View
6
Download
0
Category
Preview:
Citation preview
1
Rawly LantzD: 630.729.7944M: 630.810.0300 Ext. 116 rlantz@cawleychicago.com
Justin HarrisD: 630.810.1897M: 630.810.0300 Ext. 177 jharris@cawleychicago.com
For More Information, Contact:
Information contained herein has been obtained from the owner of the property or from other sources that we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. 5/1/19
Highlights � Class B Medical office building � Located in the central portion of the Village of Justice , 12 miles
south of the central business district of Chicago � Primary highway access to the area is via I-294 and I-55 � Ample parking
Details � Building size: 45,000 SF � Class: B � Floors: 2 � Year Built: 1997
Available � 1,100 SF - 40,000 SF
Pricing � Lease Price: Negotiable � Sale Price: Subject to Offer
Forest Med-Surg Center9050 W 81st St | Justice, Illinois
Available for Sale or Lease
Future I-290 Interchange
New I-294 Interchange Less Than 1/2 Mile
2
For More Information, Contact:
Information contained herein has been obtained from the owner of the property or from other sources that we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it.
Rawly LantzD: 630.729.7944M: 630.810.0300 Ext. 116 rlantz@cawleychicago.com
Justin HarrisD: 630.810.1897M: 630.810.0300 Ext. 177 jharris@cawleychicago.com
Site9050 W 81st | Justice, Illinois
61.55'
72.94'
6.85'
19.30'
37.63'
24.46'
6.85' 20.90'0.84'
13.40'
50.56'
24.08' 19.39'
6.85'
72.97'
61.55'
92.25'
53.05'
17.00' 8.98' 50.91'
103.06'
46.05'
49.86'
22 PARKING SPACES
5 PARKING
SPACES
14 PARKING SPACES
35PARKING
SPACES
12PARKING
SPACES12
PARKINGSPACES
14PARKING
SPACES14
PARKINGSPACES
5 PARKING SPACES
18 PARKING SPACES
18 PARKING SPACES
17 PARKING SPACES
9 PARKING SPACES
11 P
ARKI
NG
SPA
CES
6PARKING
SPACES
4PARKING
SPACES
17PARKING
SPACES
81 ST STREET
MEDICAL CENTER
NO. 9050
27, 045 SF
CANOPY
3 PARKINGSPACES
394.24'
475.
55'
521.81'
603.
00'
156.01'
ASPHALT
ASPHALT
ASPHALT
PARCEL 1
KEAN
AVE
NUE
ARCHER AVENUE
ASPHALT PAVEMENT
ASPH
ALT
PAVE
MEN
T
SEWAGE LIFTSTATION
300.00'
331.77'
NORTH
PARCEL 2
LEGENDSYMBOL DESCRIPTION
STREET LIGHT
HANDICAPPED
SITE INFORMATION:PARCEL 1 = 236,774 SQ. FT. = 5.436 ACRESPARCEL 2 = 58,815 SQ. FT. = 1.350 ACRESTOTAL AREA = 295,589 SQ. FT. = 6.786 ACRES
Project No.:
Sheet No.:Date:
Scale:
Sheet Name:
Phase:
Drawn by:Checked by:Project Manager:
Address:
Owner:
Project Name:
C3D Architects101 S. Pine Street, Suite #9
Mt. Prospect, IL 60056847.797.8422 P./ 847.797.8421 F.
info@c3darchitects.comwww.c3darchitects.com
ARCHITECTS
COPYRIGHT:
DO NOT SCALE DRAWINGS.
The architect expressly reserves itscommon law copyright and other propertyrights in these plans. These plans are not tobe reproduced, changed or copied in anyform or manner whatsoever, nor are they tobe assigned to any third party without firstobtaining the expressed written permissionand consent of the architect.These drawings may have reproduced at asize different than originally drawn. Ownerand Architect assumes no responsibility foruse of incorrect scale.
As indicated
9050 81 ST STREET
A-009/05/11
SITE PLAN
CLIENT REVIEW
CNCNCN
No. Descr. Date
SC: 1" = 40'-0"00_SITE PLAN1
REGULAR PARKING SPACESDESCRIPTION COUNT
REGULAR PARKING SPACES 236
HANDICAPPED SPACESDESCRIPTION COUNT
HANDICAPPED SPACES 10
3
For More Information, Contact:
Information contained herein has been obtained from the owner of the property or from other sources that we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it.
Rawly LantzD: 630.729.7944M: 630.810.0300 Ext. 116 rlantz@cawleychicago.com
Justin HarrisD: 630.810.1897M: 630.810.0300 Ext. 177 jharris@cawleychicago.com
1st Floor Layout9050 W 81st | Justice, Illinois
292 SF
600
61 SF
910
40 SF
911
540 SF
909
688 SF
908
895 SF
907
958 SF
906
291 SF
905
296 SF
904
175 SF
903
314 SF
902
35 SF
1003
282 SF
900
138 SF
614
195 SF
601
92 SF
602
209 SF
603
1331 SF
604
108 SF
605
75 SF
606
124 SF
607
354 SF
608
46 SF
609
126 SF
610
163 SF
611
164 SF
612
220 SF
613
138 SF
615
1243 SF
616
97 SF
702
46 SF
7032240 SF
704
28 SF
705
28 SF
706
13 SF
707
44 SF
708
30 SF
709
30 SF
710
39 SF
711
47 SF
712
136 SF
713
32 SF
714
33 SF
715
32 SF
716
21 SF
717
136 SF
718
244 SF
719
58 SF
720
298 SF
721
625 SF
722
584 SF
723
308 SF
724
243 SF
725
115 SF
726
256 SF
727
1112 SF
728
163 SF
801
182 SF
802
186 SF
803 1198 SF
804
228 SF
807
81 SF
808
78 SF
809
46 SF
810
527 SF
811
196 SF
800
666 SF
805200 SF
814
162 SF
813389 SF
812
32 SF
815674 SF
806
1292 SF
700
392 SF
701
763 SF
COMMON CIRCULATION
42 SF
ELEVATOR
76 SF
ELEVATOR
140 SF
STAIR
38 SF
STAIR
100 SF
STAIR 34 SF
816
COPYRIGHT:
DO NOT SCALE DRAWINGS.
The architect expressly reserves its common lawcopyright and other property rights in these plans.These plans are not to be reproduced, changed orcopied in any form or manner whatsoever, nor arethey to be assigned to any third party without firstobtaining the expressed written permission andconsent of the architect.These drawings may have reproduced at a sizedifferent than originally drawn. Owner and Architectassumes no responsibility for use of incorrect scale.
C3D Architects101 S. Pine Street, Suite #9
Mt. Prospect, IL 60056847.797.8422 P./ 847.797.8421 F.
info@c3darchitects.comwww.c3darchitects.com
ARCHITECTS
Owner:
Sheet Name:
Phase:
Drawn by:
Checked by:
Project Manager:
Project Name:
Address:
Scale:
Date:
Project No.:
Sheet No.:
9050 81 ST STREET 1" = 10'-0"LOWER LEVELCLIENT REVIEW
CN
CN
CN
08/28/11
A-2
SC: 1" = 10'-0"
02_LOWER PLAN - NET AREA PLAN1
No. Description Date
ROOM SCHEDULE SUITE 600
NAME AREA COMMENTS
600 292 SF
601 195 SF Physiotherapy
602 92 SF Physiotherapy
603 209 SF Physiotherapy
604 1331 SF Physiotherapy
605 108 SF Physiotherapy
606 75 SF Physiotherapy
607 124 SF Physiotherapy
608 354 SF
609 46 SF
610 126 SF Vacant
611 163 SF Vacant
612 164 SF Vacant
613 220 SF Vacant
614 138 SF Vacant
615 138 SF Vacant
616 1243 SF Vacant
Grandtotal
5016 SF
ROOM SCHEDULE SUITE 700
NAME AREA COMMENTS
716 32 SF Justice Med Surg
717 21 SF Justice Med Surg
718 136 SF Justice Med Surg
719 244 SF Justice Med Surg
720 58 SF Justice Med Surg
721 298 SF Justice Med Surg
722 625 SF Justice Med Surg
723 584 SF Justice Med Surg
724 308 SF Justice Med Surg
725 243 SF Justice Med Surg
726 115 SF Justice Med Surg
727 256 SF Justice Med Surg
728 1112 SF Justice Med Surg
Grandtotal
8559 SF
ROOM SCHEDULE SUITE 700
NAME AREA COMMENTS
700 1292 SF
701 392 SF
702 97 SF Justice Med Surg
703 46 SF Justice Med Surg
704 2240 SF Justice Med Surg
705 28 SF Justice Med Surg
706 28 SF Justice Med Surg
707 13 SF Justice Med Surg
708 44 SF Justice Med Surg
709 30 SF Justice Med Surg
710 30 SF Justice Med Surg
711 39 SF Justice Med Surg
712 47 SF Justice Med Surg
713 136 SF Justice Med Surg
714 32 SF Justice Med Surg
715 33 SF Justice Med Surg
ROOM SCHEDULE SUITE 800
NAME AREA COMMENTS
812 389 SF Vacant
813 162 SF Vacant
814 200 SF Vacant
815 32 SF Vacant
816 34 SF
Grandtotal
5044 SF
ROOM SCHEDULE SUITE 800
NAME AREA COMMENTS
800 196 SF
801 163 SF S
802 182 SF ???
803 186 SF S
804 1198 SF Vacant
805 666 SF Vacant
806 674 SF Vacant
807 228 SF Forest Counseling
808 81 SF Forest Counseling
809 78 SF Forest Counseling
810 46 SF
811 527 SF Forest Counseling
ROOM SCHEDULE SUITE 900
NAME AREA COMMENTS
900 282 SF
901 90 SF
902 314 SF
903 175 SF
904 296 SF
905 291 SF
906 958 SF
907 895 SF Forest Hills Pharm
908 688 SF
909 540 SF
910 61 SF
911 40 SF
Grandtotal
4630 SF
NET AREA / GROSS AREA - LOWER LEVEL
AREA NET AREA / GROSS AREA
24579 SF 0.914519
Suite 900 4,630 SF
Suite 600 5,016 SF
Suite 800 5,044 SF
4
For More Information, Contact:
Information contained herein has been obtained from the owner of the property or from other sources that we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it.
Rawly LantzD: 630.729.7944M: 630.810.0300 Ext. 116 rlantz@cawleychicago.com
Justin HarrisD: 630.810.1897M: 630.810.0300 Ext. 177 jharris@cawleychicago.com
2nd Floor Layout9050 W 81st | Justice, Illinois
603 SF
101
335 SF
102
70 SF
103
68 SF
104
384 SF
105
124 SF
106
64 SF
107
109 SF
108
136 SF
109
67 SF
110
31 SF
111
306 SF
112
162 SF
113
100 SF
114100 SF
115
1723 SF
100
1038 SF
500
139 SF
501
105 SF
502
105 SF
503106 SF
504
106 SF
505
107 SF
506
140 SF
507
152 SF
508
110 SF
509
108 SF
510
106 SF
511
106 SF
51225 SF
513
25 SF
514
109 SF
515 109 SF
516
105 SF
517
107 SF
518
148 SF
519
27 SF
520
147 SF
521
113 SF
522
112 SF
523
109 SF
524
113 SF
525
113 SF
526
148 SF
527
999 SF
200
147 SF
201
112 SF
202
113 SF
203
112 SF
204
112 SF
205
113 SF
206
146 SF
207
28 SF
208
147 SF
209
105 SF
210
106 SF
211
105 SF
212106 SF
213
24 SF
214
26 SF
215
106 SF
216
106 SF
217
106 SF
218
98 SF
219
147 SF
220
146 SF
221
113 SF
222
112 SF
223
113 SF
224
113 SF
225
113 SF
226
148 SF
227
110 SF
301
115 SF
302
113 SF
303
114 SF
304
182 SF
305
178 SF
306
25 SF
307
106 SF
308
107 SF
309
108 SF
310
107 SF
311
107 SF
312
106 SF
313
189 SF
314
24 SF
315
227 SF
401
191 SF
402
48 SF
403
42 SF
404
152 SF
405
112 SF
406
147 SF
407
183 SF
408
110 SF
40937 SF
410
95 SF
411
272 SF
412
127 SF
414
112 SF
415
144 SF
416
216 SF
417
117 SF
418
143 SF
419
205 SF
420
272 SF
421
60 SF
422
19 SF
423
152 SF
413
1444 SF
300
1365 SF
400
330 SF
315
760 SF
CIRCULATION
42 SF
ELEVATOR
48 SF
STAIR
110 SF
STAIR
581 SF
300A
1138 SF
200A
35 SF
AUXILIARY
1107 SF
500A
148 SF
000
COPYRIGHT:
DO NOT SCALE DRAWINGS.
The architect expressly reserves its common lawcopyright and other property rights in these plans.These plans are not to be reproduced, changed orcopied in any form or manner whatsoever, nor arethey to be assigned to any third party without firstobtaining the expressed written permission andconsent of the architect.These drawings may have reproduced at a sizedifferent than originally drawn. Owner and Architectassumes no responsibility for use of incorrect scale.
C3D Architects101 S. Pine Street, Suite #9
Mt. Prospect, IL 60056847.797.8422 P./ 847.797.8421 F.
info@c3darchitects.comwww.c3darchitects.com
ARCHITECTS
Owner:
Sheet Name:
Phase:
Drawn by:
Checked by:
Project Manager:
Project Name:
Address:
Scale:
Date:
Project No.:
Sheet No.:
9050 81 ST STREET 1" = 10'-0"UPPER LEVELCLIENT REVIEW
CN
CN
CN
08/29/11
A-3
SC: 1" = 10'-0"
03_UPPER LEVEL - NET AREA PLAN1
ROOM SCHEDULE SUITE 100
NAME AREA COMMENTS
100 1723 SF
101 603 SF Forest Hills Pharm
102 335 SF
103 70 SF
104 68 SF
105 384 SF Vacant
106 124 SF Vacant
107 64 SF Vacant
108 109 SF Vacant
109 136 SF Vacant
Grandtotal
3615 SF
ROOM SCHEDULE SUITE 200
NAME AREA COMMENTS
214 24 SF
215 26 SF
216 106 SF E
217 106 SF Vacant
218 106 SF Fairbaim
219 98 SF Blanco
220 147 SF Mc Donnel
221 146 SF Fairbaim Blanco
222 113 SF Mc Donnel
223 112 SF Mc Donnel Furey
224 113 SF File Room
225 113 SF Kondelius
226 113 SF Kondelius
227 148 SF E Kondelius
Grandtotal
5059 SF
ROOM SCHEDULE SUITE 200
NAME AREA COMMENTS
200A 1138 SF
200 999 SF
201 147 SF PM
202 112 SF PM
203 113 SF PM
204 112 SF File Room
205 112 SF Vacant
206 113 SF PM
207 146 SF Vacant
208 28 SF
209 147 SF PM
210 105 SF Vacant
211 106 SF Vacant
212 105 SF PM
213 106 SF PM
ROOM SCHEDULE SUITE 300
NAME AREA COMMENTS
300 1444 SF
315 330 SF
300A 581 SF
301 110 SF Christen
302 115 SF Christen
303 113 SF Christen
304 114 SF Christen
305 182 SF Christen
306 178 SF Christen
307 25 SF
308 106 SF Christen
309 107 SF Christen
310 108 SF Christen
311 107 SF Vacant
312 107 SF Pitaro
313 106 SF Pitaro
314 189 SF Pitaro
315 24 SF
Grandtotal
4045 SF
ROOM SCHEDULE SUITE 400
NAME AREA COMMENTS
400 1365 SF
401 227 SF Vacant
402 191 SF Vacant
403 48 SF Vacant
404 42 SF Vacant
405 152 SF Vacant
406 112 SF Vacant
407 147 SF Vacant
408 183 SF Vacant
409 110 SF Vacant
410 37 SF Vacant
411 95 SF Vacant
412 272 SF Vacant
413 152 SF Vacant
414 127 SF Vacant
415 112 SF Vacant
416 144 SF Vacant
417 216 SF Vacant
418 117 SF Vacant
419 143 SF Vacant
420 205 SF Vacant
421 272 SF Vacant
422 60 SF Vacant
423 19 SF Vacant
Grandtotal
4549 SF
ROOM SCHEDULE SUITE 500
NAME AREA COMMENTS
500A 1107 SF
500 1038 SF
501 139 SF Beales
502 105 SF Beales
503 105 SF Beales
504 106 SF GianFrancisco
505 106 SF GianFrancisco
506 107 SF GianFrancisco
507 140 SF GianFrancisco
508 152 SF GianFrancisco
509 110 SF GianFrancisco
510 108 SF GianFrancisco
511 106 SF Vacant
512 106 SF Beales
513 25 SF
514 25 SF
515 109 SF Vacant
516 109 SF Vacant
517 105 SF Lin
518 107 SF Lin
519 148 SF Lin
520 27 SF
521 147 SF Lin
522 113 SF Lin
523 112 SF Lin
524 109 SF Lin
525 113 SF Vacant
526 113 SF Vacant
527 148 SF Vacant
Grandtotal
5050 SF
NET AREA / GROSS AREA - UPPER LEVEL
AREA NET AREA / GROSS AREA
24530 SF 0.91278
No. Description Date
Suite 100 1,583 SF
Suite 300
3,300 SF
Suite 200 5,400 SF
Suite 400 5,900 SF
Private Entrance
5
For More Information, Contact:
Information contained herein has been obtained from the owner of the property or from other sources that we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it.
Rawly LantzD: 630.729.7944M: 630.810.0300 Ext. 116 rlantz@cawleychicago.com
Justin HarrisD: 630.810.1897M: 630.810.0300 Ext. 177 jharris@cawleychicago.com
I-294 RAMPS AT 88TH/CORK AVENUEPublic Information Meeting Lipinski Community Center December 13, 2017
PURPOSE OF MEETING:Present the Proposed Improvement Plan, including required property acquisition, for public review and comment. Village and consulting engineering staff will be available to answer questions.
PROJECT STATUS:• Phase I Engineering was initiated in 2015. Phase I design approval is anticipated in
early 2018.• Multiple alternatives were developed and evaluated based on transportation
performance, impacts to environmental resources, socio-economic impacts, and cost.• The Proposed Improvement Plan was selected as the Preferred Alternative in
coordination with IDOT, the FHWA, the Illinois Tollway, and Cook County (CCDOTH). • See back page for the overall Proposed Improvement Plan.
PROPOSED IMPROVEMENTS:• New I-294 southbound entrance and northbound exit ramps at 88th/Cork Avenue.• Widening of the 88th/Cork Avenue bridge over I-294 to accommodate the proposed
ramps and a multi-use path and sidewalk.• Intersection improvements at 79th Street and 88th/Cork Avenue, including providing
longer turn lanes and a proposed westbound right turn lane to accommodate future 2040 traffic. The signal phasing will also be modified.
• Intersection improvements at Archer Road and Oak Grove Avenue, including providing dual left turn lanes at two quadrants and longer turn lanes to accommodate future 2040 traffic. Southbound Archer Road will also be realigned at the intersection to better align turning movements.
• Pedestrian accommodations are proposed, including an 8-foot wide multi-use path along 88th/Cork Avenue, Oak Grove Avenue and Archer Road, which will tie into the existing path at Village Hall. Sidewalks are also proposed along 88th/Cork Avenue, 79th Street and Archer Road.
NEXT STEPS:• After this Public Information Meeting, any comments will be addressed and final
Phase I Engineering Reports will be prepared and submitted to IDOT for approval. • After completion of Phase I, the Village of Justice will initiate the Phase II
Engineering (preparation of contract plans and land acquisition) which will take approximately 2 years.
• Construction is anticipated to begin in late 2020 or early 2021 contingent upon project readiness and funding availability.
• The Phase I Engineering estimated construction cost is approximately $25 million.
COORDINATION WITH THE ILLINOIS TOLLWAY I-294 PROJECT: Phase I Engineering for the Village of Justice project has been closely coordinated with the Illinois Tollway with respect to their planning for future I-294 reconstruction. The Village of Justice project is being planned in accordance with the Illinois Tollway’s Interchange and Roadway Cost Sharing Policy, and is planned to be completed before mainline I-294 reconstruction. The Village of Justice project is being designed to accommodate 2040 traffic that is projected to use the currently planned northbound exit and southbound entrance ramps at 88th/Cork Avenue as well as the future northbound entrance ramp at IL 171, based on planned improvements to I-294 by the Illinois Tollway.
PHASE I
Preliminary Engineering & Environmental
Studies
PHASE II
Contract Plan Preparation &
Land Acquisition
PHASE III
Construction
2015 2018 2020 TBD
PROJECT DESCRIPTION:The Village of Justice is nearing completion of preliminary engineering and environmental studies (Phase I Engineering) for the addition of Tri-State Tollway (I-294) northbound exit and southbound entrance ramps at 88th/Cork Avenue and is compatible with a future northbound I-294 entrance ramp from Archer Road. In addition to the new ramps, the project includes intersection improvements along 88th/Cork Avenue at 79th Street and Archer Road. The purpose of the project is to improve access to/from I-294 for residents and businesses within the Village of Justice and other adjacent communities.
Google Earth Image
COMMENTS OR QUESTIONSWritten comments can be submitted during this Open House Meeting using the comment form provided, mailed to the address indicated to the right, or emailed to mzarebczan@villageofjustice.org. Comments must be received by December 27, 2017 to become part of the official public record.
Matthew ZarebczanDirector of Economic DevelopmentVillage of Justice8748 W., 82nd PlaceJustice, IL 60458
Google Earth Image
Recommended