CAMP DAISY HINDMAN�nal proposal: master plankansas state university [2011]
BACK ENTRYservice road, horse entry, second exit
RIDING AREAovergrown outdoor horse riding area
no connection to rest of site1,000 ft from closest part of camp
DISCONNECT
UNUSED ARENAnewest building on camp and best sited in relation to drainage, not used at all
ABANDONED STABLESfully functional horse
stables left empty
SHEDstorage for North end of camp
extremely visible to campers
SEWAGE PONDS
COMMUNITY$40,000 savings by using exist-ing cladding on arena structure
moves program to location closer to entry
activates unused facility
already enclosed structure makes for easy phasing and construc-
tion void of water damage
rentable flex space provides opportunity for profit
indoor troop housing and rec space provide girls with year
round activity flexibility STABLE/STORM SHELTERgoats, chickens, horses and llama in stable area to help promote hands on science activities.
stables double as storm shelter and utility area
boardwalks connect entirety of site North to South
CONNECTED
NEW ENTRYback road creates layer of security
and more scenic approach
PARKINGlot can accommo-date 4 busses [approx 192 girls]
parking for staff and visitor cars
RETENTION added vegetation for filtration and aesthetic benefits
ADMIN/RESIDENTIALhouses administration facilities [offices, conference, infirmary]
ranger house, garage and storage
$24, 593.402”
corrugated metal roofing and siding
$153.73/panel [panel=72.75 sq ft]11, 370 sq. ft. of cladding
=+
ARENA FIRST FLOOR PLAN:
garage
flexspace
office
conference
multipurpose space
infirmarybathrooms
bathrooms
animal shelters
mechanical
maintenance shed
storm shelters
master bed
bath
guest
guest
bath
living
kitchen
troop leader
girl scout lodging
girl scout lodging
troop leader
flexspace
O 5 10 15
garage
flexspace
office
conference
multipurpose space
infirmarybathrooms
bathrooms
animal shelters
mechanical
maintenance shed
storm shelters
master bed
bath
guest
guest
bath
living
kitchen
troop leader
girl scout lodging
girl scout lodging
troop leader
flexspace
ARENA SECOND FLOOR PLAN:O 5 10 15
5 10 20 40 80
ARENA SECTION 1:O 5 10 15
5 10 20 40 80
ARENA SECTION 2:O 5 10 15
5 10 20 40 80
STABLE PLAN:
O 5 10 15
storm shelter mechanical
animal shelters
Exsisting Southern Elevation1/8”=1’-0”
Proposed Southern Elevation1/8”=1’-0”
STABLE SOUTHERN ELEVATIONS:
proposed/existing
proposed
O 5 10 15
exsisting
proposed
STABLE WESTERN ELEVATIONS:O 5 10 15
proposed/existing
exsisting
Section A-A1/8”=1’0”
Section A-A1/8”=1’0”
STABLE SECTION:
O 5 10 15
pool starting to wash away because of drain-age, not efficient
LEAKING POOL
siting of buildings has caused foundational problems
used structures on property decaying daily
no division between administra-tion area and girls area
BUILDINGS IN DISREPAIR
UNUSABLE LAKElake filled with sediment from surrounding hills
dam is failing and unsafe
dredging costs $150,000 every 20-30 years
no large place for girls to gather around lake, which is most central part of camp
no area for girls to shower or use rest room in center area of camp
LACK OF CENTRAL REST ROOMS
DISCONNECT BETWEEN CAMPScamp sites feel like individual areas instead of communicating as parts of a unit
$
NATURAL POOL
DINING/AMPHITHEATER/SPRAY PARK
BOARDWALKS
CAMP CENTER
pool connected with creek bed in natural state
education of plant �ltration
large open grass field
central congregation/activity area
material: metal grate sup-ported by concrete pillars
unique connection between camps and site
pavillion-like dining hall that opens to amphitheater and camp center
spray park on top of existing pool with some mechanical equip. in hole from pool
facilitating connection between dining and field, uniting the Îcamp centerÌ
END OF ZIP LINEgirls end in central hub of camp
REST ROOMS/SHOWERSlocated mid way between camps
with composting toilets and solar hot water heated showers
NEW PROPERTY LINEsell off area of camp with the most differed
maintenance costs and only area with frontage on main road
50 10 15
$
DINING HALL PLAN:
-new location of dining hallO 5 10 15
KITCHEN
DINING
REST ROOMS/SHOWERS
SPRAY PARK
50 10 15
DINING HALL SECTION 1:
-looking through dining hall at kitchen serving wall-cut through amphitheater that opens up to field
O 5 10 15
50 10 15
DINING HALL SECTION 2:
-cutting through full building and spray park looking at hill behind built structure
O 5 10 15
50 10 15
50 10 15
50 10 15
DINING HALL PHASE 1:
-slab and beginning instillations of spray park-showers, bathrooms and storage [beginnings of dining hall structure]-start site work in the area
O 5 10 15
50 10 15
50 10 15
DINING HALL PHASE 2:
-slab for rest of dining hall to be built on later-amphitheatre put in place, slab for dining hall can be used for stage/gathering area in mean time
O 5 10 15
50 10 15
50 10 15
DINING HALL PHASE 3:
-add on to bathroom and shower structure with dining hall and kitchen area-appliances can always be added at later time
O 5 10 15
CAMP DAISY HINDMAN�nal proposal: master planandres alfaro, luke brohmer, katie hawkes, audrey knight, adam rielly
Recommended