2

Doherty Apartments Site

3

2012 Institutional Master Plan

Excerpt from 2012 Institutional Master Plan:

4

Forbes/Beeler Residence

East Campus Garage

Existing ForestParking

(20 spaces)Proposed Building

Forbes Ave

Pull-off

Compactor & Generator

ZONING BOUNDARYPROPERTY BOUNDARY

Rendered Site Plan

5

Forbes/Beeler ResidenceZoning & Grading

50’

15’ Excerpt from 2012 Institutional Master Plan:

6

Forbes/Beeler ResidenceSite Section

Excerpt from 2012 Institutional Master Plan:

7

Forbes/Beeler ResidenceView from Forbes

8

Forbes/Beeler ResidenceView into the Plaza

9

Forbes/Beeler ResidenceView of Entry

10

Forbes/Beeler ResidenceNorth Façade

11

Forbes/Beeler Residence

South Elevation

Exterior Elevation Development

12

Forbes/Beeler ResidenceExterior Elevation Development

Banded BondRecessed every3rd course

Banded BondProjected every 3rd course

Running BondDarker coloredbrick

Running Bond

Soldier Course

Precast Concrete

Soldier Course

13

Forbes/Beeler ResidenceExterior Materials Precedents : Brick

14

Forbes/Beeler ResidenceExterior Materials Precedents: Precast Concrete

15

Forbes/Beeler ResidenceExterior Materials Precedents: Metal Roof

16

Forbes/Beeler ResidenceMarket Space

17

Forbes/Beeler ResidenceLandscape Plan

18

Forbes/Beeler ResidenceSite Plantings Streetscape

19

Forbes/Beeler ResidenceSite Plantings Angled Walk

20

Forbes/Beeler ResidenceSite Plantings Meadow

21

Forbes/Beeler ResidenceSite Plantings Screening

22

Forbes/Beeler ResidenceSite Lighting

23

Permitting- Design Review Complete- Planning Commission Feb 2020- Foundations and Excavation Early Spring 2020- Superstructure and Enclosure Filing late Spring 2020

Construction- Site Mobilization Mar 2020- Demolition of Doherty Apts Apr – Jun 2020- Excavation Apr – Sep 2020- Foundations Jun – Sep 2020- Steel Erection Sep 2020 – Feb 2021- Enclosure Jan 2021 – Sep 2021- Interior Work Mar 2021 – Apr 2022- Final Site Work Jan 2022 – Jun 2022- Occupancy Jul 2022

Schedule