Facility Plan-Timber Layout
Presented by:-Bhavnesh Agale-1405005
Pritesh Chitte-1405007
Sanket Sable-1405016
Mahesh Kumar-1405024
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 2/24
Problem Definition
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 3/24
Project Aim Set up a centralized Depot
Design a facility layout
Determine equipment availability
Project Scope Ensure understanding the BedRock’s current project environment
Knowledge of project environment
Observations and data gathering of various depots and analyzing these data
Determine best methodology and use it to develop facility plan
Conclusion gained from the project problem
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 4/24
Problem Objective
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 5/24
Primary and support activities
Primary Activities
Scanner Operations
Pecilling Operations
Chipper Operations
Bundling Operation
Buffer Operation
Support activities
Guard House
Parking
Offices
Workshops
Change Rooms
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 6/24
Bleskop Service Center Current Layout
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 7/24
From to chart
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 8/24
Activity Relationship Chart
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 9/24
Activity Relationship Chart
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 10/24
Space Requirement
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 11/24
Relationship Diagram
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 12/24
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 13/24
Departments in Block Layout
Department 1 Guard House Department 7 Scanner Department 2 Parking Department 8 Sorted stock pile
Department 3 Offices Department 9 Pencilling operation
Department 4 Workshop Department 10 Chipper operation
Department 5 Change rooms Department 11 Bundling operation
Department 6 Off loading store pile Department 12 Buffer
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 14/24
Block Layout 1
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 15/24
Block Layout 2
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 16/24
Block Layout 3
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 17/24
Process Flows
Flow of Employee Employee Type 1: Assign to the offices
Employee Type2: Assign to the Yard
Flow of Timber
Flow of Truck Type 1 : Flow of incoming Trucks
Type 2: Floe of outgoing Trucks
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 18/24
Flow of Employees
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 19/24
Flow of Timber
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 20/24
Flow of Trucks
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 21/24
Material Handling
In the block layouts three areas have been demarcated for
material handling, where they will be performing certain
functions and those functions alone. The demarcated
areas will mainly cover the areas that will experience the
most frequent movement by handling equipment on a day
to day basis. The distances covered by handlingequipment within these demarcated areas will be
analyzed and taking in consideration during the evaluation
process
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 22/24
Material Handling
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 23/24
Evaluation and Analysis
8/10/2019 Facility Plan-Timber Layout
http://slidepdf.com/reader/full/facility-plan-timber-layout 24/24
Conclusion
The physical site that is required to house a Centralised Depot in the
eMakhazeni area will be of the size 20262 Square Meter
The proposed facility layout that is recommended to be implemented or used
as a benchmark will be block layout 2 as this was determined the most
feasible design by the weighted factor comparison method
Recommended