Emergency Trench Latrineben-harvey.org/UNHCR/WASH-Manual/Wiki/images/8/84/UNHCR...Emergency Trench...

Preview:

Citation preview

Te

ch

nic

al D

esig

ns

Em

erg

en

cy T

re

nc

h L

atrin

e

an

d B

ills o

f Q

ua

ntity

2.

3.

1.

x3

x6

4.

5.

Back

x5

6. Sides

Front

7.

Identical side panels used in blocks with 1,2,3,and 4 cubicles.

Panels can be stockpiled with emergency contingency supplies.

8.

x3

9.

x1

10.

Doors

10. 11.

12. Assembly

Panels to be BOLTED together for ease of storage, assembly,

disassembly, moving and reuse in new locations

13.

Grab Rails x13

14.

Assembly

15.

Roof

16.

Assembly

17.

18.

Sanitary Seal

Handwashing

19.

20.

Upgrades

Security

All plastic sheeting to be upgraded within 6 months

Upgrade walls, doors, slabs, vent-pipes

Night time illumination to at least 100 lumens per m2

All female communal facilities to include a privacy wall

All doors securely lockable with child-friendly mechanism

Bill of Quantities

3. Nails 10cm (kg) 2. Wooden Plank (pc) 2.5cm x 20cm x 4m

1. Wooden Post (pc) 5cm x 5cm x 4m

4. Nails 5cm (kg)

x39 x7 x4

x3 x5

6. Plastic Sheeting 50m x 4m (roll)

11.Gutter Assembly 430m + Downpipe

x0.4 x0.8 x1

7. Door Bolt 4cm (pc)

8. Door Hinge (pc) 4cm x 8cm

x12

9. Metal Bolt + Washers M10 x 12cm

x30 x4

x1 x1 x21

13.Sand (m3)

14.Gravel (m3) 15.Cement 50kg (sacks)

10.Grab Rails and Door Handles 50cm (pc)

12.Handwashing Reservoir 200l (pc)

5. Latrine Slab (pc) 80cm x 120cm

TITLE

Communal Trench Latrine General LayoutPROJECT

Project Name, Country

APPROVED BYD. Porteaud - 15/01/14SCALE1:30

UNITSmetres

DRAWN BYB. Harvey - 11/12/13

DATE PUBLISHED02/02/14

A.04 SHEET

4 of 5

A.03 SHEET

3 of 5

A.02 SHEET

2 of 4

A.02

A.02

A.02

A.01 SHEET

1 of 5

Front Panel

Rear Panel

0.50 m

4.25 m

2.20

m

0.80 m 0.80 m 0.80 m 1.05 m

0.05 m

Door #1 Door #2 Door #3 Door #4

4.25 m

2.05

m

0.75

m1.

10 m

0.80 m 0.80 m 0.80 m 0.75 m0.80 m

0.05 m

TITLE

Communal Trench Latrine General LayoutPROJECT

Project Name, Country

APPROVED BYD. Porteaud - 15/01/14SCALE1:30

UNITSmetres

DRAWN BYB. Harvey - 11/12/13

DATE PUBLISHED02/02/14

SHEET2 of 5

A.04 SHEET

4 of 5

A.03 SHEET

3 of 5

A.02 SHEET

2 of 4

A.02

A.02

A.02

A.01 SHEET

1 of 5

Roof Panel

Side Panels

4.65 m

1.90

m

0.20 m 0.80 m 0.80 m 0.80 m 0.70 m 0.75 m 0.20 m

1.50 m

2.00

m

0.70

m1.

15 m 1.40 m

0.05 m

x5

TITLE

Communal Trench Latrine General LayoutPROJECT

Project Name, Country

APPROVED BYD. Porteaud - 15/01/14SCALE1:30

UNITSmetres

DRAWN BYB. Harvey - 11/12/13

DATE PUBLISHED02/02/14

A.04 SHEET

4 of 5

A.03 SHEET

3 of 5

A.02 SHEET

2 of 4

A.02

A.02

A.02

A.01 SHEET

1 of 5

Doors Detail

Latrine Slab Support Planks

x1x30.80 m 1.05 m

1.85

m

1.85

m

0.85

m0.

85 m

0.85

m0.

85 m

0.70 m 0.95 m

4.35 m

1.50

m

0.20

m0.

20 m

0.20 m 0.20 m 0.20 m 0.20 m 0.20 m 0.20 m

0.90

m

0.625 m 0.65 m 0.65 m 0.625 m 0.60 m

TITLE

Communal Trench Latrine General LayoutPROJECT

Project Name, Country

APPROVED BYD. Porteaud - 15/01/14SCALE1:30

UNITSmetres

DRAWN BYB. Harvey - 11/12/13

DATE PUBLISHED02/02/14

A.04 SHEET

4 of 5

A.03 SHEET

3 of 5

A.02 SHEET

2 of 4

A.02

A.02

A.02

A.01 SHEET

1 of 5

Assembly Front

Plan View

3.95 m2.

50 m

TITLE

Communal Trench Latrine General LayoutPROJECT

Project Name, Country

APPROVED BYD. Porteaud - 15/01/14SCALE1:30

UNITSmetres

DRAWN BYB. Harvey - 11/12/13

DATE PUBLISHED02/02/14

A.05 SHEET

5 of 5

A.04 SHEET

4 of 5

A.03 SHEET

3 of 5

A.02 SHEET

2 of 4

A.02

A.02

A.02

A.01 SHEET

1 of 5

Assembly Side

0.90 m

2.50

m

Recommended