FORM 1 & 1 A
For
PROPOSEDRESIDENTIALCUMCOMMERCIALPROJECT
“CHARMSSIGNATURE”
At
AtS.No.394,396,412,413,414,416,418,419,420,421ofShelavlivillage,Tal:Shahapur,Dist.Thane
Proposed By
M/s.CHARMSINC
ApplicationformforEnvironmentalClearance ProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20061
APPENDIX‐I (Seeparagraph–6)
FORM1
Basic Information Sr.No. Item Details
1 Nameoftheproject/s Proposed Residential CumCommercial Project“CharmsSignature”
2 S.No.intheSchedule 8(a)
3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.
Proposed Unit
PlotArea 1,09,710 m2
FSIAreaproposed 1,16,422.38 m2
NonFSIarea 27,690.00 m2
ConstructionBuiltUpArea 1,44,112.45 m2
4 New/Expansion/Modernization NewProject
5 ExistingCapacity/Areaetc. VacantPlot
6 Categoryofprojecti.e.AorB BCategory
7 Doesitattractthegeneralcondition?ifyes,pleasespecify
No
8 Doesitattractthespecificcondition?Ifyes,pleasespecify
No
9 Location Village:‐Shelavli,Tal:Shahapur,Dist.Thane
Plot/Survey/KhasraNo. AtS.No.394,396,412,413,414,416,418,419,420,421ofShelavlivillage,Shahapur,Dist.Thane
Village Shelavli
Tehsil Shahapur
District Thane
State Maharashtra
10 Nearestrailwaystation/portalongwithdistanceinkms.
AsangaonRailwayStation
Distance:~8.5km
AtgaonRailwaystation
Distance~8.2Km
11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.
CityShahapur,
District:Thane
12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)
Town Planning authority of ThaneCollectorate.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20062
13 Nameoftheapplicant M/sCharmsINC
Mr.JohnMatthewandMr.DhirajPatel 14 Registeredaddress 1102,DevCorpora,Opp,Cadbury'S,
EasternExpressHighway,Khopat, Thane(west)400601
15 Addressforcorrespondence: 1102,DevCorpora,Opp,Cadbury'S, EasternExpressHighway,Khopat, Thane(west)400601
Name Mr.JohnMatthewandMr.DhirajPatel
Designation(Owner/Partner/CEO) Partner
Address 1102,DevCorpora,Opp,Cadbury'S, EasternExpressHighway,Khopat, Thane(west)400601
Pincode 400601
E‐mail developers@charmsgroup.in
TelephoneNo. 022‐25381934
FaxNo.
16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.
No.We are developing this Project inOurOwnPlot
17 Interlinedprojects NotApplicable
18 Whetherseparateapplicationofinterlinkedprojecthasbeensubmitted?
No
19 Ifyes,dateofsubmission ‐
20 IfNo,Reason Stand‐aloneproject
21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) TheForest(Conservation)Act,1980?
b) Thewildlife(protection)Act,1972?
c) TheCRZNotification,1991?
NA
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
No
23 Forestlandinvolved(hectares) NO
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20063
24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?
a) Nameofthecourt b) CaseNo. c) Orders/Directionsofthe
courtifanyanditsrelevancewiththeproposedproject.
Nosuchlitigationpendingagainsttheproject
Capacity corresponding to sectoral activity (such as production capacity for manufacturing,miningleaseareaandproductioncapacityformineralproduction,areaformineralexploration,lengthforlineartransportinfrastructure,generationcapacityforpowergenerationetc.,)
(II)Activity 1. Construction, operation or decommissioning of the Project involving actions,
whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates, wherever possible) with source ofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
Yes
Presently land is vacant. Land is in Free Zone.Theresidential cumcommercialprojectwillbedeveloped.
1.2 Clearance of existingland, vegetation andbuildings?
Yes There are 7 nos of existing trees on site. Thetreeswhicharecomingunderbuildinglinewillbecut.
1.3 Creation of new landuses?
Yes Presently land is vacant. Land is in Free Zone.Theresidential cumcommercialprojectwillbedeveloped.
1.4 Pre‐constructioninvestigations e.g. borehouses,soiltesting?
Yes Soil samples will be taken within the plotpremisesforgeotechnicalinvestigation.
1.5 Constructionworks?
Yes 32 Residential Buildings, 1 CommercialBuilding, 1 School building and clubhousewillbeconstructed.
1.6 Demolitionworks?
No Plotisvacant
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
No Temporaryshedswillbeprovidedforworkers
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20064
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
No. Excavationwillbecarriedoutforfoundationofbuildings
1.9 Underground worksincluding mining ortunneling?
No It’saResidential/Constructionproject
1.10 Reclamationworks? No
1.11 Dredging?
No
1.12 Offshorestructures? No
1.13 Productionandmanufacturingprocesses?
No Thisisaconstructionproject
1.14 Facilities for storage ofgoodsormaterials?
Yes Only construction material will be stored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Solid waste will be treated by mechanicalcompostingmethod(Ecobio‐compack). Sewage generated from the complex will betreatedinSewagetreatmentPlant. Thetreatedwaterwillbeusedfor flushingandGardening. The dried sludge and compost will be used asmanureforlandscaping.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
No
1.17 Newroad,railorseatrafficduringconstructionoroperation?
No Existing road network will be used duringconstructionandoperationphaseofproject.
1.18 New road, rail, airwaterborne or othertransport infrastructureincludingneworalteredroutes and stations,ports,airportsetc?
No Existing road will be used for the transportpurpose.
1.19 Closure or diversion ofexistingtransportroutesorinfrastructureleadingto changes in trafficmovements?
No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20065
1.20 New or divertedtransmission lines orpipelines?
No
1.21 Impoundment,damming, culverting,realignment or otherchanges to thehydrology ofwatercourses oraquifers?
No ANallah is crossing through theplot premises.Nallah will be proposed 4m wide andchannelized.
1.22 Streamcrossings? Yes ANallahiscrossingthroughtheplotpremises.
1.23 Abstraction or transfersofwaterformgroundorsurfacewaters?
No
1.24 Changesinwaterbodiesor the land surfaceaffecting drainage orrun‐off?
No ANallah is crossing through theplot premises.Nallah will be proposed 4m wide andChannelized. There will not be any changes inotherwaterbodiesorthelandsurface.
1.25 Transport of personnelor materials forconstruction, operationordecommissioning?
Yes ConstructionPhase: Construction materials will be transported tothe site. Transport of workers employed forconstruction. OperationPhase: The residence in residential building duringoperation phase will use public or privatetransportationfacilities
1.26 Long‐term dismantlingor decommissioning orrestorationworks?
No
1.27 Ongoing activity duringdecommissioning whichcouldhaveanimpactontheenvironment?
Yes Dust generation and increase in Noise levelsduring Construction phase only. There will beminimalimpactontheEnvironment
1.28 Influx of people to anarea in eithertemporarily orpermanently?
Yes Construction workers during constructionphaseandadditionalresidentsduringoperationphase
1.29 Introduction of alienspecies?
No No introduction of alien species will occur asthis is purely residential cum commercialproject.
1.30 Lossofnativespeciesorgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions?
No No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20066
2 Use ofNatural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are non‐renewableorinshortsupply):
Sr.No. Information/checklistconfirmation
Yes/No
Details thereof (withapproximatequantities/rates, wherever possible) with source ofinformationdata
2.1
Landespeciallyundevelopedoragriculturalland(ha)
No Plotisvacantandnoagriculturalland
2.2 Water(expectedsource&competingusers)unit:KLD
Yes
Source:BhatsaDam
Proposed Unit
TotalWaterRequirement
1402 KLD
(Water requirement is calculated considering the86lpcdasperwaterconservationmeasuressuggestedinManual on norms and standards for environmentclearanceof large constructionprojectsPublishedbyMinistry of Environment and Forests, Government ofIndia.PageNo.63,Table2.4)ThedetailedwaterbalanceforoperationphaseofprojectisattachedasAnnexureIV
2.3 Minerals(MT) NA
2.4 constructionmaterial–stone,aggregates,sand/soil(expectedsource–MT)
Yes
Stone,aggregates,sanddemandwillbemetfromlocalopenmarket
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)
2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes Source:MSEDCL
Proposed Unit
Connectedload 12.6 MW
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
3. Use, storage, transport,handlingorproductionof substancesormaterials,whichcouldbeharmfultohumanhealthortheenvironmentorraiseconcernsaboutactualorperceivedriskstohumanhealth.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20067
Sr.No. Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes UsedoilfromDGsetwillbestoredseparatelyandwillbegiventoauthorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)
No
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No
3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,
No
Proposed Project will not affect hospitalpatients,childrenetc.
3.5 Anyothercauses No
4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)
Sr.No. Information/Checklist
confirmation
Yes/No
Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
4.1 Spoil,overburdenorminewastes
No
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes MunicipalSolidWaste
Proposed Unit
TotalSolidWaste 7809 kg/day
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
Yes UsedoilfromDGsetwillbegiventoauthorisedrecyclers
4.4 Otherindustrialprocesswastes
No No,Thisisaresidentialproject.
4.5 Surplusproduct No NotApplicable
4.6 Sewagesludgeorothersludgefromeffluenttreatment
Yes 12m3/dofsludgewillbeusedasmanure
4.7 Constructionordemolitionwastes
Yes Construction debris during construction phasewillbeutilizedinplotonlyforlandlevelling. The waste will be disposed at designateddisposalsiteasapprovedbythecollector
4.8 Redundantmachineryorequipment
No NotApplicable
4.9 Contaminatedsoilsorothermaterials
No NotApplicable
4.10 Agriculturalwastes No NotApplicable
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20068
4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)
Sr.No. Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
5.1 Emissionsfromcombustionoffossilfuelsfromstationaryormobilesources
Yes EmissionfromDGsetsduringpowerfailureandmovement of vehicle during operation phase oftheproject
5.2 Emissionsfromproductionprocesses
No NotApplicable
5.3 Emissionsfrommaterialshandlingincludingstorageortransport
Yes Fugitiveemissionfromhandlingsuchassandandotherconstructionmaterial
5.4 Emissionsfromconstructionactivitiesincludingplantandequipment
Yes Transportationofconstructionmaterial&handlingofsand,aggregates,cement,DGsetsetc. Theemissionsfromconstructionmachinerywouldcontainparticulates,SOx,NOxandCO
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedust OdourfromSolidwastemanagementandsullagetreatmentplantareaifnothandleditproperly
5.6 Emissionsfromincinerationofwaste
No NotApplicable
5.7 Emissionsfromburningofwasteinopenair(e.g.slashmaterials,constructiondebris)
No NotApplicable
5.8 Emissionsfromanyothersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No. Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata
6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers
Yes Increase in noise levels due to operations ofconstructionequipment’s&vehicularmovement
6.2 From industrial orsimilarprocesses
No NotApplicable
6.3 Fromconstructionordemolition
Yes Increaseinnoiselevelsduringconstruction.
6.4 Fromblastingorpiling Yes Duringpiling
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.20069
6.5 Fromconstructionoroperationaltraffic
Yes During construction andoperationphase of theproject. In theoperationphase therewillbe increase inthevehicularmovementbecauseoftheresidentsandvisitors
6.6 Fromlightingorcoolingsystems
No NotApplicable
6.7 Fromanyothersources No NotApplicable
7. Risks of contamination of land or water from releases of pollutants into thegroundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:
Sr.No. Information/Checklist
confirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
No The used oil from DG sets will be given toauthorisedrecyclers
7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)
No Sewage generated from the complex will betreatedinSTP.Theexcesstreatedwater‐willbegiven to nearby agricultural use/ constructionworks. ThetreatedsewagewillbeusedforflushingandGardening.
7.3 By deposition ofpollutantsemittedtoairinto the land or intowater
Yes ConstructionPhase
Vehicular movement would lead to slight increaseindustparticles.Dustgenerated duringconstruction will be settled continuously bysprayingwater. OperationalPhase:‐NotApplicable.
7.4 Fromanyothersources No NotApplicable
7.5 Is there a risk of longterm build‐up ofpollutants in theenvironmentfromthesesources?
No NotApplicable
8. RiskofaccidentsduringconstructionoroperationoftheProject,which
couldaffecthumanhealthortheenvironment Sr.No. Information/Checklist
confirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
Yes SpillageofusedoilfromDGsetsandexplosioninDiesel storage area. Adequate fire protectionmeasureswillbetakenupasperthefireNOC
8.2 Fromanyothercauses
Yes Accidentsduringconstructionphase(Slips,fallfrom height, falling of objects/ material on
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200610
workers,fire,cutandburns,electricshockandcollapseofshuttering
Fireduetoshortcircuiting
Terrorism
8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
No The proposed structure is designed as perSeismicZoneIIIstandards.
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)which
couldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
9.1
Leadtodevelopmentofsupporting.
facilities,ancillarydevelopmentordevelopment stimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.: •Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.) •housingdevelopment •extractiveindustries •supplyindustries •other
No
The proposed project is a residential cumcommercial construction project. The proposedsite is located nearly in undeveloped area andhence the infrastructural facilities are not exitssurrounding the project site. The project site isaccessible by Service road & 30 m wideShahapurRoad.
9.2 Leadtoafter‐useofthesite, which could havean impact on theenvironment
No NotApplicable
9.3 Set a precedent forlaterdevelopments
No NotApplicable
9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects
No At present there is no major ongoingconstructionprojectofsimilarintensity.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200611
(III)EnvironmentalSensitivity
Sr.No. Areas
Name/
Identity
Aerialdistance(within15km.) Proposed project locationboundary
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
No
2 Areaswhichareimportantorsensitiveforecologicalreasons‐Wetlands,watercoursesorotherwaterbodies,coastalzone,biospheres,mountains,forests
Yes Bhatsa River : approximately 2.0km
BhatsaDam:7.5km
TansaDam:14km
Harshigi‐GotaLake:8.0km 3 Areasusedbyprotected,important
orsensitivespeciesoffloraorfaunaforbreeding,nesting,foraging,resting,overwintering,migration
No
4 Inland,coastal,marineorundergroundwaters
Yes Bhatsa River : approximately 2.0km
BhatsaDam:7.5km
TansaDam:14km
Harshigi‐GotaLake:8.0km
5 State,Nationalboundaries No
6 Routesorfacilitiesusedbythepublicforaccesstorecreationorothertourist,pilgrimareas
No
7 Defenceinstallations No
8 Denselypopulatedorbuilt‐uparea Yes Shahpurvillage:7km
Asangaonvillage:10.5km
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
Yes Hospitals, schools, Engg. Colleges,community facilities, & places ofworshiparepresentwithin15km.
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
No
11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
No
12 Areassusceptibletonaturalhazardwhichcouldcausetheprojecttopresentenvironmentalproblems (earthquakes,subsidence,landslides,erosion,floodingorextremeor
No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200613
(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)
1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)
1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Presentlylandisvacantandlandisinfreezone.Therewillbechangeislanduse.
ProposeddevelopmentisinlinewithD.Pofarea.Followingdocumentsareattachedassupportingdocuments.
1. ConceptualPlanandDetailedTenementstatementareattachedasANNEXUREII
2. LocationPlanisattachedasANNEXUREIII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
Proposed Unit
PlotArea 1,09,710 m2
FSIAreaproposed 1,16,422.38 m2
NonFSIarea 27,690.00 m2
ConstructionBuiltUpArea 1,44,112.45
m2
Waterconsumption
Proposed Unit
TotalWaterConsumption
1402 m3/day
EnergyConsumption
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200614
Proposed Unit
TotalConnectedload 12.6 MW
ParkingProvided
TotalParkingProvided
Fourwheeler 112Nos.
Twowheeler 3771Nos
CycleParking 3771Nos.
Connectivity Proposedsiteisaccessibleby‐ 12mServiceroadand30mshahapurroad. LocationPlanisattachedasANNEXUREIII
1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
Theprojectbeingawell‐plannedactivitywill resultinorganizedopenspacesandgreenareas.Therewillbe minor negative impact on flora present in andaround the project site during construction phasemainlyduetodust.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themainreasonsforerosionareoverexploitationofgroundwater, instable slopes, landslides etc. Theproposedconstructionwillinvolvecuttingandfillingoperations. The project will involve construction ofroadsanddevelopmentofgreenareas,whichwouldreducethechancesoferosionandsubsidence. Subsidenceisnotanticipatedasgroundwaterwouldnotbeusedasasourceofwatersupply. Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
No.Therewillnotbeanyalterationofnaturaldrainagesystem.Thelandisflat.ThenaturalslopeoftheareaistowardsSouth‐Eastside.
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
Cutting and filling for construction activity arebalanced, so no transportation of earth will berequired
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200615
1.7 Givedetailsregardingwatersupply,wastehandlingetc.duringtheconstructionperiod.
Supply Source: Water for Domestic consumptionwill be available from Bhatsa Dam whereas forConstructionpurposeTankerwaterwillbeused. Storage:Water for constructionwill be stored in atank constructed temporarily at site whereasDomesticwaterfromBhatsaRiverwillbestoredinHDPEtanks.
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
No wet lands and low‐lying areas on the site.Received
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazardisanticipated.
2. WATER ENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreak‐upofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
TotalWaterrequirement:1402KLD DetailedwaterbalanceisenclosedasANNEXUREIV
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
TheproposedwaterdemandwillbemetfromBhatsaDam.
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
WatersupplyisfromBhatsaDam.
2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)
TreatedwaterfromSewagetreatmentPlantwillbeusedforflushingandgardening
Totalsewagegenerated 1238KLD
Treatedwaterrecycledforflushing
344KLD
TreatedwaterforGardening 64KLD
Sludgeforcomposting 12KLD
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200616
TreatedSewagetonearbyagriculturaluse/nearbyconstructionarea
818KLD
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total sewage of about 1238 KLD will begenerated from the project. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment
Parameters Values Units
pH 7‐8 mg/l
BOD 250‐300 mg/l
COD 450‐600 mg/l
O&G 10‐20 mg/l
TSS 100‐200 mg/l
Mitigationmeasures:TheSewagewillbe treatedin the STP of capacity 1300m3/day. The treatedwaterwillbereusedforflushingandgardening.
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
Rainwaterharvestingtankswillbeprovided
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
There will not be changes In land use as plot isreserved for residentialpurpose.The stormwaterdrainswillbedevelopedwithintheprojectsite.
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasBhatsaDam/River. Thegroundwatertableisat6to8m.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200617
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
Followingmeasureswillbetakenuptopreventthe
runofffrompollutinglandandgroundwater
Noexcavationduringmonsoonseason.
Catchdrainageallalongtheperipheryofplotto
preventsurfacerunoff.
Useofsiltfenceandtrapstoreducetherunoff
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.
Thestormwaterdrainswillbeprovidedatgroundlevels. So there will not be problem of waterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No, the deployment of construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises. The unsanitary condition will beremoved by means of providing readymadeModulartoilets Solidwastewillbedisposedoffinmunicipalwastedisposalsystem.
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
ConstructionPhase: Sewagewillbetreatedinseptictank.Theoverflowofseptictankisdischargedinsoakpits. OperationPhase: The sewage Treatment Plant is designed to treatthe raw sewage generated from the proposedproject.Theproposedcapacityofsewagetreatmentplantwouldbe1300m3/day.
2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.
Yes,Theproposeddevelopmentwillhavethedualplumbingsystemasthetreatedsewagewillbeusedforrecycling.
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)
Thereisnosensitiveecosystempresentatsitethatwillbedisturbedbytheproject.
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
No.There isveryscantyvegetationofgrassesandshrubs along with very common fauna prevalentelsewhereinthearea.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200618
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
The green belt will be developed for control ofpollutionandaestheticviewofthecomplex. RGareaProvided:12,810m2 RGarearequired:‐10,229.40m2
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetc.tomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
5. AIR ENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
The Projectwill result inmarginal increase in theatmospheric concentrations of gases due to D.G.operations (back‐up power only). The proposedactivitywillnotresult intheformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM, NOX and COemissions are expected due to fuel combustion ingeneratorsets.
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
Theprojectwillhaveproperentryandexitforthevehicles.TheprojectsiteisaccessedbyserviceroadandShahapurroad.Therewillnotanytrafficcongestionduetoprojectsite.Inproposedprojectprovisionof112(fourwheeler),3771(twowheeler)&3771Nos.ofcycleparkingspaceshasbeenmade.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200619
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinannegativeimpact.
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure. The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures. Increase in noise levels are expected fromvariousconstructionequipmentandmachinery.
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganised open areas and landscaped areas are atthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Therewillnotbeanyadverseimpact
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites orartefactsarefoundnearthesitearea.
7. SOCIO-ECONOMIC ASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majority of the labourwill be recruited locallyand only minimal skilled workers would be fromoutside, which is anticipated to be very small andwillnotaltertheexistingdemographicprofileofthe
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200620
area.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
The Project comes in free zone area and has allbasic infrastructural facilities as schools, medicalestablishments, shops, etc. within 10km radius ofprojectsite.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Project will have positive impact on localcommunities.
8. BUILDING MATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)
Yesthebuildingmaterialswithhighembodiedenergywillbeused
8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequatemitigativemeasureswillbeadopted.Constructionequipmentwithidlingcontroltechnologieswillbeused.Regularmaintenanceoftheequipment’swillbecarriedout.Theconstructionactivitieswillbecarriedoutduringthedaytimeonly.Theconstructionsmaterials/excavatedsoil/constructiondebriswillbecarriedthoroughcoveredtrucks.Theworkersexposedtohighnoisegeneratingwouldbeprovidedwithearplugs.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Flyashincementconcrete.Typically20‐25%offlyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration. Proposed Unit
Solidwastegenerated
7809 kg/day
Thebiodegradablewaste4685.4kg/day
willbetreatedbymechanicalcompostingmethod
Thenon‐biodegradablewaste3123.6kg/daywillbedisposedofthroughrecyclers.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200621
9. ENERGY CONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCL
DGSetwillbeprovidedasemergencybackup.
Proposed Unit
Connectedload 12.6 MW
9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?
DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.ThetotalD.G.setcapacitywillbe6X500kVA
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
DoubleglazedglassforResidentialbuildings
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such awaythatsolarlightcanbeutilisedmaximumfordaytime.
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas such asopenspaces,pathways,RGetc.
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Theproposedresidentialbuildingwillhaveshadingarrangement.
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes.Theroomswillbesodimensionedthateffectiveairconditioningcanbecarriedout.Publicareaswillbe cooled by natural ventilation. The design of thebuildingwill be such thatmaximumuse of naturalventilation can be achieved. The walls, roofs andopenings will be so designed that influx of heat isminimum.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200622
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heat emission from the proposed construction canbefromthefollowingsources: Heat absorbed from the concrete structures, heatgeneratedfromequipment’s/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheat generatedwill not be significantandwill bedissipated in the lush greens andopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/C
Roof 0.409 Watts/hr/m2/C
Wall 0.352 Watts/hr/m2/C
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall compromise ofhydrant system and portable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteel firehosecabinet(weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.External firehydrantsshallbe locatedsuchthatnoportion of any building ismore than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat
thewindowsaresealed,willbeprovided. Summer cross section ventilation will be
maximum.
9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigation
EnclosedasAnnexureV
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200623
measuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200624
ANNEXUREI
AREASTATEMENT
A AREASTATEMENT SQ.MT.1 AREAOFPLOT(ASPER7/12Extract) 109710.002 DEDUCTIUONSFOR a. AreaunderRoad 2032.083 BalancePlotarea 107677.924 DEDUCTIONSFOR
a. 5%AmenityArea(5%of3) 5383.905 Balanceplotarea(3‐4a) 102294.026 10%openspace(10%of5) 10229.407 NetPlotarea(5‐6) 92064.628 FSIPermissible 1.29 AdditionalFSIonpaymentofpremium 0.410 TotalPermissiblefloorarea(8+9) 1.2411 TotalPermissiblefloorarea(7X10) 1,14,160.1312 TotalPermissiblefloorarea(11+amenity) 1,16,852.0813 ProposedBuilt‐uparea 1,16,422.3814 FSIconsumed 0.99
Proposed Unit
FSIAreaproposed 1,16,422.38 m2
NonFSIarea 27,690.00 m2
ConstructionBuiltUpArea 1,44,112.45 m2
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200625
TENEMENTSTATEMENT
BuildingDetails Height(m) BuildingConfiguration
ResidentialBuilding(32Nos.)
24.0 GR+7Floor
CommercialBuilding 11.4 GR+2Floor AmenitySchool 10.8 GR+2Floor
SECTOR BLDG. No. NO OF FLATS
SECTOR 1
1 BLDG D 95 2 BLDG D 95 3 BLDG E 95 4 BLDG F 63
SECTOR 2
5 BLDG D 95 6 BLDG A 79 7 BLDG B 127 8 BLDG E 95 9 BLDG E 95
SECTOR 3
10 BLDG U 78 11 BLDG M 110 12 BLDG P 95 13 BLDG U2 73
SECTOR 4
14 BLDG T2 59 15 BLDG S 89 16 BLDG Q 142 17 BLDG T 63
SECTOR 5
18 BLDG P 95 19 BLDG L 158 20 BLDG P 95 21 BLDG B 127 22 BLDG F 63 23 BLDG S 89 24 BLDG S 89
SECTOR 6
25 BLDG K 89 26 BLDG K 89 27 BLDG K 89 28 BLDG H 95 29 BLDG H 95 30 BLDG A 79 31 BLDG H 95 32 BLDG J 127
TOTAL FLATS 3022
SECTOR 7 33 COMM (G+2)
SCHOOL BLDG. (G+2)
ApplicationformforEnvironmentalClearance ProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200626
ANNEXUREII
CONCEPTUALPLAN
CYCL
E PA
RKIN
G
CYCLE PARKING
CYCLEPARKING
CYCLE PARKING
UG TANK
SEPTIC TANK
SEPTIC TANK
UG TANK
12 MT WIDE SERVICE ROAD
BLDG CONTROL
30 MT WIDE SHAHPUR ROAD
18 MT WIDE ROAD
9 MT WIDE ROAD 9 MT WIDE ROAD
15 M
T W
IDE
ROAD
12 MT WIDE ROAD
18 M
T W
IDE
ROAD
9 MT WIDE ROAD
AMENITY PLOT5834 SQ.MT.
COMMERCIALHALL
SUB-STATION
4M W
IDE
NALL
AH
PLOT NOT INSCHEME
PLOT NOT INSCHEME
RG 1 AREA3300 SQ.MT.
RG 2 AREA1850 SQ.MT.
RG 2 AREA2400 SQ.MT.
RG 2 AREA2830 SQ.MT.
RG AREA
RG AREA
RG AREA
4M WIDE NALLAH4M WIDE NALLAH
STP
S YS T
EM
S TP
SYST
EM
S TP
S YS T
EM
STP SYSTEMSTP SYSTEMSTP SYSTEM
STP SYSTEM
STP SYSTEM STP SYSTEM
STP
SYST
EM
STP
SYST
EMST
P SY
STEM
STP
SYST
EMSTP SYSTEM STP SYSTEM
7.45
7.45 7.20
6.93 7.87 9.
69
10.4
3
10.6
7
4.45
11.95
11.09
7.09
23.20
22.625.57
6.75
6.75
17.34
5.00
17.32
6.00
6.00
6.43
5.00
5.00
10.0
014.7
6
9.20 11
.89
6.23 7.73
6.98
8.29
18.80
5.37
4.25
3.15
3.30
4.89
6.00
6.00
5.25
5.00
7.29
6.03
7.32
11.15
10.6
2
7.20 6.27
13.656.00 23.32
7.20
8.02
7.12
13.65
17.64
13.36
8.00
16.92
16.19
9.00
10.2
8
10.2
7
6.00
7.206.00
8.0012.02
15.10
18.44
7.20
14.05
7.65
6.75
16.5
2
7.65
9.666.08
10.6
5
10.6
5
8.00
9.82
9.17
8.82
6.02
6.02
15.5
5
8.60
14.97
25.57
12.1
3
19.4
7
10.6
9
11.3
1
7.347.
90
7.657.65
14.57
6.97
7.65
7.65
7.65
7.65
7.65
12.65
6.00
6.11
7.82
5 .47
5 .20
5 .20
9.56
7.33
7.49
7.50
7.46
7.44
12.71
7.46
14.81
7.68
15.92
14.51
12.90
7.51
7.60
17.9
2
7 .4 3
7 .50
7 .50
7 .7 5
7 .75
7 .755 .
99
13.3
4
7.406.82
9.36
6.80
14.14
7.30
12.65
5.75
CLUB HOUSE
CLUB HOUSE
CLUB HOUSE
BLDG 1
BLDG 2
BLDG 6BLDG 7
BLDG 9 BLDG 8
BLDG 11
BLDG 18
BLDG 24
BLDG 21
BLDG 19
BLDG 26
BLDG 4
BLDG 31
BLDG 14
BLDG 30
BLDG 29BLDG 28
BLDG 22
BLDG 27
BLDG 12
BLDG 10
BLDG 13
BLDG 17
BLDG 3
BLDG 32
BLDG 20
AMENITYAREA -2
( SCHOOL)GR + 2 FLRS
BLDG 23
BLDG 15
BLDG 16
BLDG 5
BLDG 25
SECTOR I SECTOR II
SECTOR III
SECTOR IV
SECTOR V
SECTOR VI
SECTOR VII
ApplicationformforEnvironmentalClearance ProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200627
ANNEXUREIII LocationPlan
ApplicationformforEnvironmentalClearanceProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200628
STUDYAREAWITHIN15km
ApplicationformforEnvironmentalClearance ProjectName:ResidentialCumCommercialprojectatShelavli
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200629
ANNEXUREIV
WATERBALANCESTATEMENT
ParticularsNoofFlats/rooms/Cars
OccupancyTotal
Population
TotalWaterRequirement/
person
WaterDemandKLD
Domestic Flushing
Residential 3022 5 15,110 65 21 86 1,300
ConvienientShops 130 3 390 9 21 30 12
CommercialBldg(m2) 2065.31personsper10
m2 207 9 21 30 6
School(m2) 2691.95 4personsperm2 673 9 21 30 20
Total(A) 15,500 1,338WaterrequiedforGardening(B)
64
Total(A+B) ` 1,402
SewageGeneration 1,238
Sludge 12RecyclingforFlushingResidential 3022 5 15,110 21 21 317
ConvienientShops 130 3 390 21 21 8
CommercialBldg 2065.3 1personsper10 207 21 21 4
School 2691.95 4personsperm2 673 21 21 14
Total 15,500 344WaterforRG 12810 m2 5lit/m2 64
818
WaterRequirementBasis(inlpcd)*
90%ofDomestic&100%ofFlushingRequirement
1%ofSewageGeneration
ExcessTreatedWatertonearbyagriculture&constructionworks
Waterrequirementiscalculatedconsideringthe86lpcdasperwaterconservationmeasuressuggestedinManualonnormsand standards forenvironment clearanceof large constructionprojectsPublishedbyMinistryofEnvironmentandForests,GovernmentofIndia.PageNo.63,Table2.4
ApplicationformforEnvironmentalClearance ProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200630
ANNEXUREV
EnvironmentalManagementPlanduringConstructionPhase Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbablesourceofImpact
MitigationMeasures Remarks
CONSTRUCTIONPHASE
1. AmbientAirQuality
Negativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipment’s
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise Negativeimpactnearnoise
Useofwell‐maintainedequipment.
generationsourcesinside
Noisegeneratedfrom
Heavyconstructionactivitylimitedtoday‐
Temporaryimpactsduring
Premises.Nosignificantimpacton
constructionactivitiesandoperationofconstruction
timehoursonly.Useofnoisemufflersinandconstructionvehicle.
constructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.
ambientnoiselevelsinthe
equipmentandDGsets
Surroundingarea.
Useofearplugs/muffsbyconstructionstaff.
3. Water Nosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,waste
Reutilizationandrecyclingofconstructiondebris
ApplicationformforEnvironmentalClearance ProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200631
Sr.No.
EnvironmentalComponents Predicted
Impacts
ProbablesourceofImpact
MitigationMeasures
Remarks
fromlabourcamp.
Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. Aesthetics Minornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200632
EnvironmentalManagementPlanduringFunctionalPhase
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures
Remarks
FUNCTIONALPHASE
1. AmbientAirQuality
MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
Useoflowsulphur
goodfuel
Periodic
maintenanceofDG
sets
UseofCNG/LPGas
afuelshouldbe
encouraged.
2. Noise
Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsets
inbuildingswith
appropriate
acoustics.
Traffic
management
measuresto
reducenoise
Appropriatetrees
whichwillactas
noisesbarriers
willbeplantedin
thepremisesand
alongroadside.
‐‐
3. Water
Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea. Dischargeofsewage. Dischargeofcontaminatedstormwater
Sewagewaterwill
betreatedand
recycled.
Rainwater
harvestingand
rechargeof
groundwater
aquiferis
proposed.
Good
housekeepingand
stormwater
managementwill
befollowed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. Land Nonegativeimpact
Storageanddisposalofsolidwastes.
Treatmentand
reuseofsewage
Segregationofdryandwetgarbagebefore
ApplicationformforEnvironmentalClearance ProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.200633
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures
Remarks
Dischargeofsewage. Fuelandmaterialspills.
water.
Integratedwaste
managementand
spillcontrolplan
Drygarbagewill
besentfor
recyclingandwet
garbagewillbe
composted.
willbedonebeforedisposal.
5. Biological OverallPositiveimpact
Habitat
disturbance
Greenspaces
insidethe
premiseswillhelp
tocompensatethe
earliereffectfrom
vegetation.
Landscapingand
extensive
plantationinthe
premises.
Landscapingwill
helpinreducing
anyadverse
impactsonair
andnoisequality.
6. Socio‐economic
Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐ Positiveandlongtermimpact‐
FUNCTIONALPHASE
7. TrafficPattern
NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
Traffic
Management
practiseswillbe
employed.
Adequateparking
spacewillbe
providedinthe
premises.
Recommended