FRPD CLAMSHELL DREDGING CRANE AND...

Preview:

Citation preview

N

FILL SITE

TURNING BASIN

NAVIGATION CHANNEL

CONTAINMENT BERM

COLUMBIA CSD (AT ANCHOR)

DIFFUSER PIPE

COLUMBIA CSD (DREDGING)

COLUMBIA CSD FLOATING PIPELINE (AT ANCHOR)

COLUMBIA CSD FLOATING PIPELINE (DREDGING)

FRPD 309 THSD (DREDGING)

FRPD 309 THSD (DISCHARGING)

PIPELINE REMOVAL

PHASE 3

PHASE 1

PHASE 4

BERM CONSTRUCTION

FILL SITE

EXISTING BERM

EXISTING PIPELINE

PHASE 2

FRPD CLAMSHELL DREDGINGCRANE AND SCOW

ROCK SCOW (AT ANCHOR)

B

A

ROCK SCOW (AT ANCHOR)

S:\Dredging\Survey\00 Dredge Progress\2015-2016\07 Major Projects\01 PCT\01 PCT Methodology Plan\2015 PCT Methodology-Columbia_Non-Working.dwg, Methodology Plan Columbia Working, 29/06/2015 11:30:44 AM

Recommended