DESCRIPTION
Pile Construction
Citation preview
Field change request
Zenitaka-Hyundai JV Design Office
Request Nr. 13
Location Batching plant (Sand bin separator)
Date 05-11-2014
Ref. Drawings ZHJV-W-I-SI-0034-1
Applicant Zenitaka-Hyundai JV
Sketch
SEE ATTACHED SKETCH
Request reason:
- Side cover for sand bin - Drainage provision for sand bin roof
Description of the change:
- The sides are to be covered with 32 gauge iron sheets to increase protection of sand stock
from heavy rain. This has been considered because the height of the structure (8m) will allow rainfall in, from the sides.
- The roof edges need drainage to avoid runoff pouring into the adjacent bin and stagnating between the sand bins and the retaining walls.
Contractor Representative
Consultant Representative
Engineer
Recommended