Erection of a L

LM 46LM 46.

PresenLoesche Gmb

Bernd preiss@lo

lwww.loes

LOESCHE Mill

2 + 2S.2 2S

nted by bH, Germany , yPreiss

oesche.dehsche.com

Pouring of mill foundation

4-Nov-11 2

Mill foundation

4-Nov-11 3

Pedestal before mounting

4-Nov-11 4

Pre-mounting of mill stand

Pedestals and bridge

4-Nov-11 5

Grouting of foundation frame

4-Nov-11 6

Lifting of mill body

4-Nov-11 7

Erected pedestals and mill body

4-Nov-11 8

Lifting of a grinding roller „M“Lifting of a grinding roller „M

4-Nov-11 9

Lifting of grinding table (part I)

4-Nov-11 10

Lifting of grinding table (part II)

4-Nov-11 11

Insertion of the grinding table

4-Nov-11 12

Bonding of the gear box baseplate wiith chockfast orange

4-Nov-11 13

Delivered mill gear box

4-Nov-11 14

Mounted gear box and gear box lubribladder accumulators

cation as well as Hydac

4-Nov-11 15

Gearbox lubrication unit

4-Nov-11 16

Pre-mounted rocker arms S-roller inccl. mill body covers

4-Nov-11 17

Mounting of rocker arm for M-roller

4-Nov-11 18

Mounting of M-roller

4-Nov-11 19

Mounted M-rollers and S-rollers

4-Nov-11 20

Rocker Arm (S-Roller)before swinging in

4-Nov-11 21

Swung in M-Roller

4-Nov-11 22

Swung in M-rollers and S-rollers

4-Nov-11 23

Pre-mounting of classifier grit funnel

4-Nov-11 24

Pre-mounting of classifier housing

4-Nov-11 25

Pre-mounted classifier housing

4-Nov-11 26

Pre-mounted classifier

4-Nov-11 27

Lifting of pre-mounted classifier

4-Nov-11 28

Insertion of pre-mounted classifier onto mill body

4-Nov-11 29

Top view to classifier rotor

4-Nov-11 30

Pre-mounting area for bag filter and sstorage area

4-Nov-11 31

Pre-mounting of bag filter

4-Nov-11 32

Pre-mouting of bag filter

4-Nov-11 33

Pre-mounted bag filter housing incl. filteer heads

4-Nov-11 34

Transportation of pre-mounted filter hoassembly placeassembly place

ousing from pre-mounting area to

4-Nov-11 35

Lifting of dust chamber of bag filter

4-Nov-11 36

Lifting of bag filter housing

4-Nov-11 37

Bag filter maintenance crane

4-Nov-11 38

LOMA heater incl. piping

4-Nov-11 39

Rotary gate for mill feeding

4-Nov-11 40

Lifting of cpl. pre-mounted second parrt of staircase tower (part I)

4-Nov-11 41

Lifting of cpl. pre-mounted second parrt of staircase tower (part II)

4-Nov-11 42

Lifting of pre-mounted silencer

4-Nov-11 43

Erection of chimney

4-Nov-11 44

Erection of mill fan

4-Nov-11 45

Erection of ducts at mill fan

4-Nov-11 46

Steel structure mill building

4-Nov-11 47

Feeding and mill building

4-Nov-11 48

Mill and filter building

4-Nov-11 49

Start of cladding works

4-Nov-11 50

Cladding of feeding and mill building

4-Nov-11 51

Connecting and ring piping of hydraulic

4-Nov-11 52

Mill stand, mill body and classifier as hot gas duct after erection workhot gas duct after erection work

well as mill crane and

4-Nov-11 53

Finished mill stand

4-Nov-11 54

Side view mill stand with mounted milaccumulators etcaccumulators etc.

l gearbox, Hydac

4-Nov-11 55