FAIR LAWN BOARD OF EDUCATION

BUILDINGS & GROUNDS

ACCOMPLISHMENTS

SASSO FIELDNew Turf Field Installed

Sasso Field Painted buildings & new tent

Sasso Field Lightning Detector

SASSO FIELD

• New cameras Installed• Sealed blacktop under bleachers

High School A-gym Floor Refinished

FAIR LAWN HIGH SCHOOL

B-WING CAFETERIA

ROOF

HIGH SCHOOL

• Abated 3 classrooms (Rms B120, B122, B204)• Painted 5 classrooms• Retiled A-wing girls’ bathroom• HS Stage Lighting• HS Lighting (pending)• Auditorium underground conduit, carpeted

aisles

Memorial – Completed installation of windows on west side of building

Memorial SchoolPainted lockers on 1st and 2nd floor

MEMORIAL SCHOOL – Trimmed trees back from field

Memorial SchoolTrimmed trees back from steps

MEMORIAL SCHOOL

• Installed new energy efficient LED lights in auditorium

• Rm 214 – converted from storeroom to classroom instruction

• Auditorium – rebuilt exhaust fan• Repaired terrazzo floor outside main office

THOMAS JEFFERSON SCHOOL

Repaved & striped front lotWidened exit driveway to allow right & left turns upon exiting

THOMAS JEFFERSON SCHOOL

• Painted lockers and installed new lockers on 1st floor

• Carpeted 5 offices in Child Study Team room• Boys’ locker bathroom and boys’ room by Rm 119

– installed new floor drains & waterless urinals• Installed wireless clock system• Rm 116 – abated floor and installed VCT tile

EDISON SCHOOL

Moved sign from HS and installed at

Edison

EDISON SCHOOL

• Paving of front lot and re-striping for bus access (pending)

• Repaired windows

FORREST SCHOOL

• Installed VCT tile in 4 classrooms• Moved KECO from Forrest to Edison School

Lyncrest School Canopy, Ceiling & LED lights

MILNES SCHOOLRefurbished 2 storm drains in rear parking lot and repaved.

INSTALLED CHAIRLIFT

AT

MILNES SCHOOL

Radburn School

Kindergarten WindowsInstalled new

energy efficient thermopane

windows

RADBURN SCHOOL

• Converted music room to new kindergarten room on ground floor

• Installed new security gate on ground floor by new addition lobby

• Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals

Warren Point SchoolInstalled new digital sign on

Broadway

Warren Point SchoolMilled and repaved teacher parking lot and installed new security

gates

Warren Point SchoolInstalled 100 cubic yards of mulch on playground

Warren Point SchoolInstalled new Fire Doors in old wing-1st floor

Westmoreland SchoolInstalled energy efficient thermopane windows in gym

WESTMORELAND SCHOOL

• Replacement of bathroom partitions (pending)

DISTRICT

• Installed security locks in all school buildings• Room numbers stenciled on exterior windows

in all school buildings• Purchased maintenance truck• Purchase of leaf vacuum (pending)• Purchase of salt spreader (pending)