall not less than 4< hours as re@uired.
47 5fter the $hole oil filling process= sample transformer oil for test again.
!.+.18 O#erall ?ightness Chec2 and Placement
)ill dr air or nitrogen #isa reather at oil conser#ator to chec2 the o#erall
tightness. 5ppl -.-*Pa pressure to oil co#er for +4 hours and no lea2age shall
e found. 5fter filling oil and efore appl #oltage= place G? for 4< hours and E3
unit au0iliar transformer for +4 hours= during $hen release all gas #isa air #ent.
!.+.1+ Grounding
17
Jire grounding olt 1+ of on,load tap changer cainet and tap to transformer
housing or oil tan2.
+7
15
Plate 3 ot Oiling
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
17/18
Jire ascending to$er #isa grounding olt to transformer housing or oil tan2.
*7
Connect E3 neutral point ushing #isa steel cored aluminum strand >G,*--"+!
and grounding post insulator FS+,1+6" to grounding grid.
Ground plate shall e $elded to ottom of oil tan2 of transformer. 5fter cleaning
interface= scre$ do$n nut to ma2e the copper,cored cale contact closel to
grounding plate.
Qualit! Control
6.1 5cti#e part chec2 shall meet re@uirements in !.+.6M
6.+ ushing is installed in right position. %o scratch= crac2 and spall on seal interfaceof porcelain ushing flangeM
6.* Insulation oil test shall e in compliance $ith I&C6--6M
6.4 O#erall installation chec2 of transformer shall e in accordance $ith re@uirements
of manufacturer.
Safe"Ci#ilized Construction
8.1 ?o e in strict stipulations as sho$n in &lectric Po$er Construction Safet CodesM
8.+ ?o e in strict oedience to construction safet protection specifications herein
in#ol#edM
8.* 5fter unpac2ing of the e@uipment= $ithout an hesitation= remo#e and dispose all
the deris out ofconstruction area in order to 2eep the galler to e in smooth
access and no an inLuries the nails
8.4 Jhile performing $elding acti#ities= anti,shoc2= e0plosion,proof and metal splashes
etc shall e carried,out=as for the shell of the electric $elding machine= it shall e
$ell grounded.
8.! On the site= all the tools and de#ices shall e 2ept in satisfactor storage and
custodian= the temporar po$er suppl shall e in good conditions $hile
o#erlapping= as $ell= rain$ater,proof= lea2age,resistance methods and actions
shall e implemented. %o an aritrar dismantle those installed and assemled
16
8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903
18/18
scaffoldings and amoo,centered structures= prior to completion of each
construction se@uence or regular shift termination= ta2e care to chec2 those
electric,dri#en tools and grounding cale rolls to e shut,do$n or not.
8.6 In those energized areas= all the acti#ities and operations shall e presented $ith
applicale oImplementation PermitsT= if necessar to utilize flame= flame,
centered o Implementation PermitsT shalle issued.
8.8 'uring installation= oil filter and oil tan2 shall e grounded securel.