In 2013, JTT was contracted to handle all the
refractory work in a major FCCU/SRU revamp
replacement. This included pre turnaround shop
and field work as well as the actual turnaround
work. The work included demolition and
installation in the Reactor, Regenerator, Fractionator
Tower, SRU Reaction Furnace, related furnace
work, and various large bore ducting.
There was a large scope of refractory
installation for the retrofit and a very large
quantity of discovery work as well. JTT also
performed all the refractory work on a new
related CO Boiler, associated ducts and a Seal
Pot. Concurrently, there were thousands of
square feet of fireproofing that had to be
installed to facilitate the retrofit.
FCCU/SRU RETROFIT TURNAROUND
Concurrently, there were thousands of square feet of fireproofing that had
to be installed to facilitate the retrofit. The work involved being inside
extremely tight bore piping and small cyclones so JTT had to qualify and
supply the appropriate craftsmen with the right skills.
The type of work included form/pour casting, gunite, ramming hand packing, brickwork, and ceramic fiber installation. JTT was required to
coordinate all these competing areas of work with the qualified personnel in order to complete the work while not disrupting other
contractors on site. JTT completed this work to the customer’s satisfaction without an OSHA Recordable injury.