Facilities Master Plan We Are •Assess Existing Facilities & 1989 Facilities Master Plan...

Preview:

Citation preview

Facilities Master Plan

Carrier JohnsonJanuary 28, 2005

SAN DIEGO COLLEGE

1

Today’s Agenda

•Existing Conditions

•Guiding Principles

•Needs & Vision

Present:Facilities Master PlanandStrategy for PhasedImplementation

•Master Plan

•Implementation Strategy

•Next Steps

2

Design Team Task

•Incorporate Guiding Principles for Individual Programs & City CollegeCampus

•Evaluate & Identify Land Acquisition to Augment Growth

•Develop Strategy of Phased Implementation forNew Construction

Develop a Facilities Master PlanandStrategy for PhasedImplementation

3

Where We Are•Assess Existing Facilities & 1989Facilities Master Plan

•Faculty / Staff CommitteeSessions

•Establish Program Needs & Guiding Principles

•Develop Initial Facilities Master Plan Study

•Refine Facilities Master Plan

•Document Strategyfor Growth & Alteration

•Publish Final Facilities MasterPlan Document

•Approve UpdatedFacilities Master Plan

FinalDocumentationof Guiding Principles and Assessment Data &Development of the Facilities Master Plan

4

Existing Campus Conditions

5

ExistingCampus

•Infrastructure, Facilities & Accessibility Needs

•Growth Needs

•Limited Parking

•B Street Throughway

•Park Boulevard Frontage

•Connection to Downtown

•Mature Landscape

•Campus Identification

•Topography

C Street

Broadway

B Street

A Street

Par

k B

lvd

16th

Str

eet

6

Assessment ofExisting Conditions

•Design Team Assessmentof Construction, Systemsand Accessibility

•City College CommitteeAssessment, Recommendationsand Guiding Principles

PFH

H

P2

P1

P3

Centre City

E

I

B

M

D AT J

L

CR S

F2

F

Russ Blvd.

B Street

C Street

16th

Stre

et

Par

k B

lvd.

legendbuildings functioning wellbuildings requiring remodel/retrofit/reprogrammingbuildings to be evaluated for best use

Overflow Parking

7

Facilities Master PlanGuiding Principles

8

•Maintain a Collaborative Process•College Community & City

Agency Input

•Incorporate All Anticipated & Future Projects

•Project Design•Cluster Related Programs•Peripheral Parking•State-of-the-Art technology•Building Flexibility•Incorporate Sustainable Technology

•Campus Accessibility & Safety•Way-finding & Convenience•Sufficient & Convenient Parking•Identity & Community Outreach•Campus Pedestrian Circulation •Pedestrian & Vehicular Access Identity

•Embrace & Enhance a Collegial Environment

•“Unified Campus”•Attractive, Diverse Outdoor

Spaces•Welcoming Campus Gateways•Symbolic Presence & Strong Identity

•Link Campus Areas•“Bridge City Streets”

•Strategize Growth & Phasing•Minimize Construction Impacts•Avoid Instructional Space Loss

During Construction•Cluster Programs•Consider Long Term Growth

9

Identify Program Need

10

•Major Renovation•C Building Renovation•L Building Renovation•A Building Renovation•M Building Renovation•P Building Upgrade•Athletic Fields Renovation•T Building Upgrade•Seismic Upgrades

•Infrastructure•Technology Systems Access•TV Studio & Theatre Systems & Lighting•HVAC & Laboratory Exhaust Systems Upgrades

•Minor Renovation•Student Center Upgrade•Disability Access Upgrades•Classroom/Service Area Reconfiguration•Restroom Upgrades•Renovations Due to Damage & Use

Remodel & Renovation ProjectsProposition “S” & Non Proposition “S” Funded

11

•Proposition ‘S’ Funded Projects•Engineering Technology Building•Humanities Center•Business Technology Building•Vocational Technology Center•Structured Parking and Access•Instructional Visual Arts Center•Child Development Center

•Non Proposition ‘S’ Funded Projects•Fitness and Swimming Complex•Student Center•Pedestrian Walkways

New Construction Projects

12

•City College Project Subcommittee•Building & Program Reports•Guiding Principles

Establish Campus Vision

13

•Community Engagement

•Gateway Marquee Signage•“A” Street Front Door-Welcome•Park Boulevard Greenbelt•“B” Street Image•“C” Street Walkway•Russ Street •Campus Access Signage•Freeway Image

Campus Image•Campus Environment

•Major Gathering Places•Secondary Courtyards andGardens

•Landscape •Pedestrian Pathways•Lighting & Signage•Safety and Accessibility•Architectural Character

14

Campus Master PlanBalancing Program with Vision

15

South Area

Satellite Area

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

•Expansion & GrowthStrategy

Long Range Opportunity

Academic Neighborhoods

North Area

16

South Area

Satellite Area

•Acquire Land to AugmentExpansion & GrowthStrategy

Long Range Opportunity

North Area

Expansion & GrowthStrategy

17

Neighborhood Connections

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

13th

Str

eet

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

18

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

13th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

19

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

13th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

20

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

13th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

21

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

13th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

22

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

13th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

23

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

24

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

• Neighborhood Centers

• Way-finding/Accessibility

• Activate Internal &Peripheral Pathways

• Access Points &Community Connection

• Expansion & GrowthStrategy

Academic Neighborhoods

Long Range Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

25

Campus Master Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

North Area

South Area

Embrace & Enhance a Collegial Environment

•Attractive, Diverse Outdoor Spaces•Welcoming Campus Gateways•Symbolic Presence & Strong Identity

Link Campus Areas

•“Bridge City Streets”

“A Unified Campus”

26

Campus Master Plan

Future Health and Exercise Sciences Program

Gymnasium

Aquatic Complex

Baseball Field

Softball Field Soccer Field

Overhead Pedestrian Walkway

Field House

Russ Street

Park B

lvd.

163

& 5

Fre

eway

Onr

amps

North Area

27

Campus Master Plan

Administration & Parking

Student Activities Center

Educational Technology Center

Student Services Admissions/Health

Dining

Classrooms & Faculty Offices

Classroom & Faculty Offices

Future Program & Parking

Sciences Labs

Engineering Technology & Physics

Parking

Parking Structure

Parking Structure

Student Success Center

AuditoriumTheater

Classroom & Theater Services

Humanities

Classrooms & Facilities

Business Technology Center

Future Program

Future Voc. ProgramLearning

Resource Center

Vocational Technology Center

Child Development Center

Future Program & Parking

Future Program

Campus Marquee

16th

Str

eet P

edes

tria

n Pr

omen

ade

Overhead Pedestrian Walkway

Parking Structure

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

A Street

Broadway 17th

Str

eet

13th

Str

eet

Russ Street

South Area

28

Campus Master Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

North Area

South Area“A Unified Campus”

29

Campus Master Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

Parking Strategy

4,500 “on campus”Structured Spaces

Parking Structure

Parking Below Building

30

Campus Master Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

16th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

Campus Gateways & Pedestrian Access

Bus & Parking

Parking

Parking

Trolley & Bus

31

Campus Master Plan

•Campus Environment

•Pedestrian Pathways•Major Gathering Places•Secondary Courtyards

& Gardens•Landscape•Lighting & Signage•Safety and Accessibility•Architectural Character

Enhanced Crosswalk

Secondary Courtyard & Gardens

Major Gathering Space

Major Pedestrian Path

Park Boulevard Green

Campus Marquee

Campanile

32

Campus Marquee

Campus Master Plan

•Community Engagement

•Gateway Marquee Signage•Campus Access Signage•Park Boulevard Greenbelt•“A” Street Image•“B” Street Image•“C” Street Walkway•16 th Street Connection•15 th Street Image

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

B Street Portal

Campanile

Welcome Center

Park Boulevard Identity

Freeway Identity

16th

Str

eet

33

Campus Master Plan

•Campus for 25,000 students

•Academic Neighborhoods

•Parking for 4,500 vehicles

•Consideration for Topography & Landscape

•Consideration forSafety and Accessibility

•3-4 Story Campus Buildings

•Phased Growth Plan

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

34

Implementation Strategy

35

Campus Master Plan

•New Construction Projects

•Remodel & Renovation Projects

•Clustering Academic Programs

•Land Acquisition

•Infrastructure Upgrades

•PHASED SCHEDULEOF WORK

legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion

ACADEMIC NEIGHBORHOODS

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

36

Phase 1 -Remodel & Renovation•Major Renovation

•C Building Renovation•L Building Renovation•A Building Renovation•M Building Renovation•P Building Upgrade•Athletic Fields Renovation•T Building Upgrade•Seismic Upgrades

•Infrastructure•Technology Systems •TV Studio & Theatre Systems •HVAC & Laboratory Systems

•Minor Renovation•Student Center Upgrade•Disability Access Upgrades•Classroom/Service Area•Restroom Upgrades•Usage Renovations

PFH

H

P2

P1

P3

Centre City

EIB

M

D AT

J

L

CR SF2

F

legendbuildings functioning wellbuildings requiring remodel/retrofit/reprogrammingbuildings to be evaluated for best use

Overflow Parking

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

37

Phase 1 –New Construction•Proposition ‘S’ Funded Projects

•Engineering Technology Building•Humanities Center•Business Technology Building•Vocational Technology Center•Structured Parking and Access•Instructional Visual Arts Center•Child Development Center

•Non Proposition ‘S’ FundedProjects

•Classroom Building•Walkways

legendPhase 1 BuildingsExisting BuildingsRenovated / Remodel

Overflow Parking

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

38

legendPhase 1 BuildingsExisting BuildingsRenovated / Remodel

Phase 1 –

Russ Blvd.

Centre City

New Gymnasium

P1

P2

Softball Field

Soccer Field

Admin

Field House

Temporary location 1 of modulars

39

legendPhase 1 BuildingsExisting BuildingsRenovated / Remodel

Admin

Educational Tech. Center

M Classroom

Dining

Classroom/ faculty office Classroom/

Faculty Office

Engineering Technology Center Physics

Surface Parking

Parking

Surface Parking

Student Success Center

Theater

Classroom/ Theater Services

Humanities

Classroom

Business Technology Center

Learning Resource Center

Vocational Tech. Center

Child Development Center

Campus Marquee

16th

Str

eet P

edes

tria

n Pr

omen

ade

Parking

Enhanced Pedestrian Walkways

Temporary location 2 of modulars

Surface Parking

Enhanced PedestrianWalkways

Phase 1 –

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

40

Phase 2 –New Construction•Future Projects

•Student Activities Center•Administration Building•Park Boulevard Overhead Walkway•Sciences Building•Structured Parking and Access•Walkways and Gathering Spaces•Theatre•Health and Exercise Science Building•Aquatics Complex•Baseball Field•Field House

legendPhase 1 BuildingsPhase 2 BuildingsExisting Buildings

Overflow Parking

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

41

Phase 2–

Gymnasium

Aquatic Complex

Baseball Field

Softball FieldSoccer Field

Admin

Field House

legendPhase 1 BuildingsPhase 2 BuildingsExisting Buildings

Future Health and Exercise Sciences Program

Overhead Pedestrian Walkway

Russ Blvd.42

legendPhase 1 BuildingsPhase 2 BuildingsExisting Buildings

Phase 2–

16th

Str

eet P

edes

tria

n Pr

omen

ade

Admin

Educational Tech. Center

Dining

Classroom/ faculty office

Engineering Technology Center Physics

Parking

ParkingSurface Parking

Student Success Center

Theater

Classroom/ Theater Services

Humanities

Classroom

Business Technology Center

Learning Resource Center

Vocational Tech. Center

Child Development Center

Campus Marquee

ParkingScience Labs

Student Services Admissions/Health

Student Activities Center

Overhead Pedestrian Walkway

Auditorium

Subterranean Parking

Subterranean Parking

Subterranean Parking

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

43

Phase 3 –New Construction•Future Projects

•Classroom and Faculty Office Buildings•Structured Parking and Access•Walkways and Gathering Spaces•Garfield High School Building

legendPhase 1 BuildingsPhase 2 Buildings

Existing BuildingsPhase 3 Buildings

Overflow Parking

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

44

Phase 3 –

legendPhase 1 BuildingsPhase 2 Buildings

Existing BuildingsPhase 3 Buildings

Russ Blvd.

New Gymnasium

Aquatic Complex

Baseball Field

Softball FieldSoccer Field

Admin

Field House

Overhead Pedestrian Walkway

45

Future Health and Exercise Sciences Program

Phase 3 –

16th

Str

eet P

edes

tria

n Pr

omen

ade

Admin

Educational Tech. Center

Dining

Classroom/ faculty office

Engineering Technology Center Physics

Parking

Parking

Student Success Center

Theater

Classroom/ Theater Services

Humanities

Classroom

Business Technology Center

Learning Resource Center

Vocational Tech. Center

Child Development Center

Campus Marquee

ParkingScience Labs

Student Services Admissions/Health

Student Activities Center

Overhead Pedestrian Walkway

Auditorium

Subterranean Parking

Subterranean Parking

Subterranean Parking

legendPhase 1 BuildingsPhase 2 Buildings

Existing BuildingsPhase 3 Buildings

Parking

Future Parking/ Program

Future Parking/ Program

Classroom/ faculty office

Future Program

Future Program

Future Program

B Street

C Street

Park

Blv

d.

15th

Str

eet

14th

Str

eet

Russ Street

A Street

Broadway

17th

Str

eet

13th

Str

eet

16th

Str

eet

46

Where We Go From Here

Development of a Facilities Master Plan

•Faculty / Staff Workshops

•Establish Program Needs & Principles

•Develop Facilities Master Plan Options

•Review & Evaluate

•Refine & Document

•Initiate Implementation

47

SAN DIEGO COLLEGE

48

Recommended