Expo 2020 Dubai

Expo 2020 Targets

1

| 3

200+participants

| 4

25million visits

| 5

70%International

30%Domestic

| 6

Seamless Operations

| 7

Transformative Legacy

Economic Social Reputational

Innovation Culture Youth

Expo 2020 Site & Masterplan

3

| 9

Guiding Principles

• Showcase the Theme and Sub-Themes

• Catalyse and showcase Innovation

• Embrace accessibility for all

• Raise the standards for Visitor Experience

• Facilitate collaboration amongst Participants

• Maximise visibility for all Participants

| 10

Guiding Principles

• Reflect UAE Culture and Heritage

• Achieve efficiency in Participant operations

• Become a reference for Sustainability for Future

World Expos

• Implement smart site initiatives

• Prioritise health and safety in design, delivery and

operations

• Build a lasting and viable Legacy`

| 11

| 12

Arrival Modes and Distribution

60,000 peak hour visitor arrivals

Metro 13,800 per hour

EXPO Rider 80 bays

EXPO Taxi 120 bays

400 holding bays

VIP/Valet 100 bays

Parking 30,000 bays

25%

25%

25%

25%

Helicopters

| 13

Scale Comparison – Walking Distances

0 500

1000

2000

3000m

Scale Comparison - Walking Distance

DUBAI 20204.3km CONCERTINA(SINGLE LOADED)

DUBAI MALL 3.2kmBOULEVARD

28 hectares Circulation Area

46 hectares Circulation Area

MILAN 20151.6km AXIS (DOUBLE LOADED)

JBR THE WALK 1.6km AXIS

| 14

Interlocking Themes

| 15

Applied to the Master Plan

Opportunity

MobilitySustainability

Entry Gates

VIP VVIP

VIP

VVIP

VIP

VVIP

VIPVVIP

Theme Pavilions

Theme Pavilions

Al Wasl Plaza

Opportunity

Sustainability

Mobility

| 19

Opportunity PavilionBIG- Bjarke Ingels Group

| 20

Mobility PavilionFosters & Partners

| 21

Sustainability PavilionGrimshaw

Opportunity

Sustainability

Mobility

Theme Districts

Self-Build Pavilions

Service Road

UAE Pavilion

Expo Village

Park

Retail Mall

Support Buildings

Land Use Distribution

Open Spaces

Open Spaces

Al Wasl Plaza

Children’s Park

Performance Park

District Plaza

Concourse

Multi-Purpose Halls

District PlazaDistrict Plaza

Public Realm

Public Realm – Landscape Ecosystems

Public Realm – Low Water Planting Strategy

| 32

Landscape Ecosystems

© 2016 EXPO 2020

Perspectives

Welcome Plaza

District Plaza

Performance Park

Children’s Park

Concourse Shading

Access and Servicing

Visitor Entrances

Visitor entrances are from public

concourses

Servicing – Self Build Plots

Back of House access for Servicing

Servicing – District Plots

Basement servicing for District Plots

Self Build Guidelines

Arrangement and Sizing

Plot ConfigurationConcourse

Queueing Area

Back of House

Service Road

Expansion Zone

Plot Configuration

Pavilion Massing

Building Heights

Roof terrace

Concourse shading

Sustainability Themes

• Minimise energy consumption

• Optimise usage of potable water

• Encourage use of local and recycled materials

• Achieve high rates of waste segregation

• Implement a carbon emissions management programme

• Create a comfortable and enjoyable public realm

• Educate visitors through programmes of sustainability awareness

Natural Ventilation and Passive Cooling

Visitor Comfort – Open Space ShadingQueueing Area Shading

Typical Plot Sheet - 1

Typical Plot Sheet - 2

Typical Plot Sheet - 3

| 57

Timelines

| 59

Milestone Dates in the Expo 2020 Schedule

1. Expo Village – 2,100 apartments – will be ready for occupation by April 2019

2. Pavilion plot access for site investigations is by January 2018

3. Plot handover for construction – April 2018

4. Full build and fitout to be completed by September 2020

5. For Organiser built pavilions the shell and core completion is October 2019, at which time the

structures can be handed to participants for fitout.

| 60

Approvals Process

Stage 1

SubmissionTheme Statement

Stage 2

SubmissionExhibition Proposal

Concept Design

Stage 3

SubmissionExhibition Proposal

Final Design

Stage First Submission Approval

Approval for each Resubmission

Stage 1 20 days 5 days

Stage 2 20 days 5 days

Stage 3 20 days 10 days

Recommended