FINAL FORUM of the Project through pREvention to Preserve the natural beauty Of the Rhodope mounTain REPORT Smolyan, (2 nd part) - RESULTS According to requirements of the Manual for information and publicity, within the first 6 (six) months after the beginning of the project should be created website. Complying with this requirement on was launched the information website of the project REPORT: RESULTS EQUIPPED CENTERS IN SMOLYAN AND XANTHI RESULTS CENTERS (Smolyan ) RESULTS CENTERS (Xanthi) RESULTS EQUIPPED FIREFIGHTING DEPOTS IN SMOLYAN AND XANTHI ALL-TERRAIN VEHICLES (Smolyan) RESULTS VEHICLES (Xanthi) OFFICIAL HANDING THE VEHICLES BY THE MINSTER OF INTERIOR TSVETAN TSVETANOV - Bulgaria square, RESULTS EQUIPPED FIREFIGHTING DEPOTS IN SMOLYAN AND XANTHI FIREFIGHTING EQUIPMENT (Smolyan) RESULTS FIREFIGHTING EQUIPMENT (Xanthi)