View
220
Download
0
Category
Preview:
DESCRIPTION
training
Citation preview
Prepared ByRevDate
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2.1
2.2
2.3
2.4
2.5
2.6 Exercise
Data Requirements
THN,TAT, MAY, MZQ, BRD
Harmonic Source Modeling
Harmonic Load Flow / Frequency Scan
Parameter Settings / Adjustments
Report / Alerts / Plots
1. PROTECTION DEVICES COORDINATION (5‐ Oct‐2015 to 7‐Oct ‐2015 @ 2 Hr./Day ) + 1 Hr. Practice after 6 PM
Data Requirements
ETAP ADVANCE MODULE TRAINING( COURSE CONTENTS )
SOH Approved By: THN022‐Sep‐15
Sr No.
1. PROTECTION DEVICES COORDINATION (5‐ Oct‐2015 to 7‐Oct ‐2015 @ 2 Hr./Day ) + 1 Hr. Practice after 6 PM
THN,TAT, MAY, MZQ, BRD
Prerequisites:‐ An Intermediate knowledge of Electrical Basics and Design‐ Familiarity with Windows‐based applications
Participents Modules
Protection and Selectivity Concepts
Parameter Settings / Adjustments
Display Options‐Star
Sequence of Operation Study
Study / Device Settings Reports
Exercise
Protection Equipment Library
Recommended