6 6 L o n g W h a r f - B o s t o n , M A 0 2 1 1 0 ( T ) 6 1 7 . 7 2 3 . 1 7 0 0 - ( F ) 6 1 7 . 7 4 2 . 0 9 4 7
w w w . a e c o m . c o m
Page 1 of 1 Terminal IE Renovation and Enhancements
Friday, December 11th, 2015 To: Unitron Power Systems Massport AECOM From: AECOM
Subject: L1346-C2 Terminal E Renovation and Enhancement PBB's, RFP # 5276
Question: Per Section 16800, 400 HZ Ground Power Unit Specification, Part 2, line2.19, will other manufacturers be approved to bid on the 180-kVAfrequency converters?
Answer: Alternates will be considered for all Ground Support Products,including 400hz, PCA, and Potable Water Cabinets. Contractorsshall follow the specification criteria for the basis of designguidelines for tendering purposes and during the submittal process all al-ternates with accompanied experience references, financial history, after-market support references, technical documentation, electrical and me-chanical code compliances along with theirmanufacturing processes will be evaluated accordingly.
6 6 L o n g W h a r f - B o s t o n , M A 0 2 1 1 0 ( T ) 6 1 7 . 7 2 3 . 1 7 0 0 - ( F ) 6 1 7 . 7 4 2 . 0 9 4 7
w w w . a e c o m . c o m
Page 1 of 2 Terminal IE Renovation and Enhancements
Friday, December 11th, 2015 To: JBT Corporation Massport AECOM From: AECOM Subject: Additional requests related to MASSPORT RQ# 5276 L1346-C2
Terminal E Renovation and Enhancements
1. In the Customer specification 13041, item 2.3 A., page 4, states the existing serialnumber for both the “Storage Facility – E8A and E8B” bridge as 38777. Should theE8A bridge serial number be identified as “38776” (an A3 64/131) and the E8Bbridge serial number be identified as “38777” (an A3 68/141)? Please clarify.
Per Massport’s existing equipment inventory table, Gate E8A is S/N 38776 Jet-way A3-64/131 and Gate E8B is S/N 38777 Jetway A3-68/141.
2. In the Customer specification 13041, item 2.13 A., page 16, states A ramp servicedoor, landing, and service stair shall be provided at the aircraft end of the bridge orwalkway for apron access by authorized personnel. These shall be positioned perthe engineers designated location. (Pre-Bid discussion meeting). The Customerdrawings, identified as PL.801 PL.802, depict the PBB1 (inboard) position with theservice stair/landing coming from the fixed walkway/corridor section at the terminalend and the PBB2 (outboard) position does not show a service stair on the bridge atall. Do you want us to quote to have a right-side service door and landing along witha maintenance access ladder, but no stair, on the “new” PBB2 (outboard) bridgepositons? Do you want us to quote to place a service door, landing, and stairassembly in the “new” walkway/corridors? Please clarify.
Per Drawings PL.801 and PL.802, no service door, landing, or maintenance ac-cess ladder for upper-deck PBB2. A service door, landing, and baggage con-veyance shall be mounted to the new fixed walkway of INS-level PBB1.
3. In reviewing the Customer drawing, identified as PL.801, the PBB # 2 position bridgewill only be used to service the A380-U1 (upper-deck) door position. Pleaseconfirm that this is correct and that the PBB # 2 bridge will not be used to serviceany other aircraft.
We are only depicting PBB2 docked to the A380 because the slope is not withinADA slope compliance for unassisted access for all other widebody aircraft.Massport or the tenant may want to use assisted access for the greater than al-lowable slope conditions; therefore, the bidder shouldassume the PBB will be used for other widebody aircraft. We as thedesigner cannot release a PBB design document or recommend a scenario thatdoes not comply with the standard, and relies on an operationalrestriction.
6 6 L o n g W h a r f - B o s t o n , M A 0 2 1 1 0 ( T ) 6 1 7 . 7 2 3 . 1 7 0 0 - ( F ) 6 1 7 . 7 4 2 . 0 9 4 7
w w w . a e c o m . c o m
Page 2 of 2 Terminal IE Renovation and Enhancements
EXTENSION OF QUOTES DUE DATE:
4. In reviewing the Customer drawing, identified as PL.801, the “AIRSIDEEQUIPMENT SCHEDULE” has a column identified as “REQUIRED PBBOPERATIONAL RANGE”. Please confirm how this range is defined; is it measuredfrom rotunda-pivot to cab-pivot or is it measured from rotunda-pivot to end of the cabbumper? Based upon the size of the existing bridges for the PBB # 1 bridge, itwould appear that the range is measured from the rotunda-pivot to the cab-pivot. Please note the following:
Measured from rotunda-pivit to cab-pivit.
a. The Gate E10 and E12 PBB # 2 bridge are listed with a “REQUIRED PBBOPERATIONAL RANGE” of 58’-131’. This would require a travel range of 73feet, JBT-Jetway does not have a 3-tunnel bridge that can satisfy this rangeof travel and meet both the retract and extend dimension regardless of how itis measured.
Bidder shall recommend alternate/comparable 3-tunnel PBB model for ap-proval, which accommodates the design aircraft fleet mix.
b. The Gate E11 PBB # 2 bridge is listed with a “REQUIRED PBBOPERATIONAL RANGE” of 45’-92’. This would require a travel range of 47feet, JBT-Jetway does not have a 3-tunnel bridge that can satisfy this rangeof travel and meet both the retract and extend dimension regardless of how itis measured.
Bidder shall recommend alternate/comparable 3-tunnel PBB model for ap-proval, which accommodates the design aircraft fleet mix.
5. Please consider providing AutoCAD drawing file of the project gates, etc. andallowing the bridge manufacturers to define and quote the bridge models that wouldwork with your aircraft layout as represented on the Customer drawing PL.801. CAD
file attached.
Currently, the answers to questions and requests are due to come out by Addendum on14 Dec 2015. We’ll need to send our quote out very shortly after (16 Dec) in order tohave it arrive on time. In light of the important technical and commercial questions thatwe’re hoping to have answered in that Addendum, we respectfully request an extensionto the bids-due-date to perhaps 23 Dec 2015 so that we may have enough time toprocess that new information.
Massport has decided to extend the due-date to December 23, 2015, see Adden-dum 1.
JBT Questions Massachusetts Port Authority
RFP #5276
Drawing PL.802 1. Can the gate sign be mounted to our standard right side mounting location on
the cab in lieu of where shown on the drawing? Response: Quote as specified. Design intent is to ensure gate sign doesn’t conflict with ancillary gate equipment or adjacent PBB operations.
2. The drawing shows the PCA as mounted on the rotunda. With the required
120ton unit size and weight, we suggest either mounting the PCA units on a stand for the existing units and under the PBB C‐tunnel on the new units. Please accept.
Response: Quote as specified. 3. The drawing depicts one (1) TAD Tube and a single outlet PCA unit. A 120Ton
unit will require 2 outlets which would require 2ea TAD Tubes and 2ea hose management systems per PBB. Please clarify the mounting configuration for dual outlet PCA, TAD tubes, and hose management systems.
Response: PCA unit shall be manufactured with “one” outlet. One TAD Tube shall be provided. Two Hose Management Systems shall be provided for each 120 ton unit.
4. Please clarify if both a bag slide and bag conveyance system are required on the service stair of the refurbished PBB’s.
Response: One bag “slide” and one “wheel chair lift” shall be provided. Division IIB 1. Reference Sub Clause 1.2: This states the project consists of the design and
documentation to build a temporary jet bridge at Terminal E Gate 7B. This gate currently consists of the PBB that is to be refurbished and relocated to new gate E10. Please explain “build a temporary jet bridge at Terminal E Gate 7B”.
Response: Answered in Addendum 1. 2. Reference Sub Clause 68.2 Field Office: This section describes the requirement
to furnish a field office with a desk, chairs, meeting table, file cabinet, locker, fax machine, computer, printer, shelving, telephone, etc. Please remove this section as this won’t be required for a project of this size and duration.
Response: This requirement applies to the Construction Manager only. Section 13041 Aircraft Passenger Loading Bridges 1. Reference Sub Clause 2.1.G Wind Load: The wind loads are listed at 25 psf. The
ASCE manual lists higher load requirements for the Boston area. Please clarify. Response: Industry standard PBB loading requirements per NFPA 415 are sufficient.
2. Reference Sub Clause 2.1.K Lighting: This section describes the fixed walkway to include fluorescent light fixtures containing 2 lamps spaced 8ft on center. Our standard interior lighting design consists of 2’ X 4’ light fixtures containing 3 lamps spaced on 12ft centers running parallel to the bridge center line. Please accept our standard lighting design.
Response: Accepted. 3. Reference Sub Clause 2.4.H Walkway loads: Please provide walkway floor
loads as per Internal Building Massport codes. Response: Industry standard PBB loading requirements per NFPA 415 are sufficient.
4. Reference Sub Clause 2.8.C.4.b Tire Size: This section calls for 16” diameter
tires. Our standard is 40” Please accept our standard tire configuration. Response: Contractor shall provide suitable size industry standard “solid tires” to accept all operational parameters of PBB and design aircraft fleet mix operations.
5. Reference Sub Clause 2.9.F Swing door width 44”: Our standard swing door
clear width is 43” Please accept. Response: Accepted.
6. Reference Sub Clause 2.13.B.1 Service door width 2’ 8”: Our standard 3 tunnel
service door width is 2’ 6”. Please accept. Response: Accepted.
7. Reference Sub Clause 2.14.A: The specification states to supply 12ea smart
sensors to gather and collect data stream on a “real time” basis of input and trending information. Please provide the supplier of these sensors systems and clarify who is responsible for the installation of the sensors.
Response: See attached Smart Sensor datasheet. 8. Reference Sub Clause 2.14.I.7 Gate Sign: The provided drawing shows an LED
light in the gate sign and the specification shows a fluorescent light. Please clarify.
Response: Provide LED lighting for gate signs. 9. Reference Sub Clause 2.15.A.5 Ribbed Rubber: This section calls for ¼” ribbed
rubber to be installed in the bubble/cab area and on the transition ramps. Our standard ribbed rubber is 3/16” thick. Please accept our standard ribbed rubber.
Response: Accepted. 10. Reference Sub Clause 2.16.3: This section calls for Bridge Cool ducted from the
PCA unit. We propose to provide a 5ton Roof Top A/C Unit in lieu of the specified pre‐cool. We believe this would result in some cost savings to the Owner as well as simplify the dual hose management system/duct splitter issues mentioned above.
Response: Quote as specified.
11. Reference Sub Clause 2.18.C Gate Signage: Please clarify if the 9ea existing gate signs are to be replaced, or are just the lenses to be replaced?
Response: All gate signs shall be replaced with new complete gate sign assembly, and all gate signs shall be consistent in materials and finishes on all gates.
Section 13983 Preconditioned Air 1. Reference Sub Clause 1.1.B Mounting: See comments from Drawing PL.802. 2. Reference Sub Clause 2.1.B.1 Acceptable Manufacturers: Please accept JBT as
an approved PCA Manufacturer. Response: All alternates and substitutions will be considered for all Ground Support Equipment, including Pre‐Conditioned Air Units and 400hz units. Contractors shall follow the specification criteria for the basis of design guidelines for tendering purposes. During the submittal process all alternates and substitutions will be evaluated with the following documentation. Company profile, history and references, technical documentation, electrical and mechanical compliance codes, manufacturing process, quality control manual, after market support guidelines, warranty manual and spare parts list.
3. Reference Sub Clause 2.2.A.4: The specification states to supply 12ea smart
sensors to gather and collect data stream on a “real time” basis of input and trending information. Please provide the supplier of these sensors systems and clarify who is responsible for the installation of the sensors.
Response: See attached Smart Sensor datasheet. Brown Industries will ensure an operational installation along with commissioning of stand‐alone system.
4. Reference Sub Clause 2.2.B.4: This section refers to Table 1. Please provide.
Response:
12. Reference Sub Clause 3.4.B.D Spare Parts: This section says to provide a separate line item price for the above spare parts however there is no spot on the Bid Forms to include this. Please indicate where we are to include this separate line item pricing.
Response: Please provide in‐house cost estimate form for individual line items.
TABLE 1
MODEL
ELT-500
Tons Nominal (Actual Compressor Tonnage) at 60 HZ Ratings
130
Refrigerant R-410A
Power (Voltage/Hertz/Phase) 480-60-3
Rated Amps 400 Compressors, Scroll @ 60HZ Rating (2) 25 Tons
(4) 20 Tons Blower H.P. 60 Design Airflow lb/min 500 Static at Aircraft inches w.c. 40 Cooling Discharge Temperature at the unit.
12°F– 20°F
Heating Discharge Temperature at the unit. 100°F –160°F
PHYSICAL DESCRIPTION
Length inch (cm) 195
Width inch (cm) 87
Height inch (cm) 69
Weight pound (kg) 9950
Materials of construction Steel/Aluminum
UL APPROVED ELECTRICAL XLT500 RLA 305 MOP 388 Circuit Breaker Inside Unit 400 Recommended Power Cable 350 MCM Recommended Circuit Breaker at Disconnect
400 AMPS
* NOTE: These are general performance characteristics. Ambient conditions and alternative unit configurations will alter these general performance characteristics.
5. Reference Sub Clause 2.4.I: We provide a ¼” SAE valve in lieu of the 3/8” flare shut off valve specified. This will prevent accidental refrigerant discharge. Please accept.
Response: Quote as specified. 6. Reference Sub Clause 2.4.L: This section requires 4‐pole totally enclosed fan
cooled (TEFC) motors. Our standard 120 ton unit uses 6‐pole totally enclosed air over (TEAO) motors. 6‐pole motors are used to reduce noise and TEAO motors are used because of size limitations. TEFC motors will not fit inside our unit. Please accept our standard design.
Response: Quote as specified. 7. 2.1.I. requires the PCA unit to be provided with required hardware, software,
databases and any required site licenses to provide remote monitoring and control features as specified herein. 2.2.A.4. requires the PCA control system to consist of twelve (12) smart sensors that will be able to gather and collect data stream on a real time basis of inputs and trending information. Our PCA unit is capable of providing multiple points for monitoring using the PLC in the PCA unit with no additional smart sensors required. Is the remote monitoring supposed to be provided in addition to the 12 smart sensor monitoring?
Response: Quote as specified. The smart sensors are stand‐alone in addition to the PCA monitoring provisions.
Section 13990 Relocation and Refurbishment of Passenger Boarding Bridges 1. We would like to inspect the existing bridges and site. Please provide a contact
person who could help arrange a site visit for the inspection. Response: For site information, please contact: Peter Brooks: 617‐366‐9469, or Jim Theodos: 857‐321‐0776. For additional information on the existing PBB’s, please refer to attachments “E8A Removal Report” and “E8B Removal Report”.
2. Reference Sub Clause 3.3.B.2&3 PCA & 400Hz Mounting: This section states that the PBB’s are to be equipped with mounting provisions for PCA and 400hz as well as the provision of BOOM AIR hose management and cable hoists for 180kVA units. Please clarify who is responsible to provide and install the PCA and 400Hz units on the relocated/refurbished PBB’s.
Response: Installation of all PCA and 400hz equipment and accessories shall be installed by each OEM (original equipment manufacturer) using factory certified technicians.
Section 16800 400Hz Ground Power Unit 1. Reference Sub Clause 2.2.D.11: The specification calls for efficiency of 93%.
Our unit is typically between 91 and 92%. Please accept. Response: Quote as specified.
2. Reference Sub Clause 2.5.A.3: The specification calls for an Amber light to
indicate the output contactor is on. On the JBT unit, the Amber light indicates input voltage is applied. We use a green light to indicate the output contactor is on. Please accept.
Response: Quote as specified. 3. Reference Sub Clause 2.8.B: The specification calls for dimensions to be 60 x 53
x 23.2 inches. Our standard 180kVA height dimension is 30 inches. Please accept.
Response: Quote as specified. 4. Reference Sub Clause 2.8.C: The specification calls for the enclosure to use
aluminum panels over a steel frame. Our frame and enclosure are both aluminum. Please accept our standard enclosure.
Response: Quote as specified.
Scheduled Completed Comments
‐ Conduct survey 08/11/15 08/11/15 Ameribridge Survey Attached
‐ Test/Run PC Air Unit 08/11/15 08/11/15
‐ Run Bridge 08/11/15 08/11/15
‐ Disconnect Power 08/11/15 08/11/15 Work performed by EG Sawyer
‐ Drop Electrical Lines 08/11/15 08/11/15 Work performed by EG Sawyer
‐ Lower Bridge 08/11/15 08/11/15
‐ Remove PC Air Unit 08/11/15 08/11/15
‐ Remove Rotunda 08/13/15 08/13/15
‐ Crane arrival & check‐out 08/12/15 08/12/15
‐ Hook Bridge 08/12/15 08/12/15
‐ Remove Wheel Boogie 08/12/15 08/12/15
‐ Back trailer under bridge 08/12/15 08/12/15
‐ Set bridge on trailer 08/12/15 08/12/15
‐ Haul bridge to North Campsite 08/12/15 08/12/15
‐ Off‐load bridge 08/12/15 08/12/15 Side Stairs stored on Bridge Roof
‐ Secure/Wrap/Protect PBB's 08/12/15 08/12/15 Secured plywood at platform end.
‐ Conduct survey 08/12/15 08/11/15 Ameribridge Survey Attached
‐ Test/Run PC Air Unit 08/12/15 08/11/15
‐ Run Bridge 08/12/15 08/11/15
‐ Disconnect Power 08/12/15 08/11/15 Utilized EG Sawyer for day
‐ Drop Electrical Lines 08/12/15 08/11/15 Utilized EG Sawyer for day
‐ Lower Bridge 08/12/15 08/11/15
‐ Remove PC Air Unit 08/12/15 08/12/15
‐ Remove Rotunda 08/13/15 08/13/15
‐ Hook Bridge 08/13/15 08/13/15
‐ Remove Wheel Boogie 08/12/15 08/12/15
‐ Back trailer under bridge 08/13/15 08/13/15
‐ Set bridge on trailer 08/13/15 08/13/15
‐ Haul bridge to North Campsite 08/13/15 08/13/15
‐ Off‐load bridge 08/13/15 08/13/15 Side Stairs stored on Bridge Roof
‐ Secure/Wrap/Protect PBB's 08/13/15 08/13/15
‐ Crane Demobilize / Vacate Site 08/13/15 08/13/15
‐ Clean‐up Site 08/14/15 08/14/15 Swept and Rolled area with Magnet
‐ Demobilize / Vacate Site 08/14/15 08/14/15
TERMINAL E JET BRIDGE E8A & E8B REMOVAL SCHEDULE
E8A & E8B
E8B
E8A
E8B
E8A
Task / Activity
E8A Jet Bridge as installed
E8A Jet Bridge lowered for disassembly
‐ Prepped for PC Air Unit removal
E8A Jet Bridge lowered for disassembly
‐ PC Air Unit removed
TERMINAL E PBB E8A REMOVAL and STORAGE
E8A jet bridge Removed
E8A Jet Bridge Entrance Protection
E8A Jet Way A Tunnel
‐ See Ameribridge Condition Checklist
E8A Jet Way B Tunnel
‐ See Ameribridge Condition Checklist
‐ Missing Handrail ‐ Left Side
E8A Jet Way B Tunnel
‐ Carpet Stain
E8A Jet Way Cab
‐ See Ameribridge Condition Checklist
‐ Wall Panels ‐ Left side
E8A Jet Way Cab
‐ See Ameribridge Condition Checklist
‐ Wall Panels ‐ Right side
E8A Jet Way Control Panel
‐ See Ameribridge Condition Checklist
E8A Jet Way Platform
‐ See Ameribridge Condition Checklist
‐ Canopy Top Bumper torn/ripped
E8A Jet Way Platform
‐ See Ameribridge Condition Checklist
‐ Bottom Right Bumper missing
Jet Way E8A
‐ Main supply Disconnect
Jet Way E8A
‐ Ground Power Disconnect
E8B Jet Way
‐ Stored at North Campsite
‐ Exposed Wire Ends Wrapped & Taped
E8B Jet Way
‐ Stored at North Campsite
‐ Exposed Wire Ends Wrapped & Taped
E8B Jet Way
‐ Stored at North Campsite
‐ Exposed Wire Ends Wrapped & Taped
Jet Way E8A
‐ Storage at North Campsite
Jet Way E8A
‐ Storage at North Campsite
Jet Way E8A
‐ Storage at North Campsite
Scheduled Completed Comments
‐ Conduct survey 08/11/15 08/11/15 Ameribridge Survey Attached
‐ Test/Run PC Air Unit 08/11/15 08/11/15
‐ Run Bridge 08/11/15 08/11/15
‐ Disconnect Power 08/11/15 08/11/15 Work performed by EG Sawyer
‐ Drop Electrical Lines 08/11/15 08/11/15 Work performed by EG Sawyer
‐ Lower Bridge 08/11/15 08/11/15
‐ Remove PC Air Unit 08/11/15 08/11/15
‐ Remove Rotunda 08/13/15 08/13/15
‐ Crane arrival & check‐out 08/12/15 08/12/15
‐ Hook Bridge 08/12/15 08/12/15
‐ Remove Wheel Boogie 08/12/15 08/12/15
‐ Back trailer under bridge 08/12/15 08/12/15
‐ Set bridge on trailer 08/12/15 08/12/15
‐ Haul bridge to North Campsite 08/12/15 08/12/15
‐ Off‐load bridge 08/12/15 08/12/15 Side Stairs stored on Bridge Roof
‐ Secure/Wrap/Protect PBB's 08/12/15 08/12/15 Secured plywood at platform end.
‐ Conduct survey 08/12/15 08/11/15 Ameribridge Survey Attached
‐ Test/Run PC Air Unit 08/12/15 08/11/15
‐ Run Bridge 08/12/15 08/11/15
‐ Disconnect Power 08/12/15 08/11/15 Utilized EG Sawyer for day
‐ Drop Electrical Lines 08/12/15 08/11/15 Utilized EG Sawyer for day
‐ Lower Bridge 08/12/15 08/11/15
‐ Remove PC Air Unit 08/12/15 08/12/15
‐ Remove Rotunda 08/13/15 08/13/15
‐ Hook Bridge 08/13/15 08/13/15
‐ Remove Wheel Boogie 08/12/15 08/12/15
‐ Back trailer under bridge 08/13/15 08/13/15
‐ Set bridge on trailer 08/13/15 08/13/15
‐ Haul bridge to North Campsite 08/13/15 08/13/15
‐ Off‐load bridge 08/13/15 08/13/15 Side Stairs stored on Bridge Roof
‐ Secure/Wrap/Protect PBB's 08/13/15 08/13/15
‐ Crane Demobilize / Vacate Site 08/13/15 08/13/15
‐ Clean‐up Site 08/14/15 08/14/15 Swept and Rolled area with Magnet
‐ Demobilize / Vacate Site 08/14/15 08/14/15
TERMINAL E JET BRIDGE E8A & E8B REMOVAL SCHEDULE
E8A & E8B
E8B
E8A
E8B
E8A
Task / Activity
E8B Jet Bridge as installed
E8B Jet Bridge lowered for disassembly
‐ Prep for PC Air Removal
PC Air Unit disconnected and removed
TERMINAL E PBB E8B REMOVAL and STORAGE
E8B Jet Way Removed
E8B Jet Way Rotunda prepped for removal
E8B Rotunda separated from terminal
E8B Jet Way Entrance Protection
E8B Rotunda Carpet Damaged
‐ See Ameribridge Check List Report
E8B A Tunnel Carpet Damage
‐ See Ameribridge Check List Report
E8B Cab Flooring Damage
‐ See Ameribridge Check List Report
E8B Jet Way A Tunnel
‐ Lighting
‐ Ceiling Panels
‐ Wall Panels
‐ Flooring
‐ See Ameribridge Check List Report
E8B Jet Way B Tunnel
‐ Flooring ‐ Water Stained & Damaged
‐ See Ameribridge Check List Report
E8B Jet Way B & C Tunnel
‐ Lighting ‐ Not Working
‐ Ceiling Panels ‐ Not Visible
‐ Wall Panels ‐ Not Visible
‐ Flooring‐ Not Visible
‐ See Ameribridge Check List Report
E8B Jet Way PC Air Unit
‐ Air Discharge Outlets
‐ Electric Panel & Disconnect
E8B Jet Way PC Air Unit
‐ Electric Panel & Disconnect
‐ Disconnect Shaft Missing
E8B Jet Way Main Power Panel
‐ Power Disconnect
E8B Jet Way Main Power Panel
‐ Power Disconnect
‐ Missing Disconnect Shafts
‐ Missing Disconnect Interconnectors
E8B Jet Way Main Power Panel
‐ Power Disconnect
‐ Disconnect Shafts interconnection Parts
E8B Jet Way Main Power Panel
‐ Power Disconnect
‐ Disconnect Shafts Shown for Refernce
E8B Jet Way Canopy
‐ Extended Canpoy ‐ Torn & Worn
‐ See Ameribridge Check List Report
E8B Jet Way Canopy
‐ Canpoy ‐ Torn & Worn
‐ See Ameribridge Check List Report
E8B Jet Way Canopy
‐ Top Bumber Pad Missing
‐ See Ameribridge Check List Report
E8B Jet Way Canopy
‐ Bottom Bumper Corner Missing
‐ Corner Bumper Pad Missing
‐ See Ameribridge Check List Report
E8B Jet Way
‐ Stored at North Campsite
‐ Exposed Wire Ends Wrapped & Taped
E8B Jet Way
‐ Stored at North Campsite
‐ Exposed Wire Ends Wrapped & Taped
E8B Jet Way
‐ Stored at North Campsite
‐ Exposed Wire Ends Wrapped & Taped
E8B Jet Way
‐ Stored at North Campsite
E8B Jet Way
‐ Stairs & Shoot Stored on Roof
E8B Jet Way
‐ Opening Protection
Jet Way E8B
‐ Storage at North Campsite
Jet Way E8B
‐ Storage at North Campsite
Jet Way E8B
‐ Storage at North Campsite
Address: ThyssenKrupp Airport Systems, Inc. 3201 N. Sylvania Ave., Suite 117 Fort Worth, Texas 76111
Phone: (817) 210‐5000 Fax: (817) 210‐5043 Mail: info.usa.tkaps@thyssenkrupp.com
Internet: www.thyssenkrupp‐airports.com
ThyssenKrupp Airport Systems
December 07, 2015
Massachusetts Port Authority
Logan Office Center
One Harborside Drive
Suite 200S
East Boston, MA 02128
Email: CPBidQuestions@massport.com
Reference: Bid #5726 ‐ Terminal E Enhancements
We have completed the review of the Bid Package and would like to submit the following questions:
1. Section 13041‐17, 2.14 Electrical System and Components; Section 13983‐3, 2.2 System
Performance Requirements; Section 13990‐6, 2.4 Spreadsheet Guideline Scope of Work: ‐‐‐‐
Q: These sections mention a requirement for “smart sensors”, but no specifications are
identified. Can more information please be provided for these sensors?
Response – The sensor manufacturer will ensure the commissioning and installation of all
sensors. Please see Addendum 1 and attached Smart Sensor product datasheet.
2. On Drawing PL.802 there is a requirement for a baggage conveyor mounted to the service
stairs, but in Section 13041‐16, 2.13 Service Door, Landing and Stair it mentions a
requirement for a wheel chair lift and late bag slide to be mounted to the service stair
landing.
Q: There seems to be a conflict with the requirements. Please advise as to what is to be
required and where.
Response – Contractor shall provide a wheel chair lift and bag slide at the landing, which is
attached to the fixed walkway tunnel.
3. On Drawing PL.802, the service stairs and landing are depicted to be mounted at the
walkway and not on the PBB.
Q: Is the requirement of relocating the service stairs/landing to be typical of ALL PBB’s at each
gate, including the Refurbished/Relocated PBB’s?
Response – Please reference General Note 3. The service stair, landing, and baggage
conveyance are only mounted to the INS level PBBs (refurbished/relocated PBBs). The club
level PBBs do not have service stair, landing, or baggage conveyance.
Page: 2
Date: December 10, 2015
Address: ThyssenKrupp Airport Systems, Inc. 3201 N. Sylvania Ave., Suite 117 Fort Worth, Texas 76111
Phone: (817) 210‐5000 Fax: (817) 834‐6985 Mail: info.usa.tkaps@thyssenkrupp.com
Internet: www.thyssenkrupp‐airports.com
ThyssenKrupp Airport Systems
4. Please confirm that a point‐of‐use pre‐conditioned air unit is to be mounted at the rotunda
with a telescoping air duct and flexible air ducting connecting to the hose management
system and not a point‐of‐use PCA unit mounted at the outermost tunnel section with
flexible ducting connecting to the hose management system?
a. Please confirm that this is to be typical of ALL PBB’s at each gate, including the
Refurbished/Relocated PBB’s.
Response – All PCA units are to be mounted on rotunda column per specifications.
See item 5 below.
5. Please confirm that ALL PBB’s at each gate are to have 120 Ton PCA units with two hose
management system units each, including the Refurbished/Relocated PBB’s.
a. Also, would this require two telescoping ducts per PBB since the PCA units are dual
output?
Response – Correct. Two 120 ELT PCA units, two hose management systems. One
telescoping air duct with a two connector splitter.
6. Please confirm who is responsible for the supply and installation of the bollards depicted in
Drawing PL.802. If we, as the bidder, are required to supply and install the bollards, can the
structural drawings please be provided as stated? Please confirm if the bollards are just to be
provided for the three (3) potable water cabinets or other.
Response – Civil Contractor is responsible for the supply and installation of bollards. The
bollards shall protect the potable water cabinets and the operational range/swing of the PCA
unit mounted to the rotunda column.
7. Section 13041‐22, 2.18 Gate Signage: The Bidder is to replace the PBB signage at adjacent
existing gates.
Q: Please confirm if we are just to replace the panels or the complete gate sign.
Response – Contractor shall provide new complete gate sign assemblies for all PBBs. All gate
signs should match with consistent materials and finishes.
8. Please confirm that there is not a goal for M/WBE at this time for this project.
Response – There are no M/WBE goals for this scope of the project. See Addendum 1.
9. Paragraph 2.1.B of specification section 13983 for Preconditioned Air Units only lists
TwistAero as an approved vendor. Can ITW GSE Hobart also be added as an approved
vendor?
Response – All alternates and substitutions will be considered for all Ground Support
Equipment, including Pre‐Condition Air Units and 400hz units , . Contractors shall follow the
specification criteria for the basis of design guidelines for tendering purposes. During the
submittal process all alternates and substitutions will be evaluated with the following
documentation. Company profile , history and references, technical documentation,
electrical and mechanical compliance codes, manufacturing process, quality control manual,
after market support guidelines, warranty manual and spare parts list.
Page: 3
Date: December 10, 2015
Address: ThyssenKrupp Airport Systems, Inc. 3201 N. Sylvania Ave., Suite 117 Fort Worth, Texas 76111
Phone: (817) 210‐5000 Fax: (817) 834‐6985 Mail: info.usa.tkaps@thyssenkrupp.com
Internet: www.thyssenkrupp‐airports.com
ThyssenKrupp Airport Systems
10. The specifications and drawings call for the PCA unit to be mounted to the rotunda. The
physical size of a 120 ton DX PCA unit makes this very difficult or not possible. Would you
consider under‐bridge mounting on the c‐tunnel or ground mounted as an alternative?
Response – Quote to specifications.
11. Please confirm who is to be considered the Construction Manager.
Response – Suffolk Construction.
12. Please provide more information regarding the smart sensors and their interface.
Response – See item #1.
13. Q: The specified paint system is based on using hot rolled steel. Thyssen uses cold formed
galvanized / galvannealed steel panels that requires a special paint system. Thyssen’s paint
system meets and exceeds what is specified. As provided for previous equipment to Boston,
would you please accept our paint system designed for galvannealed steel and suited for the
Boston climate?
Response – Accepted, provide documentation.
14. Section 13041‐20, B. Exterior: Q: ThyssenKrupp has supplied many bridges throughout the world without issue of the
finishes. If we demonstrate that our finish process and material is equal to or better than is
what is specified, would our standard exterior and interior finishing process be accepted?
Response – Accepted.
15. Chapter VII – Legal Relations and Responsibility to Public; Article 37.1‐Insurance Requirements
This section indicates, “Limits shall be provided on a per project basis.”
We respectfully request ‘per project aggregate’ requirement be deleted from this section. If
required, we can, however, add the ‘per project’ endorsement for an additional cost. In lieu
of a ‘per project aggregate’ we can provide up to a $10,000,000 general aggregate limit
(primary) and an additional $20,000,000 excess limit at no additional cost.
Response – Providing up to $10M general aggregate insurance and additional $20M excess
limit is acceptable to Massport.
15. Chapter VII – Legal Relations and Responsibility to Public; Article 37.5‐Pollution Legal
Liability
This section indicates, “Construction Manager shall provide Pollution Legal Liability coverage
with a minimum limit of $5,000,000.”
Please confirm Pollution Legal Liability is required for this scope of work.
Response – Pollution Liability Insurance is not required for this scope of the project.
Page: 4
Date: December 10, 2015
Address: ThyssenKrupp Airport Systems, Inc. 3201 N. Sylvania Ave., Suite 117 Fort Worth, Texas 76111
Phone: (817) 210‐5000 Fax: (817) 834‐6985 Mail: info.usa.tkaps@thyssenkrupp.com
Internet: www.thyssenkrupp‐airports.com
ThyssenKrupp Airport Systems
16. Chapter IX – Measurement and Payment; Article 76‐Partial Payment
This section indicates, “Within fifteen (15) days after receipt from the Construction Manager
of a periodic estimate requesting payment of the amount due for the preceding month, the
Authority will make a periodic payment to the Construction Manager for the Work performed
during the preceding month and for the materials not incorporated in the Work but delivered
and suitably stored at the site (or at some location agreed upon in writing) to which the
Construction Manager has title or to which a Subcontractor has title and has authorized…”
Please confirm it will be acceptable to include progress billings for engineering, material, and
labor costs incurred during the manufacturing process and prior to delivery.
Response – Massport will entertain progress billings so long appropriate documentation of
material ownership and insurance is provided with the requisitions.
17. Division IIB – Special Provision; Section 5‐Liquidated Damages
This section indicates, “Milestone 1: $2,500 per calendar day”.
We respectfully request liquidated damages be capped at 10% of the contract value.
Response – Capping LD’s to 10% of the contract value is acceptable to Massport.
18. Please confirm that our standard galvannealed floor construction will be acceptable for
the tunnel sections.
Response – Accepted.
19. Section 2.4 Fixed Walkway, H: Fixed Walkway loads for roof and flooring must exceed
the local Internal Building Codes adopted by Massport.
Please confirm that the PBB industry standard loads of 40 pounds per square for floor
structure, roof loads of 25 pounds per square foot over the total roof area, and a wind load of
25 pounds per square foot. If not, please define the acceptable loads.
Response – We accept industry standard loads.
Best Regards,
Tony Thompson
Sales/Estimation
ThyssenKrupp Airport Systems, Inc.
Fort Worth, Texas 76111
Tel.: +1 (817) 210‐5009
Fax: +1 (817) 210‐5043
E‐mail: tony.thompson@thyssenkrupp.com
Brown Technologies, Inc www.bti-corp.com
5141 California Ave Irvine, CA 92697
(866) 526-7067
A I R P O R T P R E D I C T I V E A S S E T M A N A G E M E N T
With shrinking budgets and growing costs, airports of all
sizes, now more than ever, need to leverage their existing
resources to improve operational performance and
travelers’ experiences.
Assets are not the same. Even if they start out the same,
they are used differently. The different usage greatly
affects their life expectancy. If the usage profile is not
taken into account, assets can fail unexpectedly hurting
operational performance and travelers’ experiences.
Brown Technologies, with its AB500 series Smart Sensors
and Analytics Platform, installs sensors that monitors
motors, rollers and other industrial equipment.
The AB500 Series Smart Sensors monitors temperature,
vibration, volts and amps as well as other operational
parameters.
The Analytics Platform analyzes in real time the sensors
and understands the usage profile for each equipment
and the impact that profile has on asset life. The Analytics
Platform leverages Machine Learning to understand the
different usage profiles of each equipment and how they
contribute to the overall life and efficiency of each asset.
The system scales from one asset to hundreds of
thousands of assets.
Predictive Asset Management Platform
ment Platform
• OPC
• ModBus
• MQTT
• TCP/UDP
Ingestion
• Derive Physical Calculations
• Metrics
• Thresholds
Engineering Model • Machine Learning
• Logistic Regression
• Thresholding
• Event Recognition
Analyze / Predict
• Maintenance
• Escalate
• Change Operation
Act• Vendor
Performance
• Bad/MistrainedActors
• Warranty
Report
Analysis Performed:
Thresholding
Vibration Analysis
Power Analysis
Machine Learning
Predictive asset management extends the efficiency of aviation
assets while reducing unplanned down time and helping minimize
major repairs.
Benefits:
Longer Asset Life
Visibility of Asset Usage Profiles
Prediction of future performance (Peak/Load)
Intelligent control of assets
Brown Technologies, Inc www.bti-corp.com
5141 California Ave Irvine, CA 92697
(866) 526-7067
A I R P O R T P R E D I C T I V E A S S E T M A N A G E M E N T
Sensors
Sensors
Gateway
PASSENGER LOADING BRIDGE USE CASE
Analytics Platform pulls the data in real-
time from the AB500 Smart Sensors
over wired or wireless communications
and the analyzes the assets for their
current and historical usage profile.
MANY OTHER APPLICATIONS:
Baggage Distribution Systems
Boilers
Central Utility Plant
Chillers
Cooling Towers
Pumps
Sensors
Recommended