DECEMBER 2017
MID -2023
Q42018
Q42022
PROJECTAWARD
ADVANCEHEAVY
CONSTRUCTION
END HEAVY
CONSTRUCTIONSUBSTANTIALCOMPLETION
LEAD DESIGNERLEAD OUTREACH
DESIGN BUILD • Award Date: December 2017
• Project Budget Contained In:Approved 2015-2019 Capital Plan: $2,050M Future 2020-2024 Capital Plan: $ 538M
• Contract Type: Design-Build
1
LIRR Committee Report March 2018
FLORAL PARK
HICKSVILLE
EXPANSIONPROJECT
Widening of Floral Park Viaduct
2
Getting Ready for Bridge Reconstruction at Plainfield Ave
3
Getting Ready for Road Closure at Covert Ave Grade Crossing
4
Getting Ready for Platform Demolition at Merillon Ave Station
5
Installing SOE at Harrison Ave Garage in Mineola
6
Installing SOE at Cherry Lane Ave Bridge Abutments
7
Reconstruction of Carle Place Station
8
Constructing Urban Avenue Grade Crossing in Westbury
9
Keeping Communities Informed
10
Keeping Communities Up To date
11
https://lirrexpansion.com/http://www.amodernli.com/project/thirdtrack/
Keeping Communities Satisfied
12
Community Scorecard of Design-Builder Performance
Our Performance
• 98% of all submittals are returned within contract limits
• 9 day average submittal turnaround• Less than 2% outages cancelled by
LIRR• All invoices received since June 2018
are paid within 15 days
13
-
5
10
15
20
25
30
35
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Days
Invoice Number
Invoice Payments
30.5%
62.6%
1.9%3.5%
0.0% 1.6%2.2%
Summary Use of Contractually Available Outages
Contractual Outages Used
Contractual Outages Not Used
Outages Cancelled by 3TC
Last Minute Cancellations byLIRROutages Cancelled by LIRRAdvance NoticeOutages Not Approved
Extra Outages Provided
Recommended