FISCAL YEARS 2021 – 2024
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Executive Summary
April 9, 2020
2
TIP Overview OKI is designated as the Metropolitan Planning Organization (“MPO”) by the Governors of Ohio, Kentucky and Indiana acting through the Ohio Department of Transportation, the Kentucky Transportation Cabinet and the Indiana Department of Transportation in cooperation with locally elected officials for the Counties of Butler, Clermont, Hamilton and Warren in the State of Ohio; Boone, Campbell and Kenton in the Commonwealth of Kentucky; and Dearborn in the State of Indiana. As the MPO, OKI is required under Titles 23 and 49 of the U.S.C. to conduct the continuing, cooperative, and comprehensive urban transportation planning process. One product is this TIP that considers all surface transportation modes and supports regional development goals. The TIP is a four year listing of surface transportation projects planned for federal, state and local funding within the OKI region. The TIP is a prerequisite for the use of federal funds and represents the short‐range programming document to complement the OKI’s Metropolitan Transportation Plan, also referred to as the “Plan”. Projects in the TIP are considered to have committed funding, with the specific amount of funds identified by Fiscal year, funding type and phase. The last major update to the TIP was in May 2019, however, this is the first TIP that includes new ODOT projects beyond FY21. This TIP will become part of the statewide TIP (STIP) in Ohio, Kentucky and Indiana. The OKI FY 2021‐2024 TIP includes projects for improving highways that are accompanied by recommendations for improving bus service; advanced technologies to move traffic more efficiently; projects to help reduce drive‐alone commuting including; ridesharing; bicycle and pedestrian projects; upgrading highway operating efficiency and projects that improve freight operations in the region. In total, nearly $2.3 billion in federal, state and local funds are identified in the TIP. Of that $2.3 billion, about $1.2 billion are federal funds.
The TIP meets the same requirements as the Plan in that it meets air quality and fiscal constraints. Details on fiscal constraint and the air quality conformity process and results can be found in the TIP document. The development of the TIP meets all U.S. Department of Transportation requirements for content, process and public involvement and is paid for with OKI federal planning funds.
This Executive Summary contains a listing of highway projects and maps by county and transit projects for each of the transit operators in the region. Total project costs are summarized in this Executive Summary, with additional details on funding types and project phases by fiscal year to be found in the TIP document. Many routine highway maintenance projects are not included in this list, but are identified in the TIP appendix, as a statewide grouped project.
§̈¦75
ST129
ST122
ST73
ST748
ST4
ST63
ST130
ST503
ST747
ST128
ST744
ST126
ST177ST732
¾¡42
¾¡27
¾¡127
106129
106407
104195
103371
0 2 41 Miles ¯
BUTLER COUNTY FY 2021-2024 TIP PROJECTS
Path: T:\GIS\Projects\TIP\TIP21_24\ButlerCounty.aprxDate: 03-05-2020|
LegendBicycle/Pedestrian/OtherBridge/Culvert ReplacementMaintenance/ReconstructionStudiesTransitTraffic Operations/SafetyITSWidening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Butler County Total Programmed
Costs104195 BUT SR 129
25.00 Liberty Way
1Q21Butler SR-129 interchange with Liberty Way and IR-75; Cox Road north of Liberty Way
Reconfiguration of the interchange of SR-129 with Liberty Way and IR-75. SR-129 will be extended east to tie into Cox Road, north of Liberty Way. Existing ramps connections will also be reconfigured.
$24,623,726
106129 BUT Five Points Roundabout
1Q22Butler Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley
Improve the five road intersection by converting to a roundabout
$3,522,334
106407 CR 148 3Q21Butler CR 148 at Wayne Madison and Hamilton Trenton Road
install a multi-lane roundabout with pedestrian accomodations
$3,456,895
NP-STBG1
Liberty Way FY23Butler Between I-75 NB on-ramp and Cox Road intersection
Convert the eastbound and westbound turn lanes at Cox Rd intersection to dual left turn lanes with signal modifications. Extend existing westbound turn lane to Cox Rd.
$2,472,850
109757 BUT M2M Trail Extension
3Q22Butler County Metro Parks
Gilmore Ponds Preserve MetroPark, from parking area on N. Gilmore Rd to SR4 Byp to exist. Trail
Construction of Multi Use Path through Gilmore Pons Preserve MetroPark, to extend the Miam 2 Miami Regional Trail
$2,019,711
NP-STBG6
Hamilton ITS/Traffic Signal Upgrade
FY22HamiltonThroughout the City of Hamilton Installation of a central based signal system for the City's 94 traffic signals, upgraded controllers and detection and improved communication between traffic signals using fiber optic cable
$5,251,094
103371 Butler Warren Road & Western Row Rd
2Q21MasonIntersection of Butler Warren Road with Western Row/Barret Road
Convert intersection from existing stop-controlled to a modern roundabout. Improve curb, gutter, drainage, culvert and geometry.
$1,927,632
100188 Great Miami River Trail Extension
4Q20MiddletownAdjacent to SR 73 from current trail terminus near Briel Blvd. to Baxter Dr trailhead north of SR 73
Construction of 10' wide multi-use trail to extend existing Great Miami River Trail
$683,500
109468 Central Avenue
4Q22MiddletownBetween Verity Parkway and University Boulevard
Reconstruction with upgraded pavement, curb, storm sewer and pedestrian lighting. Includes left turn lanes, street calming and bike racks.
$6,889,714
109591 Great Miami River Trail - Monroe Section
1Q22MonroeSouthern terminus at Monroe Bicentennial Commons Park and extends to the northern city limits
10' multi use path along Great Miami River $1,391,000
108112 BUT Oxford Area Trail Phase 3
2Q22OxfordConnection of Peffer Park to Talawanda High School
Construction of shared use path on south side of Oxford. Also paving the existing crushed aggregate path that connects Bonham Rd and SR 73 on the east side.
$4,535,750
NP TA - 5 Smith Road Connector Trail
1Q22West Chester Township
Trail from the roundabout at Smith Road and Becket Road to the existing trails on Smith Road
Multi Use Trail from Smith Road/Becket road to Smith Road
$978,874
25-Mar-20 Ohio-Butler County Page1
§̈¦275ST286
ST450
ST32
ST28ST126
ST774
ST48
ST727
ST749
ST276
ST743
ST756
ST232
ST131
ST132
ST222
ST125
ST133¾¡50
¾¡52
108254
NP-TA5
NP-CMAQ3
NP-CMAQ3
0 3 61.5 Miles ¯
Clermont County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\ClermontCounty.aprxDate: 03-05-2020
LegendBicycle/Pedestrian/OtherBridge/Culvert/ ReplacementITSMaintenance/ReconstructionStudiesTransitTraffic Operations/SafetyWidening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Clermont County Total Programmed
Costs103957 CLE 32-2.33 FY24Clermont
CountyGlen Este Withamsville ramps and CD Road
CD Road and partial ramps at GEW. Design under PID 82370. This will be part 1/part 2 with PID 103959.
$25,791,144
103958 CLE CR 55 Overpass
FY24Clermont County
Glen Este Withamsville Overpass over SR32
GEW Overpass over SR 32 $500,000
104712 ITS Phase 3 3Q20Clermont County
In and around Milford and along the US 50 and SR 28 corridors
Interconnection of 15 traffic signals under municipal and ODOT jurisdiction
$2,328,920
108254 CLE CR 3 Aicholtz Rd Roundabouts
2Q22Clermont County
West of Eastgate Square Drive to Glen-Este Withamsville Rd noth of Burgoyne Drive
Construct three roundabouts (1) Aicholtz at Eastgate Square Drive (2) realigned Aicholtz with Glen Este Withamsville (south), and (3) realigned Aicholtz with Glen Este Withamsville (north)
$6,687,500
NP-CMAQ3
US 52 FY24New Richmond
within Village of New Richmond Convert four lanes of US 52 into two lanes and provide bike/ped path at former SB lanes. Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts.
$7,500,000
103953 CLE CR 388 (Bach Buxton)
FY22ODOTBach Buxton to Marina Drive Realigning Bach Buxton to align with proposed SR32 interchange. This project will include all clearing for PIDs 103953, 103954, 103955, & 103959. Design under PID 82370.
$6,149,675
103954 CLE 32-3.50 FY22ODOTnear intersection with Bach Buxton Road
Proposed interchange at SR32 and Bach Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane).
$36,533,204
103955 CLE CR 171 (Old SR74)
FY23ODOTOld SR 74 Schoolhouse to SR 32 Old SR74 improvements to allow the proposed interchange at Bach Buxton. Design under PID 82370.
$5,737,578
103956 CLE 32-2.65 4Q20ODOTbetween MP 2.65 and 4.98 Westbound 3rd lane with concrete barrier median. Design under PID 82370. Part 2 of PID 103954.
$250,000
103959 CLE 32-2.88 1Q22ODOTEB 32 ramp to Clepper Lane Ramp from SR32 East Bound to Clepper Lane. Design under PID 82370.
$4,640,000
107292 CLE US 50/SR 132 Intersections
2Q23OwensvilleUS 50 and SR 132 intersections in Village of Owensville (two intersections)
Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals.
$1,965,154
105055 Pierce Township Park Renovation
3Q20Pierce Township
1,800 ft of multi use path extending the existing trails to the southwestern portion of the park
Construction of sidewalk and multi-use trail to extend the existing trail network into the southwest portion of Pierce Township Park. Relocation of existing multi-use trail.
$263,325
NP-TA5 Williamsburg East Main Street Path
FY23WilliamsburgAlong East Main Street from the Little Miami crossing at the Community Park to SR133
Construct concrete side path $456,604
25-Mar-20 Ohio-Clermont County Page1
§̈¦75
§̈¦275
§̈¦74
ST3
ST126ST128
ST264
¾¡42
¾¡25
¾¡27
¾¡127
¾¡50
¾¡52
108014
NP-TA4
NP-TA2
106404
105349
NP-TA1
105315
25349
0 2 41 Miles ¯
West Hamilton County FY 2021-2024 TIP
Path: T:\GIS\Projects\TIP\TIP21_24\W_HamiltonCounty.aprxDate: 02-26-2020
LegendBicycle/Pedestrian/OtherBridge/Culvert ReplacementITSMaintenance/ReconstructionStudiesTraffic Operations/SafetyTransitWidening/Relocation
§̈¦75
§̈¦471
§̈¦74
§̈¦275
§̈¦71
ST264
ST747
ST562
ST32
ST561
ST125
ST4
ST126
ST3
¾¡25
¾¡50
¾¡27
¾¡52
¾¡42¾¡127
¾¡22
88124NP-TA4
107866
105162
107295
111503
104934
109704
109437
105184
105349
NP-STBG5
NP-CMAQ4
105181
NP-STBG4111491
88133
NP-TA1
88132
76256
86461
77889
76256
0 2 41 Miles ¯
East Hamilton County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\E_HamiltonCounty.aprxDate: 02-26-2020
LegendITSBridge/Culvert ReplacementMaintenance/ReconstructionStudiesTransitTraffic Operations/SafetyWidening/RelocationBicycle/Pedestrian/Other
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Hamilton County Total Programmed
Costs109437 Paddison
Road Sidwalks4Q21Anderson
TownshipPaddison Road from Blue Crest to Beechmont
New sidewalks on Paddison Road $872,844
103416 Plainfield Road Roundabouts
4Q21Blue AshIntersections with EB SR 126 ramps, Hunt Road and Peppermill Ln/Reed Hartman Hwy
Conversion of three signalized intersections to multi-lane modern roundabouts
$13,502,689
100046 ORT West Segment 1-Part 1
3Q20CincinnatiEvans Recreation Area (near the Mill Creek) to State Street, Part 2 Fairbanks to Gilday
Construction of a 10' wide multi-use trail. Includes CON funds from PID 100047 for Segment 2 Part 2
$1,622,758
105162 Auburn Avenue
4Q21CincinnatiDorchester Av to Gilman Av Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center.
$4,910,136
105314 Western Hills Viaduct Phase 1
3Q20CincinnatiWestern Approach to WHV Early Acquisition of RW. Fill and grade western approach to the WHV.
$12,000,000
105315 Western Hills Viaduct Phase 2
3Q21CincinnatiEastern Approach to WHV WHV Phase 2. ROW acquisition $9,687,500
105316 Western Hills Viaduct Phase 3
FY22CincinnatiWestern Hills Viaduct Removal of the south utility trough (currently empty) from the existing WHV
$2,996,000
105346 Western Hills Viaduct Phase 5
FY22CincinnatiWestern Hills Viaduct Remove Duke's distribution lines from under north utility trough and relocate to south side of viaduct if they cannot be removed entirely. Relocate water mak and fiber optic cables and remove trough.
$2,996,000
105347 Western Hills Viaduct Phase 6
1Q24CincinnatiRail yard below WHV and Mill Creek crossing south of WHV (from State Avenue to the rail yard)
estern Hills Viaduct (WHV) Phase 6: Construction of a new bridge over the Mill Creek, south of the WHV to provide contractor access for future construction. In addition, relocation of the bypass trac
$6,600,000
105349 Western Hills Viaduct Phase 8
4Q25CincinnatiWestern Hills Viaduct WHV Phase 8. Construction of new WHV including tower piers, approach bridge substructure, large span and approach span superstructures and decks and remaining approach roadway
$244,088,411
106228 Harrison Avenue-Pedestrian & Safety Improvements
3Q20CincinnatiWestwood, east side of Harrison Avenue between Urwiler and Montana
New sidewalks, curb & gutter, and lighting $375,000
108014 HAM US 50 8.43 Thornton Ave
2Q22CincinnatiThornton Av from Forbes Rd across the RR and River Road (US 50)
Bike/ped crossing along south side of Thornton Av, across River Rd and RR tracks to Fernbank Park
$1,154,325
109079 HAM Uptown Smart Hub
FY23CincinnatiWithin an area bounded by Reading Road (US 42), Whitter Avenue, I-71 and MLK Drive
Multi-modal transportation facility with fixed route bus and institutional shuttles. Includes park and ride and connection to bike/ped facilities
$35,310,000
111491 Wasson Way Phase 3
2Q21CincinnatiBetween Madison and Marburg Construct Phase 3 of the Wasson Way Shared Use Trail
$2,281,351
112893 Wasson Way Phase 4 & 5
FY22CincinnatiBetween Marburg and Red Bank/Murray Trail
Construct Phase 4 and 5 of the Wasson Way Shared Use Trail
$3,495,189
112894 Wasson Way Phase 6a
FY23CincinnatiBetween Woodburn Avenue and Blair Avenue
Construct Phase 6a of the Wasson Way Shared Use Trail
$2,223,460
NP-CMAQ2
Cincinnati Signals OTR-West End
FY24CincinnatiWest End, Queensgate, Pendleton and OTR neighborhoods
Establish a fiber optic communications platform to interconnect traffic signals. Includes underground duct bank, fiber cable, network communications, traffic signal controllers for adaptive system.
$8,000,000
25-Mar-20 Ohio-Hamilton County Page1
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Hamilton County Total Programmed
CostsNP-TA1 Central
Parkway Phase 2
FY23CincinnatiBetween Marshall Avenue and Ludlow Avenue
Extension of Shared Use Path $3,362,200
NP-TA3 Cincinnati Red Bike Expansion
FY23CincinnatiCity of Cincinnati Expansion of bike share program with more stations,e-bikes and fund replacement equipment and parts that are 5 years or older
$937,500
110519 Red Bike Expansion
4Q20Cincy Bike Share
Various locations in the City of Cincinnati
Red bike expansion (ebikes) $625,000
NP-TA2 Colerain Avenue Sidewalks
FY23ColerainFrom Shady Crest Drive to Jonrose Avenue
Replace sidewalks $1,243,813
105831 Deer Park Community Bike/Pedestrian Network
3Q20Deer ParkSt. Johns Ter: Plainfield Rd to Chamberlain Park; Blue Ash Rd: from the park to Orchard; Orchard: Bl
Paved Multi-use path. Pavement replacement, resurfacing and RR crossing for ADA compliant access.
$1,197,205
107866 HAM Winton Rd/IR 275 Ramp Y
1Q22FairfieldOmniplex Drive south to Ramp Y (WB I-275 on -ramp)
Additional right turn lane from SB Winton onto WB I-275 on-ramp. Dual right turns on ramp.
$1,078,000
105763 Harrison Avenue
3Q20Green TwpWesselman Road to Harrison Greene SC
Widening of existing lanes and install sidewalk. Construct shared-use path to South Filview Circle.
$8,946,294
NP-TA4 Green Twp-Colerain Av Sidewalks
FY24Green TwpFrom Blue Rock Road to Loretta Avenue
Install sidewalks on both sides of Colerain Avenue
$615,670
107295 Little Miami Scenic Trail Beechmont Bridge
2Q21Hamilton County
From existing LMST on SR 32 east of LMR to the Lunken Trail west of the LMR
(1)Construction of new section of the LMT from existing trail on SR 32, utilizing existing bridge foundation, (2) Paint and replace bearings on bridge
$6,530,398
103712 HAM-71-0.00 - Brent Spence Paint
FY21KYTCHAM-71-0.00 Brent Spence Bridge: Painting Structural SteelApproach Spans: Painting Structural Steel
$32,000,000
111848 Taylor Southgate Bridge US 27
4Q24KYTCTaylor Southgate Bridge Painting Taylor Southgate Bridge Painting - KYTC Lead $18,000,000
111850 Dan Beard Bridge IR 471
4Q24KYTCDan Beard Bridge Painting Dan Beard Bridge Painting - KYTC Lead $10,400,000
104934 Montgomery Road Sidewalks Phase 2
1Q21MontgomeryEast side of Montgomery Rd from School House Lane to Radabaugh Drive
New Sidewalks along the east side of Montgomery Road
$533,192
107130 HAM CR 284 1.33 Pfeiffer Road
1Q22MontgomeryIntersection of Pfeiffer Road and Deerfield Road
Construct roundabout $1,505,512
107296 Mt. Healthy Signal System Phase 2
4Q20Mt. HealthyUS 127 (Hamilton Av) and Compton Road
Upgrade 14 traffic signals. $1,154,108
104668 HAM IR 74 18.01
1Q22ODOTFrom just west of Colerain interchange with I-74 to I-75
Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB
$3,800,000
106404 HAM US 27 10.39
1Q21ODOTBanning to Byrnside Install sidewalk on the west side of US 27; painted crosswalks, ADA curb ramps, concrete median
$771,479
106411 HAM IR 275 28.29 Part 1
2Q21ODOTRamp at the I-275 & US42 interchange
Ramp improvements at the I-275 & US 42 interchange; reassign lane usage on US 42 through Hauck Rd
$7,608,129
25-Mar-20 Ohio-Hamilton County Page2
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Hamilton County Total Programmed
Costs110259 HAM-IR 71-
1.34FY21ODOTLytle Tunnel Repair stone masonry veneer façade in
spandrels over and pilasters on either side of portals for tunnel. Entirely replace concrete wall cap on s.portal mainline tunnel with new reinforced concrete.
$532,400
25349 SR 264 (Glenway Avenue)
4Q24ODOTFrom 4.15 to 4.22 miles north of US 50.
Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment
$1,172,500
76256 IR 75 3Q21ODOTGlendale Milford Road to IR 275 Phase 8 of Thru the Valley Project--includes major rehabilitation and widening.
$52,268,930
77889 HAM IR 75 7.85
3Q22ODOTBegin south of SR562 interchange and at the SR126 interchange, 7.85 to 10.30
Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 562 interchange, remove the Towne Ave. inter
$178,980,288
82288 IR 75 3Q17ODOT0.3 mi S of Shepherd to 0.2 mi N of Glendale-Milford
Phase 1 of Thru the Valley Project-reconstruct IR 75 between Shepherd Lane and Glendale-Milford Road
$124,100,898
84492 IR 275 3Q18ODOTSLM 39.81 to 41.36--just before Four Mile Road to the Ohio River
Debt Service Only - Resurface and pavement repair PE phase listed in Line Items section
$37,683,522
88124 HAM IR 75 10.10
1Q24ODOT1010 Bridge over Mill creek to Galbraith Road (phase 3)
Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements
$39,622,703
88129 IR 75 1Q23ODOTRailroad bridge 11.09 on southbound IR 75 in the split
Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75
$53,631,244
88132 IR 75 2Q24ODOTBetween Galbraith Rd and Shepherd Ln, SB only
Phase 5 of the Thru the Valley Project-add 4th lane (includes part of Phase 7)
$52,420,000
88133 IR 75 2Q27ODOTBetween Galbraith Rd and Shepherd Ln, NB only
Phase 6 of the Thru the Valley Project--add 4th lane and auxiliary lane (includes part of Phase 7)
$144,793,527
89068 IR 75 3Q20ODOTBrent Spence Bridge (Ohio only) Detailed design, ROW and Construction phases of the Brent Spence Bridge project
$1,100,890,273
89077 IR 71 3Q20ODOTPart of the Brent Spence Bridge project
Ohio's share of design and construction of the new Ohio River Bridge
$121,424,200
91826 IR 71 3Q18ODOTFrom SR 562 to SR 126 Debt Service Only-Plane and pave a portion of IR 71. Highway signs included.
$47,751,648
94741 IR 71 3Q20ODOT0.1 mi south of Williams Avenue Overpass to 0.04 mi north of Red Bank (SLM 6.86-9.74)
Widen NB IR 71 for 3 continuous thru lanes thru the SR 562 interchange
$1,721,917
106571 HAM OKI FY2021 Rideshare
1Q21OKIButler, Clermont, Hamilton and Warren
OKI FY2021 Rideshare Program $168,443
106573 HAM OKI FY2022 Rideshare
1Q22OKIButler, Clermont, Hamilton and Warren
OKI FY2022 Rideshare Program $168,443
106574 HAM OKI FY2023 Rideshare
1Q23OKIButler, Clermont, Hamilton and Warren
OKI FY2023 Rideshare Program $168,443
106575 HAM OKI FY2021 AQ Program
1Q21OKIButler, Clermont, Hamilton and Warren
OKI FY 2021 Air Quality Program $197,579
106576 HAM OKI FY2022 AQ Program
1Q22OKIButler, Clermont, Hamilton and Warren
OKI FY 2022 Air Quality Program $197,579
25-Mar-20 Ohio-Hamilton County Page3
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Hamilton County Total Programmed
Costs106577 HAM OKI
FY2023 AQ Program
1Q23OKIButler, Clermont, Hamilton and Warren
OKI FY 2023 Air Quality Program $197,579
110352 OKI Travel Pattern Data (TRC Match)
1Q21OKIButler, Clermont, Hamilton and Warren Counties
One year of travel pattern data collection for the Cincinnati region
$1,013,831
111260 HAM OKI FY2024 Rideshare
1Q24OKIButler, Clermont, Hamilton and Warren
Ohio Rideshare Program FY24 $168,443
111261 Ohio Rideshare Program FY25
1Q25OKIButler, Clermont, Hamilton and Warren
Ohio Rideshare Program FY25 $200,000
111263 HAM OKI FY 2024 AQ Program
1Q24OKIButler, Clermont, Hamilton and Warren
Ohio Regional Air Quality Program FY 24 $197,579
111264 Ohio Regional Air Quality Program FY 25
1Q25OKIButler, Clermont, Hamilton and Warren
Ohio Regional Air Quality Program FY 25 $215,000
111547 HAM OKI 2021 Reg Plng - FIAM
1Q21OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation FIAM FY 21 (TRC match)
$73,724
111548 HAM OKI 2022 Reg Plng - FIAM
1Q22OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation FIAM FY 22 (TRC match)
$73,724
111549 HAM OKI 2023 Reg Plng - FIAM
1Q23OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation FIAM FY 23 (TRC match)
$73,724
111550 HAM OKI 2024 Reg Plng - FIAM
1Q24OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation FIAM FY 24 (TRC match)
$73,724
111552 HAM OKI 21 Reg Trans Plng - LU
1Q21OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation Planning Land Use FY 21 (TRC match)
$362,720
111553 HAM OKI 22 Reg Trans Plng - LU
1Q22OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation Planning Land Use FY 22 (TRC match)
$362,720
111554 HAM OKI 23 Reg Trans Plng - LU
1Q23OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation Planning Land Use FY 23 (TRC match)
$362,720
111555 HAM OKI 24 Reg Trans Plng - LU
1Q24OKIButler, Clermont, Hamilton and Warren
Ohio Regional Transportation Planning Land Use FY 24 (TRC match)
$362,720
77628 IR 71 4Q26OKII-71 Interchange @ MLK SIB Loan Debt Service $25,500,000
105181 Hauck Road Widening - Part 2
3Q21SharonvilleReading Rd to US 42 (Lebanon Rd) Reconstruct and add center turn lane with curb, gutter and sidewalk on north side
$857,400
105184 Kemper Road Shared Use Path
3Q21SharonvilleNorth side of Kemper Rd from SR42 to Sharon Woods Park-Lakeview Lodge driveway
Paved shared use path on Kemper Road $659,800
NP-CMAQ4
US 42 Shared Use Path
FY24SharonvilleBetween Downtown Sharonville and East Kemper Road
Construct a shared use path $2,304,943
107301 HAM US 22/SR 3 9.66 Silverton
3Q22SilvertonUS 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr.
Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management.
$2,744,912
25-Mar-20 Ohio-Hamilton County Page4
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Hamilton County Total Programmed
Costs109704 Crescentville
Road1Q22SpringdaleBetween Transportation Way and
Centerdale RoadWidening of Crescentville Rd to provide a two-way left turn lane, additional of new traffic signal at Chesterdale, addition of curb and gutter and storm sewer system to improve drainage
$5,408,529
111503 HAM CR 266 9.19 Kemper Interconnect
1Q21SpringdaleKemper Road from Tri-County Parkway to Century Boulevard
Transfer of existing fiber optic interconnect cable from current location to new steel Duke Energy poles plus transfer of existing power service.
$140,938
111520 HAM Springdale Signal Upgrades
FY22SpringdaleSR 747, Kemper, SR 4 and Crescentville Rd
Signal equipment upgrades including vehicle and pedestrian signal heads, push buttons, LED, conflict monitors and signal rebuild at SR 747 & Kemper. Vehicle detection upgraded at 4 intersections.
$683,639
25-Mar-20 Ohio-Hamilton County Page5
§̈¦75
§̈¦71
ST133
ST123
ST28
ST63
ST122
ST48
ST350
ST132
ST73
ST741
ST3
¾¡42
¾¡22
100816
106724
105175
NP-STBG8
103753
NP-STBG11
100816
NP-STBG7
104844
107302
0 2 41 Miles ¯
Warren County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\WarrenCounty.aprxDate: 03-03-2020
LegendBicycle/Pedstrian/OtherBridge/Culvert ReplacementITSMaintenance/ReconstructionStudiesTransitTraffic Operations/SafetyWidening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Warren County Total Programmed
Costs110419 US42 & SR63
PavingFY23LebanonWithin Lebanon city limits Milling, repaving and restriping. Includes road
base and concrete repairs$4,091,445
103753 SR 741 2Q21Masonfrom Spy Glass Hill (SLM 2.19) to Weldon Drive (SLM 3.06)
Widening of SR-741 to 5 lanes (2 thru lanes each direction and a center turn lane) from Spy Glass Hill to Weldon Drive in Mason. Traffic signals at US-42 and Bethany Road will be replaced.
$10,364,506
105175 Mason-Lebanon Bike Connector
2Q21MasonCity of Mason trail system near the Mason Sports Park to City of Lebanon's Countryside YMCA Trail
Construction of a shared use path $682,523
107302 WAR US 42 Roundabouts
2Q22MasonIntersections at Bethany Road and Mason-Morrow-Millgrove Road
Convert two existing stop controlled "T" intersections to roundabouts. Add multi-use path.
$3,399,027
NP-STBG8
SR 741 FY23MasonBetween Cox-Smith Road and Spy Glass Hill Road
Widen to two lanes each direction with traffic calming medians and left turn lanes at all intersections. Includes sidewalk and shared use path.
$5,459,897
100816 Countryside YMCA Trail Extension
3Q22ODOTBridge rehab & new trail btwn Lebanon Bike Park E of SR 48 and the YMCA. Connect north to Forge Rd.
Construction of new section of the Lebanon Countryside YMCA Trail. Includes rehab of E. Turtlecreek Union Road Bridge over SR 48.
$5,000,378
100827 WAR SR 73 14.58/14.62
2Q24ODOTWAR-73-1458 - WAR-73-1462 Rehabilitate bridge WAR-73-1458 over the Little Miami River by replacing the rigid wearing surface. Replace bridge WAR-73-1462 over Corwin Nixon Rd. and the Little Miami Bikepath.
$4,661,952
112121 WAR SR63 0.83
2Q22ODOTBetween Union Road and east of the SR 741 intersection
Widening of SR 63 $27,470,000
104844 IR 71 19.83/0.00
4Q21Warren County
Mason Montgomery Rd to SB I-71 New 2-lane ramp, improve signals, sidewalk on west side of MM Rd near Escort Dr, enhanced bus stop
$7,172,400
106724 King Avenue Bridge
4Q22Warren County
From approx 1,050' S of the LMR bridge on Grandin (CR-150) to approx 800' N of the bridge on King Av
Construct new bridge over Little Miami River, upstream of deteriorating existing bridge. Project will improve safety by improving alignment of approach roadway. Grade separate roadway from LMT.
$15,874,656
112909 SR 48 FY23WCEONunner Road to north of Ridgeview Lane/Saddle Creek Lane
Add one lane each direction. Add second southbound SR 48 left turn lane onto eastbound US 22/SR 3
$8,571,429
93964 IR 71 4Q17WCEOIR 71 at Western Row Road Convert existing partial interchange to full interchange with new ramps and auxiliary lanes
$33,159,023
25-Mar-20 Ohio-Warren County Page1
§̈¦275
§̈¦75
ST3168
ST2850
ST3147
ST1942
ST3159
ST2847
ST212
ST3608ST2846
ST3076
ST3503
ST1829
ST2852
ST491
ST717
ST3060
ST2951
ST1017
ST1292
ST1925
ST236
ST842
ST8
ST16
ST237
ST14
ST536
ST18
ST20
ST338
¾¡25
¾¡127
¾¡42
NP TA- 10
NP TA- 9
6-4456-459
0 2 41 Miles ¯
Boone County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\BooneCounty.aprxDate:03-05-2020
LegendBicycle/Pedestrian/OtherBridge/Culvert/ ReplacementITSMaintenance/ReconstructionStudiesTransitTraffic Operations/SafetyWidening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Boone County Total Programmed
Costs6-3200 KY 3060
(Frogtown Rd) Sidewalks
FY20Boone County
Northside of Frogtown Road from US 42 to War Admiral Drive
Construct new sidewalks $373,452
6-3215 Burlington Multi-Use Path
FY20Boone County
Along KY18 from KY237 to Aero Parkway
5450' of new 10' multi-use path $1,281,320
6-3225 KY 237 Multi-Use Path Phase 2
4Q20Boone County
East of KY 237 from KY20 to Medical Arts Drive
New 4700' of 10' MUP $426,000
6-3707 Limaburg Road
FY21Boone County
Intersection of KY 18 Extend the dedicated left turn lane, the straight/left turn lane and the dedicated right turn lane.
$356,623
6-440 KY 237 Multi-modal path
FY20Boone County
Stephens Elementary School north to KY 20/Petersburg Road
Construct a multi-modal path $2,539,159
6-442 Camp Ernst Road
FY21Boone County
Intersection with Longbranch Road Add a dedicated left turn lane on SB Camp Ernst Road to Longbranch Road
$1,269,439
6-459 Conner Road Multi-Use Path
4Q22Boone County
Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect
Construct 10' multi-use path. $2,015,000
NP TA - 8 Burlington KY 18 Sidewalks
1Q22Boone County
North and South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive.
New sidewalk on southside of KY 8 $619,750
NP TA - 9 Frogtown Connector Road Sidewalk
1Q22Boone County
West side of Frogtown Connector Road from the end of the existing sidewalk north to Calla Luna
5' sidewalk on west side of Frogtown Connector Road
$573,750
NP-SNK2 KY 20 FY23Boone County
at Aviation Blvd. Construct left and right turn lanes on KY 20 EB and WB at Aviation Blvd. Add crosswalk and new bus shelper pad at the intersection.
$1,450,000
6-439 Ted Bushelman Boulevard
3Q20CVG AirportAlong Ted Bushelman Boulevard Widen to 4 lanes and 2-way left turn lane $3,367,660
6-3218 Weaver Road Sidewalks
3Q20FlorenceFrom Tamarack Drive to Saddlebrook
Install sidewalks along 2,100' along north and east side of Weaver Road
$422,400
6-466 Florence Signal Upgrade
FY22FlorenceUS 42, Mall Road and Ewing Blvd Upgrade signals to central based system, upgraded controllers at 24 intersections, adaptive signal control, emergency vehicle preemption, CCTV cameras and fiber optic network
$3,689,690
NP TA - 10
Center and Russell Street sidewalk
1Q22FlorenceSouth side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct
New sidewalk on south side of Center Street $487,080
6-1087 KY 842 4Q21KYTCBridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence
Bridge Replacement) toll credits $9,300,000
6-20002 IR 75 4Q20KYTCBetween MP 169.439 and MP 183.08
Address pavement condtion $23,980,000
6-20008 KY 18 FY20KYTCBetween MP 15.256 and MP 16.632
Address pavement condtion $2,475,000
6-423 KY 3060 (Frogtown Rd)
4Q20KYTC900' either direction of intersection with Triple Crown
Correct vertical and horizontal curves. Toll credits for DES phase
$2,150,000
6-444 KY 236 (Donaldson Road)
UNSCKYTCfrom Houston Road (KY 842) to Mineola Pike (KY 3076)
Major widening $8,000,000
6-445 KY 3076 (Mineola Pike)
UNSCKYTCI-275 to KY 236 (Donaldson Rd.) Widen and improve $6,437,500
25-Mar-20 Kentucky-Boone County Page1
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Boone County Total Programmed
Costs6-446 Mall Road
Connector Ph 1&2
UNSCKYTCBetween KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange
Provide east-west connectivity and improved mobility
$19,770,000
6-78.00 I-275 FY20KYTCAt Graves Road New Interchange at I-275 and Graves Road $15,000,000
6-78.01 I-275 FY22KYTCAt Graves Road New Interchange at I-275 and Graves Road $14,000,000
6-80.00 KY 14 @ I-75 UNSCKYTCInterchange of I-75 and KY 14 in Walton
Reduce congestion and improve traffic mobility $500,000
6-80003 US 42 UNSCKYTCat the I-71/I-75 Interchange Increase capacity and reduce congestion by widening the bridge to provide for sidewalks and extend the left turn lane for WB US 42 to SB I-71/75
$8,250,000
6-3220 Walton Pedestrian Bridge
3Q20WaltonWalton- High Street over CSX RR Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street
$285,000
25-Mar-20 Kentucky-Boone County Page2
§̈¦275§̈¦471
ST2828
ST709
ST3490
ST735
ST445
ST2926
ST1632
ST1566
ST2921
ST2925
ST1996
ST2345ST2238
ST1892
ST2924
ST824
ST154
ST536
ST1998
ST1997
ST547
ST1120
ST9
ST1936
ST915
ST1121
ST10
ST8
¾¡27
6-407
NP-SNK1
6-1086
6-462
6-8105.00
NP TA- 11
6-352
0 2 41 Miles ¯
Campbell County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\CampbellCounty.aprxDate: 02-24-2020
LegendBicycle/Pedestrian/Other
Bridge/Culvert/ Replacement
ITS
Maintenance/Reconstruction
Studies
Transit
Traffic Operations/Safety
Widening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Campbell County Total Programmed
Costs6-3227 Grandview
Elementary Sidewalk
4Q20BellevueEast side of S. Foote Avenue New 180' of 10' sidewalk $104,000
NP-SNK1 Donnermeyer Drive
FY23BellevueBetween Riviera Drive and Berry Avenue
Improve roadway, consolidate access points, add bike lane and replace sidewalks
$988,560
6-460 NKU Mixed-Use Development Transportation Project
4Q22Campbell County
KY 2238 (Nunn Drive) and US 27 Impoved access to new development with new turn lane from SB US 27 to Nunn Dr, upgrade and reconstruction of old sidewalks, transit super stop and new bike/ped path linking NKU campus.
$1,237,006
6-3228 Dayton Pike Sidewalk Connector
4Q20DaytonAlong west side of Dayton Pike New 1500' of 5' sidewalk $270,720
6-3505 Dayton Safe Routes to School
FY20DaytonAlong west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th.
Connect north and south Dayton by constructing new sidewalks and new roadway markings
$309,200
6-453 Riverfront Commons
3Q20DaytonBerry Street to Fourth Avenue 15' wide concrete bicycle/pedestrian trail and conduit for future lighting. Part of 11.5 mi project
$1,123,500
6-462 Dayton Riverfront Commons-Eastern Trail
4Q22DaytonBetween Berry Street and Fourth Avenue (KY 8)
Continuation of Riverfront Commons multi-use path
$1,010,657
NP TA17-1
Dayton KY8/TANK Rt 12 Upgrade Project
4Q20DaytonKY 8 from O'Fallon Av to Clark St. Adds sharrows along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route.
$135,953
2020 RTP-1
Fort Thomas Ohio River Trail
FY20Fort ThomasAlong Ohio River in the City of Fort Thomas
Construction of new trails, trailside and trailhead facilities and handicap access
$61,609
6-3216 North Ft. Thomas Sidewalk
FY20Ft. ThomasNorth Fort Thomas Av from Covert Run to Northridge Lane
New 5' sidewalk parallel to N. Ft. Thomas Avenue $651,530
6-10000 KY 2238 (Gibson Road)
FY20KYTCBridge over Three Mile Creek Address deficiencies of Gibson Road Bridge $1,620,000
6-10007 Taylor Southgate Bridge (US 27)
FY20KYTCTaylor Southgate Bridge over the Ohio River
Safety cable repair and preventative maintenance $250,000
6-1095 Covert Run Pike Bridge
4Q20KYTCBridge replacement over Covert Run Pike (CR 1363) over a tributary to Taylor Creek
Bridge replacement (toll credits) $1,505,000
6-183.00 IR 471 FY20KYTCThe I-471 Corridor (MP 0.00 to 5.016)
Study and rehabilitate the I-471 corridor (toll credits)
$1,439,840
6-352 KY 536 FY22KYTCUS 27 to AA Highway (KY 9) Extension of existing roadway $63,840,000
6-407 KY 9 FY21KYTCKY 9 at MP 21.8 Reconstruct railroad underpass (toll credits) $3,481,000
6-443 US 27 FY20KYTCExtend SB right lane 350' to create continuous 3 lanes from Marshall Lane to Johns Hill Rd (KY 3490)
Add lane to provide three continuous southbound through-lanes to Johns Hill Road.
$875,000
6-448 KY 9 UNSCKYTCAt the I-275 interchange with KY 9 (AA Hwy)
Improve safety and reduce congestion $700,000
6-8104.00
IR 471 UNSCKYTCKY 8 interchange Construct a new southbound off-ramp from I-471 to KY 8
$32,640,000
6-8105.00
I-275/AA Connector
UNSCKYTCBetween I-275 and the AA Highway (KY 9)
New road connecting the AA highway to NKU $27,815,000
25-Mar-20 Kentucky-Campbell County Page1
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Campbell County Total Programmed
Costs6-8105.06
I-275/AA Connector
UNSCKYTCJohns Hill Road to AA Highway (KY 9) Toll credits as match
New road connecting the AA highway to NKU $11,030,000
6-8706 US 27 FY20KYTCMP 17.9 in Pendleton County to MP 1.9 in Campbell County
Reconstruction $28,110,000
6-3219 Newport Red Bike
FY20NewportNewport Expansion of Red Bike into the City of Newport $133,295
6-427 Carothers Road
FY20NewportMonmouth Street to right turn lane into Newport Shopping Center
Roadway rehabilitation $1,366,854
6-451 US 27 (South Monmouth Phase 1 &2)
3Q20NewportNewport/Southgate city limits to 11th St, includes underpass of CSX RR bridge
South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops
$7,963,700
6-3214 KY 8 Sidewalk Phase 2
FY20Silver GroveSouth side of KY 8 from KY 8 to KY 547
Upgrade 1400' of sidewalk $196,259
6-3508 Silver Grove Safe Routes to School
FY20Silver GroveFour Mile Road from 3rd Street to Mary Ingles Hwy and also near Providence Trace Drive
Construct sidewalks and a trail $250,000
NP TA - 11
SilverGrove KY 8 Sidewalks Phase 3
1Q22Silver GroveSouth side of KY 8 from the corner of KY 8 and Kay Wright Lane to Morschel Park
Asphalt multi use path on south side of KY 8 $231,450
25-Mar-20 Kentucky-Campbell County Page2
§̈¦71§̈¦75
§̈¦275
ST1120
ST2967
ST3235ST2978
ST3148
ST717
ST2363
ST6168
ST2372
ST2374
ST842
ST3081
ST3070ST3187ST2373
ST3083
ST2045
ST3076
ST1501
ST2044
ST2047
ST3035
ST1072
ST3716
ST1486
ST1829
ST14
ST371
ST3072
ST2042
ST2046
ST2043
ST1930
ST536
ST1303
ST8
ST16
ST17
ST177
¾¡127
¾¡25¾¡42
NP TA - 12 NP TA - 12
6-461
NP-SNK3
6-450
6-162.10
6-463
6-162.21
6-162.01
6-79.00
6-79.00
6-8954
6-449
0 2 41 Miles ¯
Kenton County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\KentonCounty.aprxDate: 02-02-2020
LegendBicycle/Pedestrian/Other
Bridge/Culvert Replacement
ITS
Maintenance/Reconstruction
Studies
Transit
Traffic Operations/Safety
Widening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Kenton County Total Programmed
Costs6-3204 Electric Alley
Pedestrian Improvements
FY20CovingtonBetween 5th and 6th Streets in Covington
Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles
$1,275,000
6-3209 Riverfront Commons Highway Avenue Connection
FY20CovingtonWest of the Brent Spence bridge up to the sidewalks along Highway Avenue in Covington
Construct a multi-use path $1,230,000
6-456 Madison Avenue
FY20Covington11th Street to 8th Street Underground utilites, street trees, mast arm poles, streetlights, resurfacing, signal improvements.
$2,747,500
6-457 7th Street FY20CovingtonWashington St to Greenup St Sidewalk replaceme,underground utilities,street trees, mast arm traffic signals, lighting, resurface
$3,747,500
6-461 West Covington Riverfront Commons Shared Use Path
4Q22CovingtonBetween River Road and existing path located on the north side of the floodwall, just west of BSB
Construct 8' wide multi-use path $889,913
6-3213 Amsterdam Road (KY 371) Connector
FY20Crescent Springs
South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills
New sidewalk $775,829
6-428.00 Dudley Road FY20EdgewoodWinding Trails to Catherine Drive Resurface and stabilize the roadway (Design portions for phases 1 and 2)
$160,000
6-428.10 Dudley Road Phase 1
FY20EdgewoodWinding Trails to Thomas More Parkway
Resurface and stabilize the roadway $1,740,000
6-428.20 Dudley Road Phase 2
FY20EdgewoodThomas More Parkway to Catherine Drive
Resurface and stabilize the roadway $1,540,000
6-428.30 Dudley Road Phase 3&4
3Q20EdgewoodCatherine Drive to Dixie Highway Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction.
$5,316,333
6-441 Dolwick Connector
3Q20ErlangerDolwick Road to Mineola Pike Construct new sidewalks, dedicated bicycle lanes and retaining walls
$1,828,125
NP TA - 12
Brightleaf and Narrows Road Sidewalks
1Q22ErlangerBrightleaf Boulevard and Narrows Road
Sideawalk on Brightleaf Boulevard and Narrows Road
$234,344
NP-SNK3 KY 236 FY24ErlangerCommonwealth Avenue (KY 236) between Baker Street and Dixie Hwy
Add sidewalks, new curbing, signs and streetscape elements
$1,154,514
6-438 Amsterdam Road
FY20Ft. WrightGeneral Drive to Redwood Drive Reconstruct roadway with curb and gutter, storm sewers and sidewalk
$3,131,000
6-455 Cody Road FY20Independence
Banklick Creek to Independence Station Road
Mill and overlay with new asphalt $424,150
6-455.10 Cody Road FY21Independence
at Banklick Creek Replace culvert on Cody Road at Banklick Creek $229,580
6-8954 CR 1021 FY21Kenton County
Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits)
Bridge replacement $3,150,000
6-419 Bromley-Crescent Springs Rd.
FY20Kenton County Fiscal Court
Anderson Road to Amsterdam Road
Phase 1. Horizontal and vertical design improvements, addition of multi-use path
$7,236,000
6-419.01 Bromley Crescent Springs Phase 2
3Q20Kenton County Fiscal Court
Between the two segments of Amsterdam Road
Reconstruct Bromley Crescent Springs Road and improve intersection with St. Johns Road
$2,012,000
25-Mar-20 Kentucky-Kenton County Page1
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Kenton County Total Programmed
Costs6-10005 KY 17 FY20KYTCRoebling Bridge over the Ohio
RiverAddress deficiences on John A Roebling Bridge over Ohio River
$1,200,000
6-10006 US 25 FY20KYTCClay Wade Bailey Bridge over the Ohio River
Joint replacement and preventative maintenance $350,000
6-10012 KY 2045 FY20KYTCBridge over Brushy Creek Address bridge deficiencies $3,955,000
6-1070 West 15th Street
FY20KYTCMP 0.164 to 0.198--Bridge over CSX RR in Covington (toll credits)
Bridge replacement $3,490,000
6-1086 4th Street Bridge (KY 8)
UNSCKYTCOver Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line
Address deficiencies of bridge $7,510,000
6-162.01 KY 536 UNSCKYTCBoone County Line to KY 17 Reconstruct to 4 lane urban section with access mgmt. from east end of CSX RR, MP 0 to 4.50
$26,210,000
6-162.10 KY 1303 FY22KYTCKY 536 to Beechgrove Elementary Reconstruct and widen to four lanes and center turn lane (toll credits as match)
$15,700,000
6-162.20 KY 536 FY20KYTCBoone County Line to KY 1303 (Priority Section 1) DES under parent 6-162.01
Improve safety and reduce congestion-widenening
$12,030,000
6-162.21 KY 536 FY21KYTCEast end of the NS RR bridge to KY 1303
Reconstruct KY 536 $9,910,000
6-17.03 IR 75 FY22KYTCMP 191.277 to 191.777--Brent Spence Bridge
Replace Brent Spence Bridge $3,958,787
6-17.05 IR 75 FY20KYTCBrent Spence Bridge toll credits Replace Brent Spence Bridge Kenton County, Kentucky; funds for maintenance, repair and painting
$1,500,000
6-17.09 IR 75 FY20KYTCBrent Spence Bridge--MP 191.277 to 191.777 (toll credits)
Brent Spence Bridge Project (additional project funds for maintenance repair and painting)
$30,000,000
6-17.10 IR 75 FY21KYTCBrent Spence Bridge) toll credits Additional project funds for maintenance, repair and painting
$13,700,000
6-20039 IR 275 FY20KYTCBetween MP 82.475 and MP 83.78 Address pavement condtion $2,200,000
6-449 KY 17 UNSCKYTCAt the I-275 Interchange Improve safety and reduce congestion at the KY 17/I-275 interchange
$1,000,000
6-450 KY 1303 (Turkeyfoot Rd)
UNSCKYTCBetween Dudley Rd and US 25 (Dixie Hwy)
Improve safety and reduce congestion along Turkeyfoot Road
$4,500,000
6-79.00 I-75 UNSCKYTCAt I-275 and I71/75 Junction Improve safety, mobility, operations and geometrics
$2,000,000
6-82 IR 75 FY20KYTCI-71/I-75 NB entrance ramps from Pike Street and 4th Street (TDC match)
Increase safety for I-75 NB lanes at entrance ramps coming from Pike St.and 4th St. Eliminate ramp at 4th St. with new access via collector distributer, extend I-75 4 lanes from Pike St. ramp.
$4,300,000
6-8307.10
KY 1501 FY20KYTCFrom KY 17 to Crystal Lake Drive Relocate Hands Pike $13,510,000
6-8815 US 25 FY20KYTCNorth Arlington to the Covington sidewalk system (toll credits)
Sidewalk and curb construction $2,250,000
6-8915 IR 275 FY20KYTCFrom US 25 (Dixie Hwy) westbound (toll credits)
Construct a sound barrier wall $100,000
6-9014.01
KY 17 FY20KYTCFrom KY 14 to 0.143 miles north of Hergott Drive (toll credits)
Low cost safety improvements, sight distances and realignment at KY 2042 intersection
$1,210,000
6-435 Ludlow Riverfront Commons
FY20LudlowHooper to Ash Streets Construct a one-mile section of the Riverfront Commons project in the City of Ludlow
$355,493
25-Mar-20 Kentucky-Kenton County Page2
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Kenton County Total Programmed
Costs6-454 Adela Avenue FY20LudlowKY 1072 (Sleepy Hollow
Road/Deverill St) to KY 8 (Elm St)Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed.
$323,750
6-3223 Park Hills St. Joseph Lane Sidewalk
4Q20Park HillsNorthside of St. Joseph Ln beginning at Dixie Hwy intersection and ending at 516 St. Joseph Ln.
Construct a 4' wide concrete sidewalk on the north side of St. Joseph Lane
$217,147
6-463 Taylor Mill Sidewalk Project Phase 3
4Q23Taylor MillAlong north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street
Construction of new sidewalk $1,052,030
25-Mar-20 Kentucky-Kenton County Page3
§̈¦275
§̈¦74
ST56
ST262
ST148
ST62
ST46
ST350
ST48
ST1
¾¡52
¾¡50
1600706
0 2 41 Miles ¯
Dearborn County FY 2021-2024 TIP Projects
Path: T:\GIS\Projects\TIP\TIP21_24\DearbornCounty.aprxDate: 03-05-2020
LegendBicycle/Pedestrian/OtherBridge/Culvert ReplacementITSMaintenance/ReconstructionStudiesTransitTraffic Operations/SafetyWidening/Relocation
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Dearborn County Total Programmed
Costs1600706 Market Street 1Q22Aurora5th Street to Dutch Hollow Road Pavement reconstruction, minor realignment,
slope corrections and elimination of roadway hazards.
$2,914,409
1400725 East Laughery Road
1Q21Dearborn County
Bridge #5 on East Laughery Road, east of Gregory Road
Bridge replacement $2,425,694
1500202 County Bridge Inspections
4Q20Dearborn County
Dearborn County Countywide bridge inspections in Dearborn County
$300,813
1600719 Harrison Brookville Road (Old US 52)
3Q21Dearborn County
Bridge #108 at Johnson Fork Road Bridge replacement $2,700,000
1702959 IR 1023 2Q23Dearborn County
Lower Dillsboro Rd, 2800 ft west of Gatch Hill Rd to 1500 ft west of Gatch Hill
Slide Correction $1,900,000
1802885 Sneakville Road
4Q24Dearborn County
Bridge #64, 0.53 miles east of Mount Pleasant Road
Bridge replacement $2,076,700
1902773 North Hogan Road Bridge #33
FY25Dearborn County
over Little Hogan Creek, 0.05 miles west of Union Ridge Road
Bridge replacement $2,498,650
1801755 Greendale Trail #01
4Q20GreendaleCity of Greendale 1.01 mile of 12' wide asphalt trail, boardwalk, and crosswalk enhancements with drinking fountain, benches, bike racks and signage
$240,000
1297183 State Line Road
1Q22INDOTState Line Road and US 50 Intersection improvement $240,000
1383701 SR 46 3Q20INDOT2.81 miles west of SR 1 over East Fork of Tanners Creek
Bridge deck replacement $1,362,100
1383721 SR 46 4Q23INDOT0.44 mile west of US 52 over Whitewater River
Bridge Deck Replacement $4,780,293
1383726 SR 62 3Q20INDOT3.7 miles west of SR 262 over Hayes Branch
Bridge deck replacement $1,844,229
1500092 SR 1 3Q20INDOTAt Guilford Slide correction project $3,524,329
1500129 IR 74 3Q20INDOTWeigh Station west of the Ohio State Line
Reconstruct the weigh station in West Harrison $1,100,000
1500550 SR 46 1Q21INDOT1.14 miles east of SR 1 at Logan Creek
Bridge replacement (concrete) $3,448,100
1500551 SR 46 3Q20INDOT1.28 miles east of SR 1 at Logan Creek
Bridge replacement, concrete $997,338
1500552 SR 46 3Q20INDOT2.35 miles east of SR 1 at Logan Creek
Bridge replacement (concrete) project $943,139
1500566 US 50 FY21INDOT0.09 miles east of SR 56 at Hogan Creek
Bridge deck overlay project $1,925,924
1600460 IR 1001 (Pribble Road)
FY20INDOTAt CIND DOT #538034J railroad crossing near Greendale
Railroad protection $340,000
1600539 SR 46 2Q21INDOT3.2 miles east of SR 1 Erosion control $637,764
1700136 SR 1 2Q21INDOTIntersection of SR 1 and Oberting Road
New Signal Installation $300,276
1800225 US 50 4Q23INDOTAt the intersection of Front Street in Dillsboro
Intersection improvement with added turn lanes $1,277,025
1801320 US 50 1Q21INDOTSeymour District Guard Rail Attenuators, New or Modernize $377,789
1801494 US 50 4Q21INDOT2500' north of US 50 and SR 1 intersection
Auxilliary lanes, acceleration and deceleration or turn lanes
$2,033,785
25-Mar-20 Indiana-Dearborn County Page1
EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Facility Location DescriptionTIP ID SponsorAward/ Let Date
Dearborn County Total Programmed
Costs1801685 SR 1 4Q23INDOT3.6 miles south of I-74 Slide correction $385,142
2001058 UPWP-OKI Planning FY21
1Q21OKIOKI For Planning Purposes, PL and STP $62,500
NP UPWP-OKI Planning FY22
1Q21OKIOKI For Planning Purposes, PL and STP $62,500
NP UPWP-OKI Planning FY23
1Q21OKIOKI For Planning Purposes, PL and STP $62,500
25-Mar-20 Indiana-Dearborn County Page2
EXECUTIVE SUMMARY TRANSIT OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Butler County Regional Transit AuthorityProject Name Location DescriptionTIP ID
Total Programmed
CostsYear104272 BCRTA Operating Assistance Butler County Operating Assistance $8,000,000FY21
104280 BCRTA Prev Maintenance Butler County Preventive Maintenance $3,000,000FY21
104384 BCRTA ADA Operating Butler County ADA Operating Assistance $750,000FY21
104389 BCRTA Security Equipment Butler County Security Equipment $75,000FY21
104394 BCRTA Shop/Office Equipment Butler County Shop/Office Equipment $175,000FY21
104398 BCRTA Software/Hardware Butler County Technology Updates $600,000FY21
104400 BCRTA Transit Enhancements Butler County Transit Enhancements $75,000FY21
104401 BCRTA Small Bus Replacement Butler County Small Replacement Buses - CMAQ portion only are flex fund transfers
$468,750FY20
104453 BCRTA Facility Improvements Butler County Facility Improvements $875,000FY21
108916 BCRTA Construct Facility Butler County Construct Facility $500,000FY20
112170 BCRTA Small Bus Replacement Butler County Small Replacement Buses $800,000FY21
112173 BCRTA Facility Construction Butler County Construct facility $500,000FY21
NP-CMAQ1
Chestnut Street Multimodal Transportation Ce
City of Oxford Multimodal Transportation Center in Oxford $5,650,000FY24
Clermont Transportation ConnectionProject Name Location DescriptionTIP ID
Total Programmed
CostsYear104281 CTC Cap Maintenance 2020 Clermont County Capitalized Maintenance $250,000FY20
104356 CTC Cap Maintenance Clermont County Capitalized Maintenance $1,000,000FY21
104369 CTS Op Assistance FY2020 Clermont County Operating Assistance $740,840FY20
104371 CTS Operating Assistance 2021 Clermont County Operating Assistance $740,840FY21
104377 CTC Security Equipment 2020 Clermont County Security Equipment $15,000FY20
104378 CTC Security Equipment 2021 Clermont County Security Equipment $15,000FY21
104418 CTC Transit Enhancements 2020 Clermont County Transit Enhancements $15,000FY20
104421 CTC Transit Enhancements 2021 Clermont County Transit Enhancements $15,000FY21
104425 CTC Short Range Planning 2020 Clermont County Short Range Planning $10,000FY20
104429 CTC Short Range Planning 2021 Clermont County Short Range Planning $10,000FY21
111943 CTS Op Assistance FY2022 Clermont County Operating Assistance $740,840FY22
111946 CTS Op Assistance FY2023 Clermont County Operating Assistance $740,840FY23
111947 CTS Op Assistance FY2024 Clermont County Operating Assistance $740,840FY24
111956 CTC Security Equipment 2022 Clermont County Security Equipment $15,000FY22
111958 CTC Transit Enhancements 2022 Clermont County Transit Enhancements $15,000FY22
111959 CTC Short Range Planning 2022 Clermont County Short Range Planning $10,000FY22
Middletown Transit ServiceProject Name Location DescriptionTIP ID
Total Programmed
CostsYear104379 Middletown Transit Operating City of Middletown Operating Assistance $9,600,000FY21
104381 Middletown Transit Prev Maint City of Middletown Preventive Maintenance $1,000,000FY21
104382 Middletown Transit ADA Asst City of Middletown ADA Operating Assistance $400,000FY21
27-Mar-20 Ohio-Butler County Page7
EXECUTIVE SUMMARY TRANSIT OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
OKIProject Name Location DescriptionTIP ID
Total Programmed
CostsYearNP-OKI1 OKI Subrecipient Vehicles Butler, Clermont, Hamilton and
Warren CountiesReplacement Vans MMV, LTN, LTV $321,626FY21
NP-OKI2 OKI Subrecipient Vehicles Butler, Clermont, Hamilton and Warren Counties
Expansion Vans MMV, AV, LTN, LTL $685,081FY21
NP-OKI3 OKI Subrecipient Mobility Management Programs
Butler, Clermont, Hamilton and Warren Counties
CABVI and CJN Programs $413,274FY21
NP-OKI4 OKI Subrecipient Vehicle Support Butler, Clermont, Hamilton and Warren Counties
Surveillance Cameras $4,610FY21
NP-OKI5 5310 Program Administration FFY18 Allocation
Butler, Clermont, Hamilton and Warren Counties
Subrecipient oversight and Coordinated Plan maintenance
$140,705FY21
Southwest Ohio Regional Transit AuthorProject Name Location DescriptionTIP ID
Total Programmed
CostsYear104410 SORTA Operating Assistance Hamilton County Operating Assistance $77,704,288FY21
104411 SORTA 2021 Preventative Maintenance
Hamilton County Operating Assistance $11,037,025FY21
104412 SORTA ADA Service Hamilton County Access Paratransit Service $1,281,709FY21
104413 SORTA Tire Lease/Security Equip Hamilton County Leasing of Tires for Fixed Route Buses/Security Equipment
$165,000FY21
104414 SORTA Bus Replacements Hamilton County Bus Replacements - CMAQ funds only are a flex fund transfer through the OTPPP
$5,016,880FY20
104415 SORTA Bus Replacements Hamilton County Bus Replacements - CMAQ funds only area flex fund transfer through the OTPPP
$2,690,000FY21
107283 SORTA FY21 Bus Replacements Hamilton County Bus replacements using OKI CMAQ funds as a flex fund transfer.
$5,260,000FY21
109541 SORTA Bus replacements Hamilton County Replacement of five 40' buses $2,668,840FY20
112014 SORTA 2022 ADA Service Hamilton County Paratransit Service $1,281,709FY22
112024 SORTA 2021 Operating Assistance Hamilton County Operating Assistance $1,720,000FY21
112025 SORTA 2022 Operating Assistance Hamilton County Operating Assistance $77,704,288FY22
112043 SORTA 2022 Preventive Maintenance Hamilton County 5307 - Urban Formula $13,034,371FY22
112046 SORTA 2022 Preventive Maintenance UTP
Hamilton County UTP (Capitalized Maintenance) $1,282,635FY22
112048 SORTA 2022 Bus Replacements OTPPP
Hamilton County Bus Replacements - CMAQ funds only are a flex fund transfer though the OTPPP
$4,500,000FY22
112049 SORTA 2023 Operating Hamilton County SORTA 2023 Operating $1,720,000FY23
112050 SORTA 2023 Bus Replacement FFT Hamilton County PID for SORTA 2023 Bus Replacement Flex Fund Transfer
$8,363,850FY23
112051 SORTA 2022 Op Assistance OTPPP Hamilton County Bus Replacements - 40 ft. bus $1,720,000FY22
112052 SORTA 2023 Bus Replacements Hamilton County Bus Replacements - 40 ft. bus $2,600,000FY23
112053 SORTA 2023 Security Equipment Hamilton County SORTA 2023 Security Equipment $165,000FY23
112054 SORTA 2023 Bus Replacements 5339Hamilton County SORTA Bus Replacements 5339 $928,000FY23
112055 SORTA 2023 Vehicle Replacements Hamilton County Vehicle Replacements $1,478,880FY23
112056 SORTA 2023 Bus Replacements Hamilton County Bus Replacements $5,000,000FY23
112057 SORTA Bus Replacements Hamilton County Replacement of 15 diesel buses $7,639,6644Q20
112058 SORTA 2023 Facility Preventive Maintenance
Hamilton County Govt. Square Transit Center Refurbishment $18,750FY23
27-Mar-20 Ohio-Hamilton County Page8
EXECUTIVE SUMMARY TRANSIT OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
112059 SORTA 2024 Operating Hamilton County Operating $77,704,288FY24
112060 SORTA 2024 Preventive Maintenance Hamilton County Preventative Maintenance $13,030,621FY24
112061 SORTA 2024 Preventive Maintenance UTP
Hamilton County Preventative Maintenance $1,282,635FY24
112064 SORTA 2024 ADA Hamilton County Paratransit Service $1,281,709FY24
112066 SORTA 2022 Bus Replacements FFT Hamilton County Bus Replacements $2,600,000FY22
112067 SORTA 2024 Bus Replacements Hamilton County Bus Replacements $4,500,000FY24
112068 SORTA 2022 Security Equipment Hamilton County Security Equipment $165,000FY22
112069 SORTA 2022 Bus Replacements 5339Hamilton County Bus Replacements $928,000FY22
112070 SORTA 2022 Bus Replacements 5339Hamilton County Bus Replacements $1,481,200FY22
112071 SORTA 2022 Bus Replacements 5339Hamilton County Bus Replacements $5,000,000FY22
112072 SORTA 2024 Operating Hamilton County Operating $1,720,000FY23
112073 SORTA 2022 Facility Preventive Maintenance
Hamilton County Govt. Square Transit Center Refurbishment $18,750FY22
112074 SORTA 2023 Operating Assistance Hamilton County Operating $77,704,288FY23
112075 SORTA 2023 Preventive Maintenance Hamilton County Preventative Maintenance $13,030,621FY23
112076 SORTA 2024 Bus Replacements FFT Hamilton County Bus Replacements $2,600,000FY24
112077 SORTA 2023 Preventive Maintenance UTP
Hamilton County Preventative Maintenance $1,282,635FY23
112078 SORTA 2024 Security Equipment Hamilton County Security Equipment $165,000FY24
112079 SORTA 2023 ADA Paratransit Service Hamilton County Access Paratransit Service $1,281,709FY23
112080 SORTA 2024 Bus Replacements Hamilton County Bus Replacements $928,000FY24
112083 SORTA 2023 Bus Replacements OTP Hamilton County Bus Replacements - 40 ft. bus $4,500,000FY23
112084 SORTA 2024 Bus Replacements Hamilton County Bus Replacements - Paratransit $1,481,200FY24
112086 SORTA 2024 Bus Replacements Hamilton County Bus Replacements - 40 foot bus $5,000,000FY24
112089 SORTA 2024 Facility Preventive Maintenance
Hamilton County Govt. Square Transit Center Refurbishment $18,750FY24
112090 SORTA 2021 Bus Replacements LNTPHamilton County Bus Replacements $17,600,000FY21
112091 SORTA 2021 Bus Facility Expansion Hamilton County Facility Expansion $45,000,000FY21
112093 SORTA 2022 Bus Replacements LNTPHamilton County Bus Replacements $20,900,000FY22
112094 SORTA 2023 Bus Replacements LNTPHamilton County Bus Replacements $11,000,000FY23
112095 SORTA 2024 BRT Routes Hamilton County Bus Rapid Transit Routes $162,000,000FY24
112097 SORTA 2021 Bus Replacements Hamilton County Bus Replacements $4,500,000FY21
112098 SORTA 2021 Bus Replacements FFT Hamilton County Bus Replacements $5,260,000FY21
112100 SORTA 2021 Bus Replacements FFT Hamilton County Bus Replacements $2,600,000FY21
112102 SORTA 2021 Bus Replacements 5339Hamilton County Bus Replacements $928,000FY21
112103 SORTA 2021 Bus Replacements 5339Hamilton County Bus Replacements $1,478,880FY21
112104 SORTA 2021 Bus Replacements 5339Hamilton County Bus Replacements $5,000,000FY21
112105 SORTA 2021 Facility Prev. Maint. Hamilton County Preventative Maintenance $18,750FY21
112320 SORTA 2020 Bus Replacement DERG Hamilton County Bus Replacements $2,162,888FY20
NP-CMAQ5
SORTA SMART Bus Replacement Hamilton County Replacement of 15 10' buses with clean diesel technology buses
$8,363,850FY24
27-Mar-20 Ohio-Hamilton County Page9
EXECUTIVE SUMMARY TRANSIT OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
Transit Authority of Northern KentuckyProject Name Location DescriptionTIP ID
Total Programmed
CostsYear201922 Boone, Campbell and Kenton Bus Replacement - Electric Hybrid $2,750,580FY20
202001 Boone, Campbell and Kenton 40' Diesel buses $500,000FY20
202002 Boone, Campbell and Kenton <30' Diesel buses (Shuttle) $630,000FY20
202003 Boone, Campbell and Kenton <30' Diesel buses (RAMP) $110,514FY20
202004 Boone, Campbell and Kenton Associated Capital Vehicle Equipment $125,000FY20
202005 Boone, Campbell and Kenton Supervisor vehicle $27,000FY20
202006 Boone, Campbell and Kenton 40' Diesel buses $1,275,000FY20
202010 Boone, Campbell and Kenton Planning Projects $170,000FY20
202011 Boone, Campbell and Kenton Preventive Maintenance $2,200,000FY20
202012 Boone, Campbell and Kenton Transit enhancements $100,000FY20
202013 Boone, Campbell and Kenton Shop Equipment $30,000FY20
202014 Boone, Campbell and Kenton IT Hardware $150,000FY20
202016 Boone, Campbell and Kenton Security Improvements $60,000FY20
202017 Boone, Campbell and Kenton Bldg. and Facility Equipment $40,000FY20
202018 Boone, Campbell and Kenton Renovate Admin. Facility $600,000FY20
202019 Boone, Campbell and Kenton Employee education/training $20,000FY20
202020 Boone, Campbell and Kenton Operating $5,028,108FY20
202021 TANK Bus Replacements Boone, Campbell and Kenton Replacement of 4 diesel buses with hybrid-electric buses
$2,487,720FY20
202022 Boone, Campbell and Kenton IT Software $150,000FY20
202023 Boone, Campbell and Kenton Support Vehicle Lease $40,000FY20
202101 TANK FY21 Bus Purchase Boone, Campbell and Kenton 40' Diesel buses $800,000FY21
202102 TANK FY21 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (Shuttle) $630,000FY21
202103 TANK FY21 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (RAMP) $355,140FY21
202104 FY21 Associated Capital Vehicle Equipment
Boone, Campbell and Kenton Associated Capital Vehicle Equipment $100,000FY21
202105 FY21 Supervisor vehicle Boone, Campbell and Kenton Supervisor vehicle $27,000FY21
202110 FY21 Planning Projects Boone, Campbell and Kenton Planning Projects $170,000FY21
202111 FY21 Preventive Maintenance Boone, Campbell and Kenton Preventive Maintenance $1,280,130FY21
202112 FY21 Transit enhancements Boone, Campbell and Kenton Transit enhancements $100,000FY21
202113 FY21 Shop Equipment Boone, Campbell and Kenton Shop Equipment $30,000FY21
202114 FY21 IT Hardware Boone, Campbell and Kenton IT Hardware $50,000FY21
202116 FY21 Security Improvements Boone, Campbell and Kenton Security Improvements $50,000FY21
202117 FY21 Bldg. and Facility Equipment Boone, Campbell and Kenton Bldg. and Facility Equipment $50,000FY21
202118 FY21 Renovate Admin. Facility Boone, Campbell and Kenton Renovate Admin. Facility $50,000FY21
202119 FY21 mployee education/training Boone, Campbell and Kenton Employee education/training $20,000FY21
202120 FY21 Operating Boone, Campbell and Kenton Operating $5,028,108FY21
202121 TANK Senior Program Operating Boone, Campbell and Kenton Northern Kentucky Senior Transportation Program
$180,000FY21
202201 TANK FY22 Bus Purchase Boone, Campbell and Kenton 40' Diesel buses $800,000FY22
27-Mar-20 Kentucky-Kenton County Page10
EXECUTIVE SUMMARY TRANSIT OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
202202 TANK FY22 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (Shuttle) $630,000FY22
202203 TANK FY22 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (RAMP) $355,140FY22
202204 FY22 Associated Capital Vehicle Equipment
Boone, Campbell and Kenton Associated Capital Vehicle Equipment $100,000FY22
202205 FY22 Supervisor vehicle Boone, Campbell and Kenton Supervisor vehicle $27,000FY22
202210 FY22 Planning Projects Boone, Campbell and Kenton Planning Projects $170,000FY22
202211 FY22 Preventive Maintenance Boone, Campbell and Kenton Preventive Maintenance $1,280,130FY22
202212 FY22 Transit enhancements Boone, Campbell and Kenton Transit enhancements $100,000FY22
202213 FY22 Shop Equipment Boone, Campbell and Kenton Shop Equipment $30,000FY22
202214 FY22 IT Hardware Boone, Campbell and Kenton IT Hardware $50,000FY22
202216 FY22 Security Improvements Boone, Campbell and Kenton Security Improvements $50,000FY22
202217 FY22 Bldg. and Facility Equipment Boone, Campbell and Kenton Bldg. and Facility Equipment $50,000FY22
202218 FY22 Renovate Admin. Facility Boone, Campbell and Kenton Renovate Admin. Facility $50,000FY22
202219 FY22 Employee education/training Boone, Campbell and Kenton Employee education/training $20,000FY22
202220 FY22 Operating Boone, Campbell and Kenton Operating $5,028,108FY22
202301 TANK FY23 Bus Purchase Boone, Campbell and Kenton 40' Diesel buses $800,000FY23
202302 TANK FY23 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (Shuttle) $630,000FY23
202303 TANK FY23 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (RAMP) $355,140FY23
202304 FY23 Associated Capital Vehicle Equipment
Boone, Campbell and Kenton Associated Capital Vehicle Equipment $100,000FY23
202305 FY23 Supervisor vehicle Boone, Campbell and Kenton Supervisor vehicle $27,000FY23
202310 FY23 Planning Projects Boone, Campbell and Kenton Planning Projects $170,000FY23
202311 FY23 Preventive Maintenance Boone, Campbell and Kenton Preventive Maintenance $1,280,130FY23
202312 FY23 Transit enhancements Boone, Campbell and Kenton Transit enhancements $100,000FY23
202313 FY23 Shop Equipment Boone, Campbell and Kenton Shop Equipment $30,000FY23
202314 FY23 IT Hardware Boone, Campbell and Kenton IT Hardware $50,000FY23
202316 FY23 Security Improvements Boone, Campbell and Kenton Security Improvements $50,000FY23
202317 FY23 Bldg. and Facility Equipment Boone, Campbell and Kenton Bldg. and Facility Equipment $50,000FY23
202318 FY23 Renovate Admin. Facility Boone, Campbell and Kenton Renovate Admin. Facility $50,000FY23
202319 FY23 Employee education/training Boone, Campbell and Kenton Employee education/training $20,000FY23
202320 FY23 Operating Boone, Campbell and Kenton Operating $5,028,108FY23
202322 TANK FY23 Bus Replacements Boone, Campbell and Kenton Replacement of five full-size fixed route buses
$2,231,930FY23
202401 TANK FY24 Bus Purchase Boone, Campbell and Kenton 40' Diesel buses $800,000FY24
202402 TANK FY24 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (Shuttle) $630,000FY24
202403 TANK FY24 Bus Purchase Boone, Campbell and Kenton <30' Diesel buses (RAMP) $355,140FY24
202404 FY24 Associated Capital Vehicle Equipment
Boone, Campbell and Kenton Associated Capital Vehicle Equipment $100,000FY24
202405 FY24 Supervisor vehicle Boone, Campbell and Kenton Supervisor vehicle $27,000FY24
202410 FY24 Planning Projects Boone, Campbell and Kenton Planning Projects $170,000FY24
202411 FY24 Preventive Maintenance Boone, Campbell and Kenton Preventive Maintenance $1,280,130FY24
202412 FY24 Transit enhancements Boone, Campbell and Kenton Transit enhancements $100,000FY24
27-Mar-20 Kentucky-Kenton County Page11
EXECUTIVE SUMMARY TRANSIT OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM
202413 FY24 Shop Equipment Boone, Campbell and Kenton Shop Equipment $30,000FY24
202414 FY24 IT Hardware Boone, Campbell and Kenton IT Hardware $50,000FY24
202416 FY24 Security Improvements Boone, Campbell and Kenton Security Improvements $50,000FY24
202417 FY24 Bldg. and Facility Equipment Boone, Campbell and Kenton Bldg. and Facility Equipment $50,000FY24
202418 FY24 Renovate Admin. Facility Boone, Campbell and Kenton Renovate Admin. Facility $50,000FY24
202419 FY24 Employee education/training Boone, Campbell and Kenton Employee education/training $20,000FY24
202420 FY24 Operating Boone, Campbell and Kenton Operating $5,028,108FY24
Warren County Transit ServiceProject Name Location DescriptionTIP ID
Total Programmed
CostsYear104485 WCTS 2021 5307 Program Warren County Operating Assistance up to 50% Federal
Share$1,142,216FY21
111788 WCTS 2022 5307 Program Warren County Operating assistance, vehicle replacement, and preventive maintenance
$147,915FY22
111789 WCTS 2023 5307 Program Warren County Operating assistance, vehicle replacement, and preventive maintenance
$147,915FY23
111793 WCTS 2024 5307 Program Warren County Operating assistance, vehicle replacement, and preventive maintenance
$147,915FY24
99347 Capitalized Maintenance Warren County WCTS Captalized Maintenance $170,938
27-Mar-20 Ohio-Warren County Page12
Recommended