Eto Achyuth

Preview:

Citation preview

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 1/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 1 of 1

Configuration Document

Document Change Control :

Release Description Created by Date Reviewed

by

Date Approved by Date

1.00 Engineer To

Order

Achyuth 01/01

 /2013

Configuration Type (Global/ process/enterprise/master) 

Process Related

DescriptionProcess : Process Id and DescriptionEnterprise : XX-ES-YY and DescriptionXX – Module code, ES  – Enterprise structure,YY – NumericMaster : XX-MA-YY and DescriptionXX – Module Code, MA  – Masters, YY  – Numeric and descriptionGlobal : XX-GB-YY and Description

CO_EO01 Engineer To Order 

Organization/Area: 

ERP Responsible:  PPFileName:

Responsibility: Regional Status:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 2/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 2 of 1

Maintain Value Categories

IMG Access path Project System > Costs > Value Categories > Maintain ValueCategories

Transaction Code: SPRO

Description: Value categories are required for Updating the projectinformation database

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Defining structure for reports for costs, revenues

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 3/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 3 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 4/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 4 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 5/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 5 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 6/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 6 of 1

Assign Cost Elements to Value Categories

IMG Access path Project System > Costs > Value Categories > Assign CostElements to Value Categories

Transaction Code: SPRO

Description: Value categories are required for Updating the projectinformation database

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether 

global )

Defining structure for reports for costs, revenues

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 7/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 7 of 1

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 8/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 8 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 9/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 9 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 10/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 10 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 11/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 11 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 12/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 12 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 13/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 13 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 14/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 14 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 15/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 15 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 16/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 16 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 17/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 17 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 18/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 18 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 19/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 19 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 20/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 20 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 21/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 21 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 22/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 22 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 23/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 23 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 24/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 24 of 1

Create User-Defined Planning Layouts for DetailedPlanning

IMG Access path Project System > Costs > Planned Costs > Manual CostPlanning in WBS > Detailed Planning > Create User-DefinedPlanning Layouts for Detailed Planning

Transaction Code: SPRO

Description: In this step, you define or change planning layouts for costelement planning and activity input planning.

Type of Configuration

(Indicate whether globalfixed or Global Reference or 

Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Cost element planning and activity input planning on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configuration

during roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 25/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 25 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 26/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 26 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 27/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 27 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 28/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 28 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 29/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 29 of 1

Maintain User-Defined Planner Profiles

IMG Access path Project System > Costs > Planned Costs > Manual CostPlanning in WBS > Detailed Planning > Maintain User-DefinedPlanner Profiles

Transaction Code: SPRO

Description: You use planner profiles to control the way planning is carriedout

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Cost element planning and activity input planning

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 30/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 30 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 31/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 31 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 32/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 32 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 33/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 33 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 34/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 34 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 35/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 35 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 36/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 36 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 37/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 37 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 38/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 38 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 39/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 39 of 1

Create/Change Planning Profile

IMG Access path Project System > Costs > Planned Costs > Manual CostPlanning in WBS > Hierarchical Cost Planning > Create/ChangePlanning Profile

Transaction Code: SPRO

Description: You need planning profiles for Hierarchy cost planning for projects

Type of Configuration

(Indicate whether global

fixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Hierarchy cost planning for projects

Naming convention: (if any)

Configuration Instructions

( Please indicate

instructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 40/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 40 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 41/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 41 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 42/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 42 of 1

Assign Planning Profile to Project Profile

IMG Access path Project System > Costs > Planned Costs > Manual CostPlanning in WBS > Hierarchical Cost Planning > Assign PlanningProfile to Project Profile

Transaction Code: SPRO

Description: In this step, you assign the planning profile to the project profile

Type of Configuration

(Indicate whether global

Global

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 43/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 43 of 1

fixed or Global Reference or Local)

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Hierarchy cost planning for projects

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 44/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 44 of 1

Define Costing Variants

Header Details

IMG Access path Project System > Costs > Planned Costs > Automatic Costing inNetworks/Activities > Costing > Define Costing Variants

Transaction Code: SPRO

Description: The costing variant contains the control parameters like:

Costing type

Valuation variant

Date control

Quantity structure control

(only relevant for cost estimates with quantity structure)

Transfer control (optional)

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Costing on Network

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 45/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 45 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 46/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 46 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 47/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 47 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 48/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 48 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 49/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 49 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 50/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 50 of 1

Define Costing Types

IMG Access path Project System > Costs > Planned Costs > Automatic Costing inNetworks/Activities > Costing > Define Costing Types

Transaction Code: SPRO

Description: In the costing type, you define the purpose of a material costestimate by specifying, for example, which field in the materialmaster record the costing results can be transferred to:

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Costing on Network

Naming convention: (if any)

Configuration Instructions No action to be taken

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 51/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 51 of 1

( Please indicateinstructions for configurationduring roll outs)

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 52/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 52 of 1

Maintain plan costing variants for network types

IMG Access path Project System > Costs > Planned Costs > Automatic Costing inNetworks/Activities > Costing > Maintain plan costing variants for network types

Transaction Code: SPRO

Description: In this step, you define the plan costing variant as the defaultvariant for the network type.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Costing on Network

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 53/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 53 of 1

Maintain Costing Variant for General Costs Activity

IMG Access path Project System > Costs > Planned Costs > Automatic Costing inNetworks/Activities > Unit Costing > Maintain Costing Variant for General Costs Activity

Transaction Code: SPRO

Description: In this activity, you maintain the costing version you require for the unit costing in general costs activities.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Costing on Network

Naming convention: (if any)

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 54/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 54 of 1

Configuration Instructions

( Please indicate

instructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 55/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 55 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 56/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 56 of 1

Maintain costing variant for material component

IMG Access path Project System > Costs > Planned Costs > Automatic Costing inNetworks/Activities > Unit Costing > Maintain costing variant for 

material component

Transaction Code: SPRO

Description: In this activity, you maintain the costing version you require for the unit costing in general costs activities.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains to

process step or whether global )

Costing on Network

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 57/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 57 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 58/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 58 of 1

Maintain Budget Profiles

IMG Access path Project System > Costs > Budget > Maintain Budget Profiles

Transaction Code: SPRO

Description: To be able to budget projects, you must create a budget profile

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Budgeting on projects

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 59/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 59 of 1

Stipulate Default Budget Profile for Project Definition

IMG Access path Project System > Costs > Budget > Stipulate Default BudgetProfile for Project Definition

Transaction Code: SPRO

Description: In this step, you assign the budget profile to the project profile.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether 

Budgeting on projects

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 60/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 60 of 1

global )

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

Define Tolerance Limits

IMG Access path Project System > Costs > Budget > Define Tolerance Limits

Transaction Code: SPRO

Description: In this step you enter the tolerance limits for availability control.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether 

Budgeting on projects

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 61/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 61 of 1

global )

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

Define Costing Sheets

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Overhead > Costing Sheets > Define CostingSheets

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 62/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 62 of 1

Transaction Code: SPRO

Description: The costing sheet integrates all elements for charging overhead.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Budgeting on projects

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 63/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 63 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 64/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 64 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 65/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 65 of 1

Define Calculation Bases Referring to Cost Element andOrigin

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Overhead > Costing Sheets > Define CalculationBases Referring to Cost Element and Origin

Transaction Code: SPRO

Description: In this section you can edit the details for costing sheetmaintenance separately for Calculation bases. The calculationbase determines to which cost elements overhead is appliedtogether.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Overhead calculation

Naming convention: (if any)

Configuration Instructions

( Please indicate

No action to be taken

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 66/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 66 of 1

instructions for configurationduring roll outs)

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 67/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 67 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 68/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 68 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 69/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 69 of 1

Define Percentage Overhead

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Overhead > Costing Sheets > Define PercentageOverhead

Transaction Code: SPRO

Description: In this section you can edit the details for costing sheet

maintenance separately for Percentage Overhead Rates. Anoverhead rate specifies the conditions under which overhead isapplied to an object.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Overhead calculation

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

Extend the same settings for a new plant

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 70/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 70 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 71/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 71 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 72/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 72 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 73/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 73 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 74/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 74 of 1

Define Credits

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Overhead > Costing Sheets > Define Credits

Transaction Code: SPRO

Description: In this section you can edit the details for costing sheetmaintenance separately for Define Credits. When you definecredits, you also specify which credit object is to be creditedunder which cost element when overhead is to be applied to anobject in the actual.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Overhead calculation

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 75/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 75 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 76/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 76 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 77/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 77 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 78/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 78 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 79/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 79 of 1

Maintain plant wise credit

IMG Access path

Transaction Code: SM30

Description: In this section you can edit the details for costing sheetmaintenance separately for Define Credits plant wise.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Overhead calculation

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

 Append entries for new plant

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 80/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 80 of 1

Define Overhead Keys

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Overhead > Define Overhead Keys

Transaction Code: SPRO

Description: In this IMG activity, you maintain overhead keys.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains to

Overhead calculation

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 81/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 81 of 1

process step or whether global )

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

Create new keys for new plant

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 82/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 82 of 1

Specify Default Costing Sheet/Overhead Key forProj.Def.

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Overhead > Specify Default CostingSheet/Overhead Key for Proj.Def.

Transaction Code: SPRO

Description: In this step, you assign the costing sheet and overhead key tothe project profile.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Overhead calculation

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

Create new keys for new plant

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 83/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 83 of 1

Create Allocation StructureIMG Access path Project System > Costs > Budget > Automatic and Periodic

 Allocations > Settlement > Settlement Profile > Create AllocationStructure

Transaction Code: SPRO

Description: During settlement, costs incurred under the primary andsecondary cost elements by a sender are allocated to one or more receivers.

Type of Configuration

(Indicate whether global

fixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Settlement of costs and revenues

Naming convention: (if any)

Configuration Instructions

( Please indicate

instructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 84/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 84 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 85/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 85 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 86/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 86 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 87/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 87 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 88/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 88 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 89/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 89 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 90/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 90 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 91/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 91 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 92/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 92 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 93/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 93 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 94/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 94 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 95/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 95 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 96/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 96 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 97/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 97 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 98/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 98 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 99/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 99 of 1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 100/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 100 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 101/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 101 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 102/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 102 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 103/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 103 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 104/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 104 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 105/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 105 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 106/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 106 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 107/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 107 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 108/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 108 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 109/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 109 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 110/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 110 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 111/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 111 of 

1

Maintain PA Transfer Structure

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Settlement > Settlement Profile > Create AllocationStructure

Transaction Code: SPRO

Description: In the PA transfer structure, you determine which cost elementgroups are assigned to which value fields in Profitability Analysis(CO-PA). You make these assignments within "assignmentlines".

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Settlement of costs and revenues

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 112/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 112 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 113/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 113 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 114/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 114 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 115/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 115 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 116/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 116 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 117/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 117 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 118/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 118 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 119/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 119 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 120/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 120 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 121/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 121 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 122/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 122 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 123/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 123 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 124/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 124 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 125/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 125 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 126/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 126 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 127/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 127 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 128/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 128 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 129/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 129 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 130/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 130 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 131/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 131 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 132/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 132 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 133/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 133 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 134/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 134 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 135/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 135 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 136/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 136 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 137/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 137 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 138/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 138 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 139/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 139 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 140/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 140 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 141/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 141 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 142/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 142 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 143/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 143 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 144/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 144 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 145/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 145 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 146/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 146 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 147/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 147 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 148/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 148 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 149/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 149 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 150/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 150 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 151/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 151 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 152/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 152 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 153/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 153 of 

1

Maintain Settlement Profiles

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Settlement > Settlement Profile > Maintain

Settlement Profiles

Transaction Code: SPRO

Description: In the settlement profile, you define a range of controlparameters for settlement. You must define the settlement profilebefore you can enter a settlement rule for a sender.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Settlement of costs and revenues

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 154/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 154 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 155/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 155 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 156/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 156 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 157/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 157 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 158/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 158 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 159/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 159 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 160/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 160 of 

1

Define Strategies for Determining Settlement Rules

IMG Access path Project System > Costs > Budget > Automatic and Periodic

 Allocations > Settlement > Define Settlement Rule for Network >Define Strategies for Determining Settlement Rules

Transaction Code: SPRO

Description: In this step you define a strategy to determine the settlement rulein the network.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Settlement of costs and revenues

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 161/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 161 of 

1

Assign Strategies and Default Rules to Network Types

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Settlement > Define Settlement Rule for Network >

 Assign Strategies and Default Rules to Network Types

Transaction Code: SPRO

Description: In this step, you assign a strategy and a default rule to thenetwork type. The assignment regulates control of thesettlement rule for activities created later in the network.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Settlement of costs and revenues

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

Extend the same settings to a new plant

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 162/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 162 of 

1

Specify Default Settlement Profiles for Networks

IMG Access path Project System > Costs > Budget > Automatic and Periodic Allocations > Settlement > Define Settlement Rule for Network >Specify Default Settlement Profiles for Networks

Transaction Code: SPRO

Description: In this step, you assign the settlement profile to the network type.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Settlement of costs and revenues

Naming convention: (if any)

Configuration Instructions

( Please indicate

No action to be taken

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 163/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 163 of 

1

instructions for configurationduring roll outs)

Client dependency:

Manual Revenue Planning

IMG Access path Project System > Revenues and Earnings > Planned Revenues> Manual Revenue Planning

Transaction Code: SPRO

Description: Value categories are required for Updating the projectinformation database

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Planning revenue

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 164/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 164 of 

1

Client dependency:

Please refer to the same step under section Costs for Manual planning

Maintain results analysis keys

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Maintain results analysis keys

Transaction Code: SPRO

Description: Here you create results analysis keys which determines if aresults analysis can be performed

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Results analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 165/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 165 of 

1

Define Results Analysis Versions

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Maintain results analysis versions

Transaction Code: SPRO

Description: All results analysis data - in results analysis is updated with

reference to the results analysis version.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 166/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 166 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 167/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 167 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 168/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 168 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 169/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 169 of 

1

Define Valuation Methods for Results Analysis

IMG Access path Project System > Revenues and Earnings > Automatic and

Periodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Define Valuation Methods for Results Analysis

Transaction Code: SPRO

Description: In this step you define a valuation method for the calculation of RA. This creates the link between the controlling area, the resultsanalysis key, the results analysis version, and the system status.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 170/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 170 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 171/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 171 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 172/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 172 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 173/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 173 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 174/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 174 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 175/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 175 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 176/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 176 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 177/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 177 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 178/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 178 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 179/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 179 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 180/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 180 of 

1

Define line IDs

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Define line IDs

Transaction Code: SPRO

Description: The line IDs group the work in process and reserves for unrealized costs

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 181/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 181 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 182/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 182 of 

1

Define assignments for results analysis

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Define assignments for results analysis

Transaction Code: SPRO

Description: Here you assign the Cost elements under which an order isdebited and credited

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 183/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 183 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 184/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 184 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 185/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 185 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 186/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 186 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 187/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 187 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 188/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 188 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 189/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 189 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 190/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 190 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 191/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 191 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 192/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 192 of 

1

RA Key 1, 5, 6 & 7

 

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 193/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 193 of 

1

Define Update for Results Analysis

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Define Update for Results Analysis

Transaction Code: SPRO

Description: For each line ID, you specify the results analysis cost elementunder which the work in process and (under somecircumstances) the reserves or unrealized costs are updated,and assign each line ID to a category.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 194/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 194 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 195/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 195 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 196/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 196 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 197/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 197 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 198/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 198 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 199/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 199 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 200/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 200 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 201/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 201 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 202/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 202 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 203/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 203 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 204/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 204 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 205/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 205 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 206/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 206 of 

1

Define Posting Rules for Settlement to Accounting

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Edit Results AnalysisKeys and Version > Define Posting Rules for Settlement to Accounting

Transaction Code: SPRO

Description: In this step you specify the G/L accounts in Financial Accountingto which the RA is settled.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 207/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 207 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 208/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 208 of 

1

Specify default results analysis keys for networks

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Results Analysis > Specify default resultsanalysis keys for networks

Transaction Code: SPRO

Description: In this step, you assign the results analysis key to the networktype.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Calculation of Results Analysis on WBS

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 209/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 209 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 210/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 210 of 

1

Assign Incoming Order Cost Element

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Incoming Orders > Assign Incoming Order Cost Element

Transaction Code: SPRO

Description: In this step, you assign original cost elements to an incomingorder cost element.

Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Incoming order evaluation on Projects

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Change Request Number inclient 110:

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 211/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 211 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 212/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 212 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 213/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 213 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 214/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 214 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 215/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 215 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 216/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 216 of 

1

Maintain settings for results analysis key

IMG Access path Project System > Revenues and Earnings > Automatic andPeriodic Allocations > Incoming Orders > Maintain settings for results analysis key

Transaction Code: SPRO

Description: In this step, you make the settings required by the results

analysis key to determine the incoming orders value.Type of Configuration

(Indicate whether globalfixed or Global Reference or Local)

Global

Process Step / Global

(Indicate whether pertains toprocess step or whether global )

Incoming order evaluation on Projects

Naming convention: (if any)

Configuration Instructions

( Please indicateinstructions for configurationduring roll outs)

No action to be taken

Client dependency:

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 217/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 217 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 218/219

 Achyuth CO

Last changed on: Last changed by: Version: Page: Enter Date and Time Page 218 of 

1

7/29/2019 Eto Achyuth

http://slidepdf.com/reader/full/eto-achyuth 219/219

 Achyuth CO