1
Project: EP-W-000122
Project Title: Pollution Prevention through Green Infrastructure Requirements in
Commercial Land Uses
Report Compiled by: James Houle,
Program Manager
The UNH Stormwater Center,
35 Colovos Road
University of New Hampshire,
Durham, NH 03824
Phone: 603-862-1445
e-mail: james.houle@unh.edu
EPA Final Report Work Plan Tasks:
1.) Development and Piloting of updated stormwater ordinances: This task has been completed. The
project team has worked with the town of Durham and the University of New Hampshire Facilities to
make them aware of the updated stormwater standards. These standards have largely been adopted.
This is important as collectively the town of Durham and UNH own the vast majority of the future
impervious cover (IC) increases over the next thirty years.
2.) Quantification of the reduction of hazardous materials, water saved and economic savings
resulting from implementation of the standards: Quantification of pollutant load reductions, water
saved and economic incentives has been completed for the Oyster River Watershed area.
Extrapolations have also been made for the greater Great Bay Watershed area to extend the
implications of the research and enhance the potential audience. These results are critical to advancing
stormwater management solutions at a watershed scale. This analysis is reported in a separate final
report format and included as an appendix.
3.) Outreach, education and training of commercial businesses and other governance entities: This
project has targeted municipalities and businesses in the Oyster River Watershed. Outreach has been
conducted with UNH Facilities and the Town of Durham in order to enhance and update current
stormwater management standards.
a.) A green business award and recognition program was developed and two entities have been
identified in the Oyster River Watershed who have demonstrated exemplary advancement of innovative
stormwater strategies. This recognition was offered to an engineering firm and a municipality each of
whom has initiated more stormwater management solutions than any other in the watershed.
1.) Bill Boulanger, Superintendent of Public Works & Utilities Community Services for Dover NH. 2.) Tighe and Bond Engineers, Portsmouth NH
2
A list of regional best management practice (BMP) installations are provided as an attachment to this report.
b.) The project has also support ongoing communication efforts associated with the Southeast
Watershed Alliance (SWA). New Hampshire legislators created SWA in 2009 to provide a framework for
watershed communities to work together to protect and restore its water resources. Two outreach
events were scheduled through SWA in the form of presentations; the first was at a Lamprey River
Watershed Workshop on May 13, 2014 and second at the SWA Quarterly Meeting Feb. 4, 2015 which
was open to the public.
In addition to these events the results of the modeling effort were presented at the 2015 NH Water &
Watershed Conference on March 19, 2015 at the Attitash Grand Summit Resort Hotel & Conference
Center in Bartlett, NH and at the 26th Annual Nonpoint Source Pollution Conference on April 28, 2015 in
Freeport, ME. Finally in cooperation with SWA a factsheet has been developed that outlines the salient
points of the project outcomes and will be finalized at the September quarterly SWA meeting.
Finally a webinar hosted by EPA Region 1 was conducted on October 1, 2015 and had 157 registered
participants.
c.) Adoption Survey of model ordinance implementation: Pre-project there were no communities that
had fully adopted the SWA standards. As of August 2015: Seven towns have either adopted or
announced plans to adopt the SWA model stormwater ordinances as a way to improve water quality
and avoid retrofit and remediation costs later: Durham, Greenland, Newfields, North Hampton,
Rochester, Rollinsford, and Stratham.
Project Deliverables:
Copies of all final project deliverables are added to this report as attachments and listed below:
1.) Attachment A: Final modeling results report
2.) Attachment B: Final educational fact sheet
3.) Attachment C: Final list of BMP installations in the Oyster River Watershed and results of the
award determination.
4.) Attachment D: Approved Quality Assurance Project Plan
Budget Expenditures:
A summary of grant expenditures are provided in the expense summary table on the next page. Total
budget expenditures for this project are complete and generally in line with projected costs in the initial
proposal. One notable exception is the commitment of $4,841.89 to additional staff time ($2,578.85
Fringe Benefits). This was offset by savings for contractual publication and graphics services anticipated
in the original proposal which were completed in-house as opposed to being hired out. As it stands the
reallocation of $7,420.74 from contractual and travel to personnel accounts for only 5.4% of the overall
budget for the project of $136,218.
3
4
Environmental results:
P2 Efforts a. Hazardous materials reduced (lbs/yr)
b. MTCO2e
Per year c. Millions of
gallons of water infiltrated per
year
d. Millions of dollars in economic savings to
businesses and municipalities ($/yr) over a
30 year implementation period
Number of Municipalities implementing updated stormwater standards
Projections assume 7*
Full Watershed Projections
assume 42**
Projections assume 7*
Full Watershed Projections
assume 42**
Projections assume 7*
Full Watershed Projections
assume 42**
Projections assume 7* Full Watershed Projections
assume 42**
Quantification of updated Stormwater standards
TSS 4,905
1.74 6.79 $455,170 TP 14.9
TN 163
Outreach and Education**
TSS 136,402 52.3 204.3 $8,000,000 TP 395.2
TN 5,984 * Project targeted and assisted with implementation in 2 communities in the Oyster River Watershed however modeled estimates were generated for all 7 municipalities in the watershed (Barrington, Dover, Durham, Lee, Madbury, Nottingham, and UNH). ** Assumes full implementation throughout the 42 Great Bay communities in NH over a 30 year implementation period
Technical Report on Modeling Results
Modeling the Effect of Local Stormw ater
Regulat ions on Future Pollutant Loads in
the Oyster River Watershed
Prepared by: University of New Hampshire
Stormwater Center
and
Vanasse Hangen Brustlin, Inc.
Bedford, New Hampshire
With Assistance from:
Strafford Regional Planning Commission
Rochester, New Hampshire
FINAL REPORT
December 16, 2015
University of New Hampshire
Stormwater Center
ii Table of Contents
Table of Contents
Executive Summary…………………………………………………………………………………………ii
1.0 Introduction .......................................................................................................................... ii
2.0 Existing Watershed Conditions ................................................................................... 3
2.1. Review of Historical Impervious Cover Growth .............................................................. 3 2.2 Historical Population Growth .......................................................................................... 3
3.0 Study Approach ................................................................................................................. 5
3.1 Future Population Growth in the Watershed .................................................................. 5 3.2 Future Impervious Cover (IC) Area Growth ................................................................... 5
3.2.1 Future Impervious Cover Growth Related to Residential Development….……6
3.2.2. Future Impervious Cover Growth Related to Commercial Development……..6 3.3. Future Pollutant Loads ................................................................................................... 8 3.4. Potential Stormwater Treatment Effects Resulting from Stormwater Regulations ......... 9
3.5 Estimated Effect on Redevelopment Projects…………………………………………….12
4.0 Results ................................................................................................................................. 13
4.1 Future Population Growth Estimates ........................................................................... 13 4.2 Future Impervious Cover Area Growth Related to Residential Development ............. 13 4.3. Futue Impervious Cover Growth Related to Commercial/Industrial Development ....... 14 4.4 Future Pollutant Loads with and without Stormwater Regulations............................... 15
4.5 Estimated Effect of Proposed Regulations on Future Redevelopment Projects………17
5.0 Discussion ............................................................................................................. 19
6.0 References .............................................................................................................. 21
University of New Hampshire
Stormwater Center
ii Executive Summary
Executive Summary
The goal of this study was to evaluate the net effect that enhanced local stormwater regulations could have on
minimizing the pollutant load increases from future development and redevelopment in the Oyster River watershed.
As future development and land use changes are inevitable, early adoption of enhanced local stormwater regulations
provides the greatest opportunity to minimize increased pollutant loading. Model stormwater regulations developed
for the Southeast Watershed Alliance (SWA) in December 2012 provide a template for enhanced stormwater
regulations that address future development and redevelopment projects (SWA 2012). The regulations would apply to
new development and redevelopment projects that are subject to site plan and/or subdivision review by the Planning
Board. This would include most commercial or mixed use development projects and residential multi-family or
subdivision projects.
The SWA model regulations advocate a “green infrastructure” for mitigating the negative effects associated with
increasing development and expanding areas of IC. The adoption of ordinances and regulations mandate the use of
stormwater filtration and infiltration practices for reducing runoff and requirements for improved stormwater controls
for reducing runoff with redevelopment or other significant improvements such as repaving or building renovations.
This report describes the methods, assumptions and findings of the modeling effort used to predict future increases in
impervious areas and pollutant loads related to the forecasted future development. The Simple Method model as
described in the NH Department of Environmental Services (NHDES) Stormwater Manual was used to predict future
pollutant load increases as a result of potential increases in impervious cover. The pollutants evaluated in this study
include total suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN). This study focused solely on
estimating the future pollutant load contributions from potential changes in impervious cover associated with
residential and commercial activity. This study did not evaluate or quantify the potential added pollutant loads
associated with septic systems and increased lawn fertilizer or other significant source of non-point source (NPS) of
pollution.
Based on the study approach, approximately 500 acres of additional impervious cover (IC) area could be developed in
the Oyster River watershed by the year 2040. This represents a 40 percent increase over the 1,290 acres of IC area
estimated to exist in the watershed based on 2010 aerial imagery. This added IC area is estimated to increase the
average annual pollutant loads for Total Suspended Solids (TSS), Total Phosphorus (TP) and Total Nitrogen (TN) by
approximately 217,700, 1,060 and 9,950 pounds, respectively, if no local stormwater regulations are adopted and no
enhanced stormwater management was provided. The level of stormwater management assumed to be required by
the local regulations could reduce the future average annual pollutant loads by approximately 40 to 70 percent
depending on the pollutant and would potentially prevent the discharge of approximately 147,145 pounds (~74 tons),
450 pounds and 4,900 pounds for TSS, TP and TN, respectively, from entering the Oyster River and Great Bay receiving
waters. This would result in substantial water quality benefits compared to having no standard or an out-date
standard. For nitrogen alone, more than half of the predicted future annual load attributed to new IC area could be
reduced by providing enhanced stormwater treatment.
Approximately 70 acres or 25 percent of the existing commercial and industrial IC area in the watershed was also
assumed to be redeveloped by 2040 and also be subject to the new regulations. If 50 percent of this redeveloped IC
area was treated it would reduce existing pollutant load contributions by 18,500, 50 and 495 pounds for TSS, TP and
TN, respectively, on an average annual basis.
University of New Hampshire
Stormwater Center
iii Executive Summary
Not only would early and widespread adoption of the proposed local regulations result in substantial pollutant load
reductions but could also result in substantial financial benefits for each community by avoiding or minimizing the
potential deferred future costs of having to retroactively implement stormwater BMP retrofits to achieve equivalent
pollutant load reductions. To retroactively treat the estimated future IC area (i.e., 386 acres) plus the estimated 70
acres of existing IC area that might be redeveloped would cost approximately $14 million in 2014 dollars using an
average retrofit cost of $30,000 per acre. These estimated future costs do not include the cost of inflation nor the
added potential cost of lost or diminished ecological services and/or recreational uses as a result of decreased water
quality conditions.
If the potential savings in deferred costs or cost avoidance gained through early adoption of stormwater regulations
and enhanced treatment were extended beyond the Oyster River watershed to include the entire Great Bay
watershed, the potential future cost savings could be in the hundreds of millions of dollars.
The findings of this analysis clearly demonstrate that adopting local stormwater regulations to require more stringent
stormwater treatment standards could have a tremendous positive impact in minimizing and preventing the additional
future pollutant loads that would be discharged in the Great Bay estuary. This would significantly alter the current
trajectory of declining water quality conditions. The results of this study provide the initial framework for establishing
pollutant load reduction credits for early adoption and maintaining strict adherence to enhanced local stormwater
regulations as it relates to future development and redevelopment activity in the watershed. This could provide an
incentive for Towns to engage early in the protection and restoration of the water quality conditions in the Great Bay
estuary and perhaps assist regulated MS4 communities in addressing increasing federal permit requirements.
University of New Hampshire
Stormwater Center
1 Introduction
1.0 Introduction
Municipalities and private landowners are likely to face a growing economic liability involved with meeting future
stormwater management and Clean Water Act obligations. As the list of impaired water bodies continues to grow,
state and federal regulators are imposing more stringent requirements on regulated communities and private
landowners in order to restore and/or meet water quality objectives. This is evident in the proposed new requirements
contained in the 2013 DRAFT MS4 Stormwater General Permit for New Hampshire where communities will be required
to adopt stricter post-construction stormwater regulations to ensure new development activity will not result in further
degradation to impaired waters as well as initiate the use of stormwater retrofit measures on municipally-owned
properties to reduce existing pollutant loads. In the NH Seacoast Region, restoring and preventing further water
quality degradation to the Great Bay Estuary and its tributaries is critically important as the Estuary represents a major
ecological and economic resource in the region and is currently listed as impaired due to declining water quality as
indicated by long-term monitoring. The decline in water quality is largely attributed to previous development and land
use changes in the watershed (NHDES 2014).
As future development and land use changes are inevitable, early adoption of enhanced local stormwater regulations
provides the greatest opportunity to minimize increased pollutant loading from future development. Model
stormwater regulations developed for the Southeast Watershed Alliance (SWA) in December 2012 provide a template
for enhanced stormwater regulations that address future development and redevelopment projects (SWA 2012). The
regulations would apply to new development and redevelopment projects that are subject to site plan and/or
subdivision review by the Planning Board. This would include most commercial or mixed use development projects and
residential multi-family or subdivision projects. Performance standards generally include runoff reduction, use of low
impact development measures and enhanced stormwater filtration and infiltration controls.
The primary goal of this study was to evaluate the net effect that enhanced local stormwater regulations could have on
minimizing future pollutant load increases in the Oyster River watershed. The Oyster River watershed is one of several
major tributaries to the Great Bay and contains portions of six towns including Barrington, Dover, Durham, Lee,
Madbury and Nottingham as well as the University of New Hampshire (UNH) Durham Campus area. This particular
watershed was selected for study because the results of a larger modeling effort recently completed for the watershed
that estimated total nitrogen loads from existing nonpoint sources allows for a comparison of baseline conditions, at
least for nitrogen, to help assess how future projected pollutant loads from impervious surfaces compare to existing
estimated loads within the watershed (VHB, 2014). The following consists of the primary goals of this study:
1) To estimate the future pollutant loading that may result from future development activity,
2) To estimate the potential load reductions that may result by adopting enhanced stormwater regulations,
3) To estimate the potential deferred costs that communities may face if local regulations are not adopted and the
same pollutant load reductions need to be achieved in the future due to either state and federal regulations
updates that require regulated communities to install retrofit measures to address increased pollutant loads.
This project was led by the UNH Stormwater Center with assistance from the Strafford Regional Planning Commission
(SRPC). This report describes the methods, assumptions and findings of the modeling effort used to predict future
increases in impervious areas and pollutant loads related to the forecasted future development. It is important to
point out that this study focused solely on future pollutant load contributions from potential changes in impervious
cover associated with future residential and commercial development activity. This study did not evaluate or quantify
University of New Hampshire
Stormwater Center
2 Introduction
the potential added pollutant loads associated with septic systems and increased lawn fertilizer or other significant
source of NPS pollution.
Although this study focused solely on the Oyster River Watershed, the results of this analysis could be extrapolated to
the entire Great Bay Estuary watershed, which is a 1,000 square mile region that includes much of southern NH and
Maine. This area is one of the fastest growing regions in northern New England. Recently, the New Hampshire
Department of Environmental Services (DES) completed a modeling effort to estimate the non-point source nitrogen
loads from each of the nine major watersheds draining to the Great Bay Estuary or the Hampton-Seabrook Estuary.
The results of this larger study allows regulators, municipal planners and other stakeholders to prioritize future efforts
to manage and control existing and future pollutant loads from nonpoint sources (NHDES 2014),
Various models and predictive tools are available that estimate increases in pollutant loads as a result of future
impervious cover changes. For this study, the Simple Method model as described in the NH Department of
Environmental Services (NHDES) Stormwater Manual was used to predict future pollutant load increases as a result of
potential increases in impervious cover. The pollutants evaluated in this study include total suspended solids (TSS),
total phosphorus (TP) and total nitrogen (TN).
Early adoption of these regulations not only affords the best advantage of limiting additional pollutant loading but also
could result in substantial cost savings for communities by minimizing the potential future costs involved with
implementing stormwater retrofit measures to treat developed areas that could be needed to comply with future
regulations or meet possible load allocations established by a future Total Maximum Daily Load (TMDL) Study. The
costs to retroactively restore water quality conditions through stormwater retrofits are generally much higher than the
initial costs of installing treatment measures at the onset of development. Use of retrofit measures to reduce pollutant
loads from existing developed areas is a critical aspect of this research approach and is already occurring in several
urbanized watersheds within the Northeast region. Key examples include the Long Creek watershed (ME), in the
Charles River Watershed (MA), in the Buzzards Bay Watershed (MA), and in the Long Island Sound Watershed (NY).
University of New Hampshire
Stormwater Center
3 Methods and Assumptions
2.0 Existing Watershed Conditions
2.1. Review of Historical Impervious Cover Growth
Table 2.1 provides a summary of the historical changes in impervious cover (IC) over the last 20 years or since 1990
based on IC estimates generated by the Piscataqua Region Estuaries Partnership (PREP) in collaboration with NH
GRANIT (UNH Complex Systems 2010). It is important to note that the historical IC data prior to 2010 was based
on lower resolution (30 meter pixel) satellite imagery. Starting in 2010, higher resolution (1-meter pixel) imagery
became available. The higher resolution aerial imagery provides a more accurate depiction of the IC area and
yields considerably different estimates of IC area than that generated from the older lower resolution data. The
lower resolution data generally produces as much 40 percent higher estimates of IC area compared to the high
resolution data. The high resolution imagery, however, is not available yet for all of southern New Hampshire.
To allow for a historical analysis of IC growth over the last 20 years, the lower resolution data was used to provide
a relative comparison of IC changes over time. Using the same analytical methods and aerial imagery resolution,
the total amount of IC area in the watershed is estimated to have increased by 1,160 acres or by approximately
123 percent from 1990 to 2010. The largest increases occurred in Durham where an estimated 537 acres of
additional IC area were created over the 20 year period followed by an additional 263 acres of IC area created in
the Town of Lee. Much of the recent IC area growth in Lee appears to be due to commercial development.
Table 2.1: Summary of Total Town Area, Town Area and Historical Changes in Impervious Area in the Watershed
Notes: Based on Piscataqua Region Estuaries Partnership data and analysis using low resolution aerial photography. UNH related
data not assessed.
2.2 Historical Population Growth
Table 2.2 provides a summary of the historical population growth within each community over the last 50 years.
The net change both in number and percentage over the past 30 years or since 1980 provides a basis to compare
future projections over the next 30 years as discussed herein. The estimated future population growth pertains
only to the portion of each community that is within the watershed. As of 2010, approximately 22,230 people or
38 percent of the total 2010 population within the six (6) communities is estimated to reside in the watershed.
Durham residents make up approximately 62 percent of the total watershed population while residents in Dover
and Lee each comprise a little more than 10 percent of the watershed population. Barrington and Madbury
residents are estimated to each make up 5 percent of the watershed population.
Town
Total Town Area
(acres)
Town Area in the
Watershed (ac)
Percent of Town Area
in the Watershed
Estimated Total IC Area (ac) Town-wide*
20-year Change in IC Area 1990-
2010 (acres) % Change 1990-2010 1990 2000 2010
Barrington 31,117 2,891 9.3% 70 102 160 90 130%
Dover 18,592 885 5.0% 95 154 221 125 131%
Durham 15,852 7,758 49.0% 523 763 1,061 537 103%
Lee 12,928 4,620 35.7% 160 266 423 263 164%
Madbury 7,779 3,173 40.8% 88 136 210 121 137%
Nottingham 30,997 316 1.0% 9 13 32 22 242%
117,265 19,643 946 1,433 2,105 1,160 123%
University of New Hampshire
Stormwater Center
4 Methods and Assumptions
Table 2.2: Historical Population Growth Statistics1 for Communities in the Oyster River Watershed: 1960 to 2010
Notes: 1Population change data compiled by the NH Office of Energy and Planning dated March 2011 and based on US Census Bureau Data. 2The population within the watershed was estimated based on a ratio of the amount of town area within the watershed area to total area for each community multiplied by the total population. Note: UNH related data not assessed independently.
Figure 2.1 illustrates the disparity between the rate of IC area growth relative to the population growth in the
watershed between 1990 and 2010. The amount of IC area in the watershed is disproportionate to population
growth; where population increased by 25 percent, IC increased over the corresponding time period by 123
percent. This could have major implications for water quality conditions within the watershed, especially if the
stormwater runoff from these IC areas is left untreated. It is interesting to note that on a town-wide basis, the
largest percentage increases in population occurred in the Towns of Barrington and Nottingham, located in the
upper headwater regions of the watershed. The continued development pressures in these Towns places greater
emphasis on the need for enhanced stormwater regulations. The Town of Lee, in contrast, had the lowest percent
increase in population growth but still had substantial gains in IC area most likely due to commercial development
in the Route 125 and Route 4 corridors. This trend also heightens the importance of local stormwater regulations
as well.
Figure 2.1: Estimated Percent Increase in Population and IC area in the Oyster River Watershed for Years 1990 to 2010.
Town 1960 1970 1980 1990 2000 2010
20-year Change
1990-2010 % Change 1990-2010
Population in
Watershed
Barrington 1,036 1,865 4,404 6,164 7,475 8,576 2,412 39% 1,651 Dover 19,131 20,850 22,377 25,042 26,884 29,987 4,945 20% 2,764
Durham 5,504 8,869 10,652 11,818 12,664 14,638 2,820 24% 13,802 Lee 931 1,481 2,111 3,729 4,145 4,330 601 16% 2,369
Madbury 556 704 987 1,404 1,509 1,771 367 26% 1,209 Nottingham 623 952 1,952 2,939 3,701 4,785 1,846 63% 437
27,158 33,769 40,531 48,157 52,677 59,302 12,991 25% 22,232
University of New Hampshire
Stormwater Center
5 Results
3.0 Study Approach
The following describes the methods, data sources, and various assumptions used to develop prediction of future
impervious cover changes and related pollutant loads. The approach involved the following four major steps:
1. Estimate the Future Population Growth within the Watershed based on Population Growth Projections
2. Estimate the Potential Increases in Impervious Cover (IC) Area due to Future Residential and Commercial
Development
3. Estimate the Potential Increase in Future Pollutant Loads Resulting from the Projected New IC Area
4. Estimate the Amount of Future IC Area that will be Subject to the Enhanced Stormwater Regulations and the
Potential Effect on Future Pollutant Loads due to Stormwater Treatment
3.1 Future Population Growth in the Watershed
Future population growth estimates for each watershed community were provided by the Strafford Regional Planning
Commission (SRPC) going out to years 2025 and 2040. These projections were originally developed for the entire state
by the NH Office of Energy and Planning in March 2011. The population growth projections were initially developed at
the County level using Census data and historical population growth trends. The County level projections were then
distributed to the individual Towns based on historic trends of the Town’s share of the County population. For this
analysis, the future population growth estimates represent 15 and 30 year projections using 2010 as the baseline. The
2010 town-wide population for each community was adjusted on an area-weighted basis to account for the portion of
the Town within the watershed and to estimate the population that resides within the Oyster River watershed.
3.2 Future Impervious Cover (IC) Area Growth
The first step to predicting future impervious cover (IC) increases lies in estimating how much residential and
commercial development is likely to occur over the next 15 and 30 years. The assumptions used to predict future
residential and commercial development activity are discussed in greater detail in the following sections. The resulting
amount of associated with the future residential and commercial development activity was based primarily on existing
IC area ratios for both the residentially and commercially zoned areas multiplied by the amount of future development
expected to occur in these zones. Recognizing that this approach does not account for all the potential socio-economic
factors that will influence future development such as land costs and accessibility along transportation corridors, this
approach relied on various conservative assumptions to estimate the future residential and commercial development.
3.2.1. Future Growth in Residential IC Area
Future increases in IC area due to residential development were estimated using future population growth estimates
within each community and the existing IC area per capita ratio calculated for each community. Table 3.1 presents a
breakdown of the total town area, the amount of town area within the watershed, the estimated 2010 population that
lives within the watershed and the estimated total IC area for residentially zoned areas in each community. The total IC
area consists of buildings, walkways, driveways and roads within the residentially-zoned areas and generally excludes
the commercial IC areas. In mixed use zones, both the commercial and residential IC area may be included, however,
this is not a common occurrence and thus was not considered to be a significant factor materially contributing to the
overall results. The total IC area is then divided by the population to derive an IC area per capita ratio. This ratio
provides the basis for projecting the future increase in IC area based on the population growth estimates. In other
University of New Hampshire
Stormwater Center
6 Results
words, the future population growth is assumed to generate the same proportional amount of IC area per person as
that that currently exists within the residential zoned areas.
Table 3.1: Summary of Town Area, Area within the Watershed, 2010 Population and 2010 IC Area in Each Community
The general locations and distribution of future residential development and IC growth was assumed to be similar to
the previous development patterns. In other words, the proportion of the future population that will reside within a
particular residential zone relative to the total population within the community will likely be similar to the existing
population that resides in that zone. In reality, it is likely that the locations and rate of future population and IC growth
may differ somewhat from the past.
3.2.2. Future Impervious Cover Growth Related to Commercial Development
The amount of new IC area that will be created due to future commercial development was estimated differently since
it is not tied directly to population growth. Instead, the projected amount of future commercial development was
based on a review of previous commercial development trends, the availability of existing, undeveloped, commercially
zoned, parcels within each community, the anticipated development goals and/or plans as described in master plan
documents and discussions with planning officials in each of the communities.
For purposes of this study, it was assumed that 20 percent of the available, buildable commercially zoned land (i.e., less
constrained land) would be developed for commercial or industrial purposes over the next 30 years or by the year
2040. This is generally considered to be a conservative commercial development rate representing less than 1 percent
average annual growth over the next 30 years. The only exception to this assumption was in Dover, where it was
assumed that 75 percent of the available, buildable commercially-zoned land would be developed over the next 30
years. The reason for this change relates to the fact that much of the available commercial area in Dover is located in a
heavily developed commercial area along Mast Road and this area has experienced uptick in commercial development
activity which is likely to continue in the immediate future. These assumptions were verified and supported through
direct interviews conducted with all watershed communities. The Strafford Regional Planning Commission (SRPC)
consulted with planning officials within the watershed communities as well as reviewed available master plans, where
available, to identify parcels or areas within commercially-zoned areas that are targeted or have higher development
potential for commercial development.
Table 3.2 provides a summary of the estimated amount of land currently developed for commercial and industrial uses,
the existing amount commercial or industrial IC area and the amount of commercially or industrially zoned land that is
available for development within each community.
Town
Total Town Area
(acres)
Town Area in the Watershed
(ac)
2010 Population in
Watershed
2010 IC Area in Watershed
(ac)
Existing IC Area per Capita
Barrington 31,117 2,891 1,651 82 0.05 Dover 18,592 885 2,764 125 0.04
Durham 14,552 6,572 6,219 248 0.12 UNH 1,300 1,185 7,582 493 0.03 Lee 12,928 4,620 2,381 220 0.05
Madbury 7,779 3,173 1,209 109 0.08 Nottingham 30,997 316 437 17 0.04
117,265 19,643 22,229 1,293
University of New Hampshire
Stormwater Center
7 Results
Approximately 500 acres or just under 3 percent of the total watershed area is currently mapped as developed for
commercial and/or industrial uses. These developed areas contain approximately 280 acres of IC area, which
represents approximately 22 percent of the total IC area in the watershed. Durham and UNH have the bulk of the
existing commercially developed area in the watershed, which is primarily related to the downtown area and the UNH
campus. Dover and Lee have the second and third highest amount of existing commercially or industrially developed
area, respectively. Barrington, which has a limited amount of existing commercial or industrial development, also has a
relatively large amount of commercially zoned land along Routes 4 and 125, which is likely to have strong commercial
development potential in the immediate future.
Table 3.2: Summary of Commercially-Zoned Land, Existing Developed and Impervious Cover Areas (ac) as well as the
Available Undeveloped Commercial Land Area for Future Development within the Watershed and Each Town
Town
Existing
Commercial &
Industrial
Developed
Land (acres)
Existing
Comm. &
Industrial
IC Area
(acres)
Existing Ratio of
Commercial IC
Area to
Commercial
Developed Lot
Commercially Zoned
Land Area Available
for Development/Re-
development (acres)1
Available Commercially
Zoned Land less Exist
Development &
Constrained land
(acres)2
Estimated Future
Commercial or
Industrial Developed
Area based on 20% of
Available Area Being
Developed (acres)
Barrington 8 4 0.5 387 290 58
Dover 76 32 0.4 187 100 74
Durham 120 87 0.7 720 520 104
UNH 123 94 0.8 600 540 108
Lee 140 55 0.4 315 230 47
Madbury 34 7 0.2 150 120 24
Nottingham 0 0 -- 20 20 4
Total 501 279 2,380 1,800 415 Notes: 1Commercial zoned areas include high density mixed-use areas in Durham and UNH Campus. 2Avaliable undeveloped, commercially zoned area excludes constrained lands (i.e., wetlands, surface water, steep slopes) and existing developed areas including residential, commercial and NHDOT right-of-way.
Assuming that 20 percent of the available and buildable, commercial or industrial zoned land in each community is
developed by 2040, another 415 acres of commercial and/or industrial land would be developed in the watershed. This
projected amount of future commercial development within each community compares favorably with the amount of
commercially zoned property identified by the SRPC planners as having high development potential or being targeted
for development by municipal officials. For instance, in Barrington, SRPC planners identified several, commercially-
zoned parcels comprising a total area of sixty (60) acres that are located along Route 4 west of the traffic circle and
amongst currently developed commercial uses as being targeted for future commercial development. One of the
parcels, which consists of approximately 24 acres is set back from Route 4 but as has right-of way access to Route 4. In
the town of Madbury, SRPC planners identified several commercially-zoned parcels consisting of nearly depleted,
gravel pits along Route 155 (aka Knox Marsh Road) near the Dover town boundary as having high future commercial
development. One parcel is approximately 92 acres in size and is currently used as a materials recycling facility that
apparently has plans to expand based on SRPC’s review.
In Lee, SRPC Planners identified several commercially-zoned parcels located around Routes 125 and Lee Traffic Circle
that comprise approximately 55 acres with high commercial development or redevelopment potential based on
conversations with municipal officials. This is very close to the estimated 47 acres of future commercial development
using the assumption of 20 percent of the available and undeveloped commercially-zoned land would be developed in
the next 30 years. Most of these areas are along the major transportation corridors, which is consistent with recent
University of New Hampshire
Stormwater Center
8 Results
development trends. The region as a whole represents a rapidly growing area and given the major transportation
routes within the watershed and the increased level of commuting along these routes, the recent development in
commercial services are likely to continue into the foreseeable future. Market forces and economic conditions are also
likely to influence the rate and type of commercial development as they are highly variable and cyclical.
Durham and UNH have seen a sharp rise in the commercial development activity in recent years. The Town of Durham,
in particular, has seen a substantial amount of development and redevelopment activity associated with several major
student housing projects. It is difficult to predict whether this activity will continue long-term into the future.
The 2012 UNH Campus Master Plan also provides a general forecast of the potential development and redevelopment
activity planned for the UNH campus for the next 20 years. The Master Plan identifies as many as forty (40) different
renovation/redevelopment projects for existing campus buildings and facilities that are targeted for completion over
the next 20 years. The total building footprint area associated with all of these projects adds up to approximately 12 to
14 acres with more than half of this area comprised of existing building footprint. The largest project area is associated
with the proposed renovations to the existing Field House facility consisting of approximately 2.5 acres. The Master
Plan also includes several transportation and parking area improvements as well as a new roadway extending behind
the Athletic fields connecting to the west side of campus and tying into Route 155a. These improvements are likely to
add several more acres of impervious area associated with development or redevelopment activity.
The amount of new IC area that will likely be created as a result of the future commercial development activity was
estimated based on the current ratio of commercial IC area to commercially developed area within the current
commercially zoned areas in each community using the 2010 high resolution GIS data. In general, the total IC area
including in the commercial zone excludes residential related IC area to avoid double-counting of areas. The estimated
amount of commercial IC area projected to result from this development is presented in Section 4.3.
3.3. Future Pollutant Loads
Estimating future pollutant loads as a result of the projected increases in IC area attributable to future residential and
commercial development was based on the use of the Simple Method model as published in DES’ Stormwater Manual.
The Simple Method model is widely used throughout the country to estimate relative pollutant load contributions from
various land uses and stormwater treatment options. The model estimates average annual pollutant loads based on
representative Event Mean Concentrations (EMCs) for each land use and the average annual runoff volume generated
accounting for varying levels of imperviousness. Table 2-1 presents typical event-mean concentrations for common
stormwater derived pollutants including total suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN).
Table 3.2: Typical Event-Mean Concentrations for Stormwater Related Pollutants
The typical EMC’s for the selected pollutants are then converted to average annual load rates for each land use using
Equations 1 and 2 to calculate the average annual runoff volume based on an average rainfall depth and average
percent imperviousness for each land use.
Land Use TSS (mg/L) TP (mg/L) TN (mg/L)
Residential 85 0.52 5.15
Commercial 77 0.33 2.97
Notes: NHDES Stormwater Manual, Volume 1, Appendix D.
University of New Hampshire
Stormwater Center
9 Results
Equation 1: R = P * Pj * Rv (Annual Runoff Volume)
Where: R = Annual runoff (inches) P = Annual rainfall (inches) 48 Pj = Fraction of annual rainfall events that produce runoff 0.9
Rv = Runoff volume coefficient (based on Equation 2 below)
Equation 2: Rv = 0.05+0.9(Ia)
Where:
Ia = typical % Impervious area for each land use type
Equation 3 is then used to calculate the average annual load.
Equation 3: Li = 0.226 * R * C * A (Annual Pollutant Load)
Where:
Li = Annual load (lbs)
R = Annual runoff (inches)
C = Pollutant concentration (mg/l)
A = Area (acres)
0.226 = Unit conversion factor
Table 3.2 provides a summary of the estimated pollutant loading rates (lbs/acre/year) for general residential and
commercial land uses and pollutants of concern using the equations above. The difference in pollutant load rates
between the residential and commercial land uses is due in large part to the difference in the predicted average annual
runoff volumes, which is a primary function of the percent imperviousness between the two land uses. For this
analysis, it was assumed the commercial and residential land uses have typical percent imperviousness of 85 and 30
percent, respectively, which is consistent with values contained in the TR-55 methodology that is often used to
estimate potential runoff volumes generated from land cover changes as part of site design. The percent
imperviousness values are likely to vary considerably based on actual conditions throughout the watershed.
Table 3.2: Estimated Average Annual Pollutant Loads for Each Acre of Commercial and Residential IC Area
Land Use TSS (lbs/yr/acre) TP (lbs/yr/acre) TN (lbs/yr/acre)
Residential 191 1.2 11.6
Commercial 579 2.5 22.3 Note: The average annual pollutant load rates are based on Event Mean Concentrations (EMCs) published in the NHDES Stormwater Manual and
assumed average % impervious or (Ia value) of 0.20 and 0.80 for residential and commercial land uses, respectively. The Ia value or % impervious could vary considerably within each town and within various locations within the watershed.
3.4. Potential Stormwater Treatment Effects Resulting from the New Stormwater Regulations
The amount of new IC area that may be subject to the new stormwater regulations and treatment requirements will
depend on a wide variety of factors. First and foremost, much depends on how soon communities adopt the new
regulations and what size and type of development are used as applicability thresholds to trigger Planning Board
review and compliance. In most cases, any future project that triggers site plan and/or subdivision review before
University of New Hampshire
Stormwater Center
10 Results
Planning Board would also generally be required to comply with the new stormwater treatment requirements. This
would include most, if not all, future commercial development, mixed-use development and residential subdivision
projects. Redevelopment of existing commercial and mixed-use properties, in most cases, would also be subject to the
new regulations depending on the applicability thresholds included in the regulations and whether any potential
exemptions would be allowed for. Single family home development on existing lots are not typically subject to
Planning Board review and, thus, were not included in this analysis.
The extent to which future residential development will occur as single-family home development as opposed to new
subdivisions or multi-family development will vary considerably between towns. For purposes of this analysis, it was
generally assumed that in the more rural towns, such as Barrington, Lee, Madbury and Nottingham, the future
residential development will likely occur as a 50:50 split between single-family, single lot development and subdivisions
or multi-family development with the latter being subject to new regulations. In these more rural towns, there is
greater likelihood that there are still some existing residential lots available for single family home construction as
compared to the more developed and built-out towns.
For the more densely developed towns, like Durham and Dover, it was assumed that 80 percent of the future
residential development will occur as new subdivisions or as multi-family development and these types of
developments would be subject to the proposed regulations. A review of building permit approvals in Durham over the
past seven years supports this assumption (see Table 3.3).
Table 3.3: Summary of Building Permit Approvals in Durham, NH from 2007 to 2013.
Year Total Single
Family Permits
Multi-Family or Subdivisions
Permits Annual Total
% of Annual Total
2013 19 137 156 88 %
2012 4 22 26 85 %
2011 56 111 167 66 %
2010 6 7 13 54 %
2009 5 94 99 95 %
2008 2 56 58 97 %
2007 3 4 7 57 %
Average Annual % of Building Permits as Multi-Family Projects or Subdivisions 80 %
Source: Durham Annual Town Reports: Code Enforcement Annual Summary
For commercial development, it was generally assumed that 80 percent of the future projects would be subject to the
new regulations. Although most all commercial projects are generally subject Planning Board approval because they
typically trigger Site Plan and/or Subdivision review, the applicability threshold used to require compliance with the
higher performance standards for stormwater management may vary by community and may depend on the
preferences of each community and whether exemptions are allowed for smaller projects and/or redevelopment
projects. The model SWA ordinance indicates the threshold to trigger compliance should be 5,000 square feet of
disturbance. However, adoption of the standard across individual communities reveals that thresholds can range from
5,000 to 20,000 square feet of proposed soil disturbance activity. Applicability thresholds can also be based on the
proposed amount of IC area which often is similar to the amount of proposed disturbed area but depends on the type
of development. A lower threshold will capture a higher percentage of projects.
Table 3.4 provides a summary breakdown of the current amount of IC area that exists on commercial properties within
the watershed based on a geospatial analysis of IC area on existing commercial properties. Using the IC area as a
University of New Hampshire
Stormwater Center
11 Results
surrogate for level of disturbance or an applicability threshold for projects that would be required to meet the
proposed stormwater regulations suggests that a threshold of 5,000 square feet would likely capture eighty (80)
percent of the future commercial development. A higher disturbance threshold of 10,000 sq. ft. would result in only 60
percent of future commercial development potentially subject to the proposed regulations if existing commercial
properties are indicative of the future development proposals.
Table 3.4: Percent of Commercial Properties Likely to be Subject to Regulations Based on Various Disturbance Thresholds
Used to Trigger Compliance with New Regulations
Recommended Disturbance Threshold (sq. ft.)
Estimated Percent of Commercial Projects\ Subject
to New Regulations
5,000 80 %
10,000 60 %
20,000 50 %
40,000 30 %
Figures 3.1 and 3.2 present a more detailed distribution of the amount of IC area that currently exists on commercial
parcels in Durham. Figure 3.1, which includes all commercial parcels, indicates that more than 95 % of the larger
commercial lots in Durham and Dover have less than 500,000 sq. ft. of IC area. Seventy percent of the existing parcels
have less than 40,000 sq. ft. of IC area. Figure 3.2 shows a frequency distribution of IC area for parcels with less than
30, 000 sq. ft. of IC area which is close to 62 percent of the total amount of commercial parcels in Durham and Dover.
This evaluation of the amount of IC area on existing parcels indicates that most commercial parcels have a relatively
small amount of IC area on a parcel by parcel basis.
Figure 3.1: Probability distributions for commercial properties in Durham
3.5. Estimated Effect on Potential Redevelopment Projects
The proposed regulations would promote better stormwater management and water quality treatment for future
redevelopment projects. Enhanced stormwater treatment on future redevelopment projects actually has the
University of New Hampshire
Stormwater Center
12 Results
advantage of lowering baseline pollutant loads associated with existing IC area rather than just limiting future
increases. As such, the potential impact of the regulations on future redevelopment projects is equally, if not, more
important as addressing future development. Because the redevelopment affects existing pollutant loads, the
potential load reductions were estimated separately from the future pollutant load increases related to new
development projects. The amount and potential location of redevelopment can be highly variable and will depend on
a wide range of site-specific conditions and constraints. For the purposes of this study, it was generally assumed that
25 percent of the existing commercially developed IC area in each Town would be redeveloped over the next 30 years.
The amount of redevelopment could obviously be higher and lower within each community and will be driven more
by market trends and economic conditions but this general assumption provides a reasonable basis for evaluating the
relative effect of the proposed local regulations on redevelopment. Since there is greater potential for various site
constraints to limit the amount of IC area that can be treated with stormwater BMPs when dealing with existing
developed sites, it was assumed that only 50 percent of this estimated redeveloped IC area would be treated by
stormwater BMPs. This is consistent with the recommended level of treatment for redevelopment projects included
in the SWA model ordinance.
University of New Hampshire
Stormwater Center
13 Results
4.0 Results
4.1 Future Population Growth Estimates
Table 4.1 presents population growth estimates for portions of each community that are within the watershed going
out to years 2025 and 2040. By 2025, approximately 2,400 more people are estimated to reside in the watershed
resulting an 11 percent increase over the current population. By 2040, another 3,400 more people are estimated to
live in the watershed representing a 26 percent increase over the 2010 population. Durham is expected to see the
largest increase with an additional 4,000 people predicted to live in the watershed portion of Town, which includes the
UNH Campus. In Dover, approximately 600 more people are projected to live in the watershed and approximately 500
more people are projected to live in the Barrington portion of the watershed. Within the watershed portions of Lee,
Madbury and Nottingham, less than 700 people are expected to be added by 2040. The future population estimates
appear to reflect a slower growth rate than what has occurred historically given that the watershed population
increased by approximately 25 percent in the 20 years between 1990 and 2010.
Table 4.1: Population Growth Estimates for Municipal Areas within the Oyster River Watershed
Town
Estimated Future Population Growth in the Watershed Over the Next 15 and 30 years
Projected Percent Change 2010-40 2010 2025 2040
Barrington 1,651 1,836 2,105 27 %
Dover 2,764 2,993 3,358 22 %
Durham 13,802 15,452 17,804 29 %
Lee 2,369 2,397 2,534 7 %
Madbury 1,209 1,372 1,597 24 %
Nottingham 437 546 669 53 %
Total 22,232 24,596 28,067 26%
Net Increase 2,364 5,835 Note: Population estimates are generated at the county level by the NHOEP and then distributed amongst the various towns based on the town/city population’s current share of the total County population for the year 2010 (SF 100% data). For instance in 2000, Lee’s population accounted for
approximately 3.7% of the total Strafford County population but, in 2010, its share of the county population declined to 3.5 percent indicating a shift of approximately -.2 percent. Thus, limited population growth is projected for the Town of Lee for the next 15 years.
4.2 Impervious Cover Area Growth Related to Future Residential Development
Table 4.2 presents a summary of the projected amount of additional IC area that is expected to result from future
residential development in each town. As described earlier, these estimates are based on the anticipated population
growth in each community and the current IC area per capita ratio for the residential areas in each town.
The results of this approach and the inherent assumptions indicate that approximately 185 and 270 acres of additional
IC area could be created in the watershed due to future residential development by the years 2025 and 2040,
respectively. These represent increases are approximately 15 and 20 percent higher than the total amount of IC area
currently in the watershed based on the 2010 high resolution aerial imagery. More than 75 percent of this new
residential IC area is expected to be developed in Durham primarily because it makes up a relatively large proportion of
the land area and population within the watershed.
University of New Hampshire
Stormwater Center
14 Results
Table 4.2: Projected Impervious Cover Growth due to Future Population Growth and Residential Development
Town
2010 Watershed Population
2010 Total IC
Area (acres)1
Projected Population Growth (new
residents)
Average Current IC
Area/Capita Ratio2
Sum of Projected Future Residential IC Area (ac) for
Residential Zoned Areas
2025 2040 2025 2040
Barrington 1,651 82 185 268 0.05 7 11
Dover 2,764 125 229 365 0.04 13 21
Durham 6,219 493 1,398 1,995 0.12 131 187
UNH 7,582 248 252 359 0.04 12 15
Lee 2,369 220 28 138 0.05 2 7
Madbury 1,209 108 163 225 0.08 14 19
Nottingham 437 17 109 123 0.04 4 5
Total 22,232 1,293 2,364 3,471 183 265 Notes: The 2010 Impervious cover area includes all IC types including roadways and the UNH Main campus area. The IC area per capita represents an average ratio for all residential zoned areas in each Town, which varies from zone to zone. Due to the distribution of the future population amongst the different residential zones with different development densities, multiplying the average IC area for each town by the population growth estimate for each town will not result in the same IC area estimate shown as the total IC values represent a sum total for all zoning districts.
The projected percent increase in new IC area relative to the existing amount of IC area ranges from approximately 5
percent increase in Lee to approximately 38 percent increase in Durham. The amount of IC area that will ultimately be
developed in the future will depend on a wide variety of factors not the least of which includes the primary type of
future residential development in each Town (i.e., large single-lot, multifamily, etc.) and how similar this compares to
the historical development activity.
4.3. Estimated Impervious Cover Growth Related to Future Commercial/Industrial Development
The amount of IC area that would be created from future commercial development was estimated based on the
existing ratio of IC area per acre of commercially or industrially developed land. This ratio was calculated using the
2010 zoning, land use and impervious cover GIS data layers.
Table 4.4 provides a breakdown of the existing commercially developed and related IC area in the watershed based on
the 2010 GIS land use and IC data. All totaled, there is approximately 500 acres of commercially or industrially
developed land and approximately 279 acres of existing IC area within the watershed. As discussed in Section 3.4, the
UNH Campus, Durham and Lee contain the bulk of the existing commercially developed areas in the watershed.
Table 4.4 also presents a summary of the existing amount of commercial and industrial developed area in each town,
the amount of IC area, the existing ratio of IC area to commercial-developed area, the amount of undeveloped,
commercially-zoned and the projected amount of future commercial development and IC area for each community.
The amount of commercially-zoned land considered to be available and buildable was estimated to be approximately
1,800 acres, based on existing zoning maps for each community. Available means currently undeveloped and buildable
means excluding constrained land areas (i.e., NWI wetlands, poorly and very poorly drained soils, steep slopes,
conservation lands and existing developed areas) from the total available commercially zoned land. In this study the
assumption that 20 percent of the available and buildable commercial land will likely be developed over the next 30
years results yielded an additional 415 acres of commercial development. This compares to the approximately 501
acres that are currently commercially developed in the watershed. This projected amount of future commercial or
industrial development is projected to result in an additional 240 acres of new IC area. This estimated increase in IC
area is similar in magnitude to that projected for future residential development.
University of New Hampshire
Stormwater Center
15 Results
For most communities and UNH, the projected amount of new commercial IC area that would be added in the future is
comparable to the existing amount of commercial IC area within each town, with the exception of Barrington.
Barrington currently has a limited amount of commercially or industrially developed within the watershed relative to
the amount of available, undeveloped commercially zoned land. Since much of this commercially-zoned land exists
along the Route 4 and 125 corridors, which has seen a fair amount of recent commercial development activity in the
last 5 to 10 years, it would seem reasonable to expect that the future development activity is likely to increase and
perhaps accelerate in this area. For the other towns, the projected increase in IC area from future development is less
than what currently exists, suggesting that this approach produced conservative estimates of the potential future
growth.
4.4 Future Pollutant Loads Related to Future Development with and without Stormwater Regulations
Table 4.5 presents a summary of the estimated pollutant load increases associated with the added IC area attributable
to future residential and commercial development within the Oyster River watershed. Projected pollutant load
estimates were developed based on the amount of future commercial and residential IC area expected to be subject to
the local stormwater regulations and the anticipated enhanced stormwater treatment with and without the regulations
in place. The pollutant load estimates are based on assumed removal efficiencies of 87, 55 and 60 percent for TSS, TP
and TN, respectively, for stormwater treatment BMPs that are similar to the enhanced bioretention systems that
provide an internal storage reservoir as developed by the UNH Stormwater Center (UNH SC 2012). These type of
treatment BMPs require a relatively small footprint and can be utilized in a wide variety of site conditions. For this
treatment to occur, it is assumed that each watershed town has, or would adopt the model regulations requiring
stormwater treatment in the immediate future.
Table 4.5: Estimated Pollutant Loads Associated with the Projected Future Residential and Commercial Development Activity
in the Oyster River Watershed with and without Enhanced Local Stormwater Regulations in Place
Town Land Use
Projected Increase in
IC Area (acres)
Estimated IC Area
Subject to Regs1
TSS (lbs/yr) TP (lbs/yr) TN (lbs/yr)
w/out
regs
w/
regs
Net
Reduct
w/out
regs
w/
regs
Net
Reduct
w/out
regs
w/
regs
Net
Reduct.
Barrington
Residential 11 5 2,835 1,602 1,233 17.3 12.6 4.7 172 120 52
Commercial 28 23 17,123 5,206 11,918 73.4 41.1 32.3 660 343 317
Subtotal 39 28 19,959 6,808 13,151 90.7 53.7 37.1 832 464 369
Dover
Residential 21 11 5,583 3,154 2,428 34 25 9 338 237 101
Commercial 31 25 19,005 5,778 13,228 81 46 35 733 306 427
Subtotal 52 36 24,558 8,932 15,656 115 70 45 1,071 543 528
Durham
Residential 187 150 49,622 15,085 34,537 304 170 134 3,007 1,563 1,443
Commercial 75 60 46,110 14,018 32,094 198 111 87 1,779 590 1,188
Subtotal 262 210 95,733 29,103 66,630 502 281 221 4,785 2,154 2,631
UNH
Residential 15 12 4,089 1,243 2,846 25 17 8 248 129 119
Commercial 82 66 50,398 15,321 35,077 216 121 95 1,944 1011 1,320
Subtotal 99 79 54,488 16,564 37,923 241 138 103 2,192 1,140 1,052
Lee
Residential 7 4 1,971 1,113 857 12 9 3 119 84 36
Commercial 18 15 11,304 3,436 7,868 48 27 21 436 322 114
Subtotal 28 20 13,274 4,550 8,725 60 36 24 555 405 150
Residential 19 9 5,010 2,830 2,180 31 22 9 304 215 91
University of New Hampshire
Stormwater Center
16 Results
Notes: 1Extimated IC area subject to the proposed local regulations assume 80 percent of the proposed commercial IC area and 50 percent of the residential IC area would be subject to the new regulations except in Durham and Dover where 80 percent of both types of IC area would be subject to the new regulations. Pollutant load reductions for treated IC areas assume stormwater BMPS provide removal efficiencies of 87, 55 and 60
percent removal for TSS, TP and TN, respectively.
The results indicate that the added IC area resulting from the estimated future residential and commercial
development in the Oyster River watershed over the next 30 years could increase the average annual pollutant loads
for Total Suspended Solids (TSS), Total Phosphorus (TP) and Total Nitrogen (TN) by approximately 217,667, 1,062 and
9,945 pounds, respectively, if no local stormwater regulations are adopted and no enhanced stormwater treatment
was provided. These potential increases would likely result in substantial adverse impacts to downstream water bodies,
especially since they are already classified as impaired due to existing pollutant contributions. For comparison, a
separate study, which estimated existing nitrogen loads in the Oyster River watershed, indicated that the average
annual total nitrogen load generated from existing IC areas was approximately 14,400 pounds per year (VHB, 2012).
The projected annual nitrogen load from the future IC area without stormwater treatment was estimated to add an
additional 10,000 pounds per year or result in approximately a 70 percent increase over the current existing load.
The level of stormwater treatment assumed to be required by the local regulations could reduce the future average
annual pollutant loads by approximately 40 to 70 percent depending on the pollutant and would potentially prevent
the discharge of approximately 147,144 pounds (~74 tons), 450 pounds and 4,900 pounds for TSS, TP and TN,
respectively, from entering the Oyster River and Great Bay estuaries. This would result in substantial water quality
benefits compared to having no standard or an out-date standard. For nitrogen alone, more than half of the predicted
future annual load attributed to new IC areas could be reduced by providing enhanced stormwater treatment.
The estimated pollutant load reductions could occur with essentially no direct or capital expense to the Towns as the
cost of the enhanced stormwater treatment would be borne by the developers of proposed projects. The estimated
load reductions could be even higher depending on the stormwater BMP type used and the amount of IC area treated.
In this study, approximately 76 percent or 386 acres out of the 505 acres of the estimated new IC area to be developed
in the watershed was assumed to be treated. This was based on assumptions that 50 percent of the future residential
IC area and 80 percent of the future commercial IC area would be treated for most towns with the exception of Dover
and Durham, where 80 percent of both the future residential and commercial IC area would be treated. The
stormwater BMPs were assumed to provide 87, 55 and 60 percent removal for TSS, TP and TN, respectively. Gravel
wetlands have been shown to have a higher removal efficiency for nitrogen and similar removal efficiencies for TSS and
TP (UNH SC 2012).
Even though Durham and UNH comprise a major portion of the watershed and the estimated future pollutant loads in
the watershed, adoption of the enhanced stormwater regulations in the other watershed towns could result in annual
load reductions of approximately 42,600, 124 and 1,210 pounds for TSS, TP and TN, respectively. These represent
substantial reductions even though these other towns make up a relatively small portion of the watershed area. Since
the proposed regulations would apply to future development in the other remaining portions of the towns outside the
Oyster River watershed, much greater load reductions would actually occur for the larger Great Bay watershed.
Madbury
Commercial 5 4 2,900 882 2,018 12 7 5 112 67 45
Subtotal 24 13 7,910 3,712 4,198 43 29 14 415 282 136
Nottingham
Residential 5 2 1,278 772 556 8 6 2 77 54 23
Commercial 1 1 438 133 305 2 1 1 17 10 7
Subtotal 6 3 1,716 905 861 10 7 3 94 64 30
Totals 505 386 217,667 70,523 147,144 1,062 615 447 9,945 5,049 4,896
University of New Hampshire
Stormwater Center
17 Results
4.5. Estimated Effect of Proposed Regulations on Future Redevelopment Projects
Redevelopment of existing properties is also likely to occur in the future. Although redevelopment of commercial and
multi-family residential properties are also often subject to local Planning Board review, the level of conformity and
compliance to new regulations can vary widely depending on the site-specific conditions and community preferences
for encouraging redevelopment projects. The extent and location of future redevelopment projects is difficult to
predict. For purposes of this analysis, it was generally assumed that 25 percent of the existing commercial and
industrial IC area in each Town would be redeveloped over the next 30 years. This represents an estimated
redevelopment rate of slightly less than 1 percent per year for the existing commercial and industrial IC area.
Redevelopment of existing residential properties is also likely to occur over time but was not included in this analysis.
Table 4.6 presents the estimated pollutant load reductions that could result from the projected redevelopment
projects for the Oyster River Watershed.
Table 4.6 Estimated Pollutant Loads Resulting from Potential Redevelopment Projects in the Oyster River Watershed
Notes: 1Estimated IC area subject to local regulations represents 25% of the existing commercial and industrial IC area in each town. However, only 50% of this area
assumed to be redeveloped would be treated by new stormwater BMPs. Nottingham has no existing commercial IC area in the watershed to be redeveloped.
Based on the assumptions used in this study, approximately 70 acres or 25 percent of existing commercial and
industrial IC area in the watershed was estimated to be redeveloped over the next 30 years or by 2040. Again, more
than half of this predicted redevelopment activity is expected to occur in Durham and/or on the UNH campus just
because they have the larger share of the existing IC area. Minimal redevelopment activity is projected to occur in
Barrington, Dover and Madbury and no redevelopment was estimated to occur in Nottingham since there are no
existing commercial properties in the watershed. If 50 percent of this redeveloped IC area was treated with enhanced
stormwater BMPs as a result of the proposed local regulations, this could reduce existing pollutant load contributions
by approximately 18,500, 50 and 495 pounds for TSS, TP and TN, respectively, on an average annual basis. These
represent fairly substantial load reductions that could be accomplished with essentially no direct cost to the Towns
since the cost of the stormwater treatment measures would be borne by the developers as new development and
redevelopment projects are proposed.
Town
Existing
Commercial
IC Area
(acres)
Estimate
d IC Area
Subject
to Regs1
TSS (lbs/yr) TP (lbs/yr) TN (lbs/yr)
w/out
regs w/ regs
Net
Reduct
w/out
regs
w/
regs
Net
Reduct
w/out
regs
w/
regs
Net
Reduct
Barrington 4 1 613 346 267 3 2 1 24 17 7
Dover 32 8 4,906 2,772 2,134 21 15 6 189 132 57
Durham 87 22 13,326 7,529 5,797 57 41 16 514 360 154
UNH 94 23 14,372 8,120 6,252 62 45 17 554 388 166
Lee 55 14 8,423 4,759 3,644 36 26 10 325 227 98
Madbury 7 2 1,018 575 443 4 3 1 40 28 12
Nottingham -- -- -- -- -- -- -- -- -- -- --
Total 279 70 42,672 24,110 18,562 183 133 50 1,646 1,152 494
University of New Hampshire
Stormwater Center
18 Results
Figure 4.1: Estimated Pollutant Load Reductions from Baseline Condition Over a Permit Term (5 years) from Redevelopment
Activities
The potential water quality benefits for redeveloped would be even greater for the larger Great Bay watershed, since
the local stormwater regulations would apply to other potentially developed and redeveloped areas in the remaining
portions of the Towns outside the Oyster River watershed. The combined effect that the proposed regulations on both
future and existing pollutant loads contributed by IC area is likely to be one of the most important and cost-effective
management strategies available to protect and possibly restore water quality conditions in the Great Bay estuary. The
proposed local regulations are likely to have even greater impact on future pollutant loads when factoring in potential
runoff volume reductions resulting from low impact development and groundwater recharge measures that are
included in the regulations but were not evaluated as part of this analysis.
University of New Hampshire
Stormwater Center
19 Results
5.0 Discussion
The results of this study indicate that approximately 500 acres of additional impervious cover (IC) area could potentially
be developed in the Oyster River watershed over the next 30 years or by the year 2040 due to future residential and
commercial development activity. This would represent approximately a 40 percent increase over the 1,290 acres of IC
area estimated to exist in the watershed based on 2010 aerial imagery. An additional 500 acres of IC area would bring
the estimated level of imperviousness for the watershed beyond the 10% threshold which has been widely reported as
a significant determinant of water quality attainment. The estimated increase in IC area could potentially be much
higher as historical data indicates that amount of IC area in the watershed increased by approximately 1,000 acres in
the 20 year period between 1990 and 2010.
This added future IC area, if developed without additional stormwater treatment, could increase the average annual
pollutant load for total suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN) in the Oyster River
watershed by approximately 218,000 pounds (~109 tons), 1,060 pounds and 9,950 pounds, respectively. This
additional pollutant load would most likely result in significant further degradation of the water quality conditions in
the Oyster River and downstream Great Bay estuary, as these water bodies are already considered impaired due to
existing pollutant contributions. With respect to total nitrogen, the projected future load, without stormwater
treatment, would represent an increase of approximately a 70 percent over the current average annual load of 14,400
pounds estimated to be contributed from the existing impervious surfaces within the watershed based on a separate
more extensive watershed modeling effort (VHB 2014). Essentially, based on the model results, every acre of new IC
area created without stormwater treatment could contribute approximately 10 pounds of additional nitrogen to
downstream receiving waters on an average annual basis.
This analysis primarily documents unmitigated increases in pollutant loads from projected development and future
land use changes. Both the Oyster River and Great Bay Watersheds are currently listed as impaired. This indicates that
existing pollutant loads must be reduced. Future pollutant loads anticipated from ongoing development and
redevelopment activities represent a confounding issue for any watershed management plan in that current loads need
to be reduced while new development and redevelopment activities continue to threaten further exacerbation of the
problem. Early and widespread adoption of enhanced local stormwater regulations could substantially limit future
pollutant load increases associated with future residential and commercial development. At worst, the regulations
represent a relative cap to the increase of degrading pollutants contributed by new impervious cover. At best, the
pollutant loading potential from new impervious is limited to the maximum extent practicable and redevelopment
projects serve to reduce existing baseline impervious cover and pollutant loads offering water quality benefits that
extend well beyond the Oyster River watershed.
It is also important to note that this study focused solely on estimating potential pollutant load increases from IC area
and did not evaluate the potential added pollutant contributions from other development related sources such as
increased lawn fertilizer use and additional septic systems that would also result from future development activity. The
previous Oyster River watershed modeling effort indicated that the average annual nitrogen load from existing lawn
fertilizer usage and septic systems were similar in magnitude to that contributed from impervious cover on an overall
watershed basis. This would suggest that the overall future pollutant loads at least for total nitrogen could increase by
two to three times that estimated from impervious cover areas alone as a result of future development activity.
University of New Hampshire
Stormwater Center
20 Results
The projected pollutant load reductions might also result in substantial financial benefits for each community by
avoiding or minimizing the potential deferred future costs of having to achieve similar pollutant load reductions in the
future through stormwater BMP retrofits as part of a water quality restoration project or perhaps to meet a pollutant
load allocation imposed by a future TMDL study. It is conceivable that regulated MS4 communities in the Great Bay
watershed may be required in the future to retroactively implement stormwater treatment of existing IC areas to
reduce existing or future added pollutant loads and, thus, would be faced with significant added future costs to install
these retrofit measures. Studies have shown that retroactively implementing stormwater treatment BMPs on
developed sites is often much more costly than the initial implementation costs at the time of development. Recent
stormwater BMP retrofit projects completed by the UNH Stormwater Center in the Seacoast Region have indicated
that design and construction cost for stormwater BMP retrofits averages around approximately $30,000 per acre of IC
area treated (UNH SC 2010). To retroactively treat the estimated future amount of IC area (i.e., 386 acres) that would
otherwise be required to be treated by developers at the time of development if the local stormwater regulations were
adopted plus treating the estimated 70 acres of existing IC area that might be redeveloped and also be subject to the
regulations would cost approximately $14 million in 2014 dollars using an average retrofit cost of $30,000 per acre.
These estimated future costs do not include the cost of inflation nor the added potential cost of lost or diminished
ecological services and/or recreational uses as a result of decreased water quality conditions. Even though Durham
and UNH have the bulk of the IC area in the watershed and would face much of the estimated potential future retrofit
cost, even more rural towns such as Barrington and Madbury, for example, could face future retrofit costs in the range
of $400,000 to $800,000 in 2014 dollars if they had to implement future stormwater retrofits to maintain the current
average annual pollutant loads in the Oyster River watershed as part of some future state or federal regulation update.
These cost estimates only pertain to the portion of each Town that is within the Oyster River watershed, which for
Barrington is less than 10 percent of the total Town area. If the potential savings in deferred costs or cost avoidance
gained through early adoption of stormwater regulations and enhanced treatment were extended to the entire Great
Bay watershed, the potential future cost savings could be huge.
The findings of this analysis clearly demonstrate that adopting local stormwater regulations to require more stringent
stormwater treatment standards could have a tremendous positive impact in minimizing the additional future pollutant
loads that could be discharged in the Great Bay estuary. This could significantly alter the current trajectory of declining
water quality conditions. As an incentive for Towns to engage early in the protection and restoration of the water
quality conditions in the Great Bay estuary and perhaps assist regulated MS4 communities in addressing the ever-
increasing more stringent federal permit requirements, the results of this study could provide the initial framework for
establishing pollutant load reduction credits for early adoption and maintaining strict adherence to enhanced local
stormwater regulations as it relates to future development and redevelopment activity in the watershed. The study
findings also highlight the importance of land conservation and preservation as another highly effective management
tool to limit and prevent future pollutant load increases in the Great Bay watershed.
University of New Hampshire
Stormwater Center
21 Results
6.0 References
NH Department of Environmental Services (NHDES). 2008. New Hampshire Stormwater Manual. Volume 1.
http://des.nh.gov/organization/commissioner/pip/publications/wd/documents/wd-08-20a.pdf
NHDES. 2012, 303(d) list of Impaired Water Bodies.
http://des.nh.gov/organization/divisions/water/wmb/swqa/2012/
NHDES. 2014. Great Bay Nitrogen Nonpoint Source Study. Final Report R-WD- 13-10. June 16, 2014.
http://des.nh.gov/organization/divisions/water/wmb/coastal/documents/gbnnpss-report.pdf
Southwest Watershed Alliance. 2012. Model Stormwater Standards for Coastal Watershed Communities. Prepared
by the UNH Stormwater Center and Rockingham Planning Commission.
http://southeastwatershedalliance.org/wp-content/uploads/2013/05/Final_SWA_SWStandards_Dec_20121.pdf
University of New Hampshire. Stormwater Center. 2012 Biennual Report.
http://www.unh.edu/unhsc/sites/unh.edu.unhsc/files/docs/UNHSC.2012Report.10.10.12.pdf
UNH Complex Systems. NH GRANIT. 2010. Impervious Cover Mapping of the Coastal NH Communities and Maine.
http://www.granit.sr.unh.edu/Project?project_id=204
Vanasse Hangen Brustlin, Inc. 2014. Oyster River Integrated Watershed Plan for Nitrogen Load Reductions.
Prepared for the Town of Durham and the University of New Hampshire, with Assistance from Woodard & Curran.
http://www.oysterriveriwp.com/pdf/2014-07-10-ORIWMP-v12-Final%20with%20cover.pdf
Trigger Threshold PercenT regulaTed
5,000 sf 80%10,000 sf 60%20,000 sf 50%
40,000 sf 30%
Table 1: Statistics for existing commercial developments in Durham that would be subject to regulation.
Minimizing Environmental Impacts Through Stormwater Ordinance and Site Plan Regulation
The Seacoast Region and the larger Great Bay watershed represents one of the fastest developing regions in the state. Stormwater runoff from impervious surfaces has been shown to be one of the leading causes for declining water quality and increased flooding in our region’s water resources. The Great Bay Estuary, a critical ecological and economic resource in the NH Coastal Region is listed as impaired due to declining water quality conditions resulting from increased pollutant loads largely contributed from non-point sources. As future development continues to unfold, pollutant loads from development activity are only going to increase.
In 2012, the Southeast Watershed Alliance (SWA) commissioned the UNH Stormwater Center and the Rockingham Planning Commission to develop model stormwater standards that communities could adopt in zoning or land development regulations to help minimize the environmental impacts of increased stormwater runoff from new and redevelopment activity.
G R E E N I N F R A S T R U C T U R E F O R N E w h A m p S h I R E C O A S TA L C O m m U N I T I E S
Environmental and Financial Benefits of Adopting Local Stormwater Regulations to Reduce Pollutant Loads Associated with Future Development
sWa Model sTorMWaTer sTandards Core Elements:• PromoteLIDPlanningand“Green
Infrastructure”• Enablegroundwaterrechargeandvolume
control• Addressexistingimperviouscoverthrough
redevelopment requirements• Requireoperationsandmaintenance
PiloT TesT case Using the Oyster River watershed as a pilot test case, this study evaluated the financial and ecological benefits of adopting the enhanced model stormwater standards to reduce future pollutant loads resulting from expansion of impervious area in the watershed over the next 30 years. The standards would apply to new development and redevelopment projects subject to site plan and/or subdivision review by the Planning Board. This includes most, if not all, commercial or mixed use development projects and residential multi-family or subdivision projects.
FuTure coMMercial ic areaOne of the most important aspects of the model regulation is the adoption of the actual trigger threshold which would require a new development or redevelopment to comply with the regulatory standards. Often this decision is made by comparing the state program trigger (100,000 sf of disturbance) to the proposed town standard. The model advocates adoption of a 5,000 sf trigger condition. This aspect of the regulation has a substantial effect on the future water quality and pollutant load reduction potential and should be carefully considered.
For context the statistical analysis of existing impervious cover (IC) for commercial parcels in Durham is shown in Table 1.
0 50 10015020025030035040045050039BARRINGTON
52DOVER
262DURHAM
99UNH
28LEE
24MADBURY
6NOTTINGHAM
TOTALS
Durham and UNH account for 70% of future projected IC area increases.
Figure 1: ProjectedincreaseinICArea(acres).
ProjecTed FuTure ic area by 2040Another important component of the study was the watershed-based approach as opposed to simply analyzing changes in a particular town or city. Since most towns contribute to multiple watersheds – as is the case with Barrington, Dover and Nottingham – only a portion of the land area of those municipalities contributes to the overall watershed load. In the Oyster River watershed, another 500 acres of IC area is estimated to be added over the next 30 years due to future residential and commercial development activity (Figure 1).
WITHOUT REGS
WITH REGS
NET REDUCTION
350
450400
300
150
250200
10050
0MIL
LIO
NS
OF
DO
LLA
RS
COST AVOIDANCE FOR GREAT BAY WATERSHED
ToWnFuTure ic TreaTed
FuTure cosTs$30K Per acre
barrington 29 $861,000
dover 43 $1,300,000
durham 231 $6,944,000
unh 102 $3,048,000
lee 32 $967,000
Madbury 15 $446,000
nottingham 3 $89,000
ToTal 455 $13,655,000
Figure 4:CostAvoidance
are relatively easy and inexpensive to implement, can be highly effective in reducing future pollutant loads not only from future development but from existing untreated commercial land uses as well. In essence these model standards can leverage the economic investment of developers in redevelopment projects to improve water quality conditions in the Great Bay and meet future state and federal permit requirements. Over the course of a five-year permit term, this study found that a 1.8% decrease in TSS, 1.1% decrease in TP and a 1.3% decrease in TN from baseline pollutant loads could be credited to a municipality that updated their stormwater standards. (Figure 3).
In addition, early adoption of these model standards could result in substantial cost savings through future cost avoidance in not having to construct numerous stormwater BMP retrofits to meet future regulations. The overall cost to retrofit this IC area would be approximately $14 million, using an average retrofit cost of $30,000 per acre. These estimated future costs do not include the
13,300
0
20,000
40,000
60,000
80,000
100,000
Barrington Dover Durham UNH Lee Madbury Nottingham
19,9586,800
24,600 29,100
8,90016,600
4,600 7,9003,700
TSS (lbs/yr) w/out regs
TSS (lbs/yr) w/ regs
1,700 900
95,700
54,500
0
200
100
300
400
500
600
Barrington Dover Durham UNH Lee Madbury Nottingham
54116
501
280241
13861 43 2936 10 7
TP (lbs/yr) w/out regsTP (lbs/yr) w/ regs
91 70
0
1,000
2,000
3,000
4,000
5,000
Barrington Dover Durham UNH Lee Madbury Nottingham
4641,071
2,154
543
2,192
1,140555 405 415 282 94 64
TN (lbs/yr) w/out regsTN (lbs/yr) w/ regs
4,785
832
Figure 2: EstimatedEffectonFutureTSS,TPandTNLoads(lbs/yr)DuetoStormwaterRegulations
13,300
0
20,000
40,000
60,000
80,000
100,000
Barrington Dover Durham UNH Lee Madbury Nottingham
19,9586,800
24,600 29,100
8,90016,600
4,600 7,9003,700
TSS (lbs/yr) w/out regs
TSS (lbs/yr) w/ regs
1,700 900
95,700
54,500
0
200
100
300
400
500
600
Barrington Dover Durham UNH Lee Madbury Nottingham
54116
501
280241
13861 43 2936 10 7
TP (lbs/yr) w/out regsTP (lbs/yr) w/ regs
91 70
0
1,000
2,000
3,000
4,000
5,000
Barrington Dover Durham UNH Lee Madbury Nottingham
4641,071
2,154
543
2,192
1,140555 405 415 282 94 64
TN (lbs/yr) w/out regsTN (lbs/yr) w/ regs
4,785
832
13,300
0
20,000
40,000
60,000
80,000
100,000
Barrington Dover Durham UNH Lee Madbury Nottingham
19,9586,800
24,600 29,100
8,90016,600
4,600 7,9003,700
TSS (lbs/yr) w/out regs
TSS (lbs/yr) w/ regs
1,700 900
95,700
54,500
0
200
100
300
400
500
600
Barrington Dover Durham UNH Lee Madbury Nottingham
54116
501
280241
13861 43 2936 10 7
TP (lbs/yr) w/out regsTP (lbs/yr) w/ regs
91 70
0
1,000
2,000
3,000
4,000
5,000
Barrington Dover Durham UNH Lee Madbury Nottingham
4641,071
2,154
543
2,192
1,140555 405 415 282 94 64
TN (lbs/yr) w/out regsTN (lbs/yr) w/ regs
4,785
832
G R E E N I N F R A S T R U C T U R E F O R N E w h A m p S h I R E C O A S TA L C O m m U N I T I E S
0.0%
0.5%
1.0%
TSS TP TN
1.5%
2.0%
% R
EDU
CTI
ON
OF
TO
TAL
EXIS
TIN
G L
OA
D
Figure 3: Pollutant load reduction credit per permit term(5years)
cost of inflation nor the added potential cost of lost or diminished ecological services and/or recreational uses as a result of decreased water quality conditions. A breakdown of the estimated cost avoidance for each town within the Oyster River watershed is shown in Figure 4.
This represents a 40 percent increase over existing conditions. With no local stormwater regulations in place, by 2040 this new IC area would increase the average annual Total Suspended Sediment (TSS) load by approximately 217,700 pounds ( ~109 tons),as well as add 1,060 pounds of Total Phosphorus (TP), and 9,950 pounds of Total Nitrogen (TN). With enhanced stormwater treatment in place as a result of local stormwater standards, the predicted average annual pollutant loads would be approximately 40 to 70 percent lower, eliminating 147,150 pounds (~74 tons) of TSS, 450 pounds of TP and 4,900 pounds of TN that would otherwise be discharged to the Oyster River and the Great Bay Estuary. For nitrogen alone, more than half of the predicted future annual load attributed to new IC area could be reduced by providing enhanced stormwater treatment. (Figure 2).
PoTenTial reducTion crediTsAn important outcome of this study is that the adoption of more stringent redevelopment requirements, which
econoMic iMPacT – cosT avoidanceIf the potential savings in deferred costs or cost avoidance gained through early adoption of stormwater regulations and enhanced treatment were extended beyond the Oyster River watershed to include the entire Great Bay watershed, the potential future cost savings could be in the hundreds of millions of dollars.
Thisresearchprojectwasconductedbythe UNH Stormwater Center in cooperation with VHB andtheSRPC.TheprojectwasfundedbyEPA.
Project Nam
eClient/Location
Project Collaborator(s)Type of System
Notes
1Berry Brook I
Dover/NHDES
UNHSC and Dover DPW
HSS TBF2Berry Brook I
Dover/NHDES
UNHSC and Dover DPW
HSS Bio 1 (north)3Berry Brook I
Dover/NHDES
UNHSC and Dover DPW
HSS Bio 2 (south)4Berry Brook I
Dover/NHDES
UNHSC and Dover DPW
HSS Bio 2 (south)5Berry Brook I
Dover/NHDES
UNHSC and Dover DPW
15A Hillcrest Ave Bio6Berry Brook I
Dover/NHDES
UNHSC and Dover DPW
Snow Ave Bio
7Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
Central Ave SGW
8Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
BB SW W
etland9Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
Crescent Avenue Veg Swale
10Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
Snow Avenue Veg Sw
ale11
Berry Brook IIDover/N
HDESUNHSC and Dover DPW
Page Avenue Veg Swale
12Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
Lowell Avenue Bio
13Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
Glencrest Avenue Bio
14Berry Brook II
Dover/NHDES
UNHSC and Dover DPW
Upper Horne Street Bio
15Berry Brook III
Dover/NHDES/RBC
UNHSC and Dover DPW
Roosevelt St Bio16
Berry Brook IIIDover/N
HDESUNHSC and Dover DPW
Roosevelt St Rock Basin17
Biopalooza NHDES/Durham
UNHSC and Durham
DPWOyster River Road SG
W18
Tedeschi Innovative BioEPA Region 1/Durham
UNHSC, Durham
DPWBio V
19The Cotages
Capstone Development/Durham
UNHSC, Tighe and Bond
SGW 1
20The Cotages
Capstone Development/Durham
UNHSC, Tighe and Bond
SGW 2
21The Cotages
Capstone Development/Durham
UNHSC, Tighe and Bond
Porous Asphalt22
The LodgesDurham
Tighe and BondSG
W23
The LodgesDurham
Tighe and BondSG
W24
Student Apartments
Perry Brant/DurhamUNHSC, Tighe and Bond
Porous Asphalt25
Lee Urgent Care
Wentw
orth Douglass Hospital/LeeSteve Height
Porous Asphaltclogged
26Alum
ni CenterUNH
UNHSC, Tighe and Bond
Porous Asphalt27
Hood HouseUNH/ICPI
UNHSC, Tighe and Bond
PICP28
Peter T Paul Business SchoolUNH
unknown
Porous Asphaltclogged
29Petty Brook Lane
DurhamMike Seivert
bioretention30
Golden G
ooseGolden G
oose Development/Durham
Mike Seivert
Porous Asphalt31
A‐lot RetrofitUNH
UNHSC/U
NH
bioretention 132
A‐lot RetrofitUNH
UNHSC/U
NH
bioretention 233
A‐lot RetrofitUNH
UNHSC/U
NH
bioretention 334
A‐lot RetrofitUNH
UNHSC/U
NH
bioretention 4
# BMPs
Entities/Municipalities
16City of Dover
10Tow
n of Durham6
University of N
ew Ham
pshire# BM
PsEngineering Entities
8Tighe and Bond
2Mike Seivert, M
JS Engineering1
Steve Height, Height Engineering
RESULTS
Oyster River W
atershed LID Survey Results
Recommended