Engineering Integrity SPI Upgradespi-ltuf.org/20151117/Engineering Integrity.pdfEngineering...

Preview:

Citation preview

Engineering Integrity SPI Upgrade

Hazid Technologies Ltd Creative Quarter, Nottingham, UK

UK based team of process engineers, computer scientists

Founders: a history of innovation

PDMS Specification, 1st 3D modelling software

Zyqad/Aspen Basic Engineering, 1st commercial FEED system

1st commercial computer assisted Hazops software

Intergraph resells SmartPlant Engineering Integrity and SmartPlant Process Safety

About Hazid Technologies

Brownfield

Making the most of your digital asset

Engineering Information

Hub

Intelligent P&IDs

AutoCAD Datasheets

Greenfield

Copyright Hazid Technologies Ltd 2015

Instrumentation, Electrical Excel, databases

Manage Errors & Actions

Governance Processes

Manage Exceptions

Manage Actions

Engineering Integrity

Management Oversight

New Service - Aurelia: Legacy Document Conversion

P&IDs Datasheets Loop diagrams

SP Engineering Integrity – Data Import Upgrades

Correct

Complete

Consistent

SmartPlant Instrumentation

SmartPlant Electrical

Datasheets, lists etc

SmartPlant 3D

SmartPlant P&ID

SmartPlant Instrumentation

SmartPlant Electrical

SmartPlant P&ID Datasheets

SmartPlant Instrumentation

SmartPlant Electrical

SmartPlant P&ID Datasheets

SP Engineering Integrity – Data validation upgrade

Cause & Effects charts incorporate any SPI Loops, DCS etc

SP Engineering Integrity – SAFE charts upgrade

SP Engineering Integrity – Reporting Upgrades

SP Engineering Integrity – SPI Analysis

Analyses complete plant including reference data in one click

0.0126 sec/tag (2 million complete tags in 7 hours)

Can create validation lists (Approved Manufacturer etc.)

Links through full Loop to Instrument to panel etc.

Displays enhanced Loop drawings with results

Tring compare against individual properties

Checks consistency across SPI,SPID,SPEL,3D

SmartPlant Instrumentation

SmartPlant P&ID

Engineering Integrity for SPI – Example checks

10

Index Validation of tag naming convention Check instrument types Check tags and CS Tags Specs Specs have forms Check on UOM’s Check on all required fields Wiring Check spare terminals in cabinets Check wiring types Check manufacturer and models Check min fields required Drawing have correct info All signals have a complete connected loop

Alarm setting and range based on 1” schedule 40 pipe to which it is attached

Engineering Integrity for SPI – Example Checks

PA-100

The isolation boundary is marked by the highlighted P&IDs

Design pressure of the vessel is 50 barg and less than the alarm set point so is unprotected (units converted)

This analysis was carried out automatically by Engineering Integrity

Engineering Integrity for SPI – Cross Platform Checks

Rule Building

Rule Builder

• Designed for Engineers

• No programming involved

• Fast to develop

• Easy to check

Libraries and projects

Rule libraries

Industries..

Project(s)

FEED, Detail ..

Projects …

Clients, Contractors

Create/modify rules

Fluids

Viewer Run checks

Manage change

Manage actions

SmartPlant P&IDs

SmartPlant Instrumentation

Other engineering data

Delivered with Specific SPI libraries

More complete delivered rule library

Automatic fix and push back of issues detected

Better property visualisation

Reduce Table sizes

Import of only selected Areas/Units

Automatic generation of Enhance reports

Real world improvements

Next release…

Recommended