Outreach 2017Clarion County PennDOT Maintenance
• County Manager – Joshua Clinger• Assistant County Manager – Jason Powell• Assistant County Manager – Vern Slaugenhoup• County Equipment Manager – Brant Cirrincione• Roadway Programs Coordinator – Ashley Downs• Adopt a Highway Coordinator – Corri Shumaker• County Office Number (814) 226-8200
2017 Clarion County PennDOT Maintenance
• County Profile– $11.6 million dollar budget– 87 Employees– 5 Stockpile Locations– 476 Linear State Highway Miles– 28 Miles of Interstate 80– 208 State Owned Bridges over 8’ span– 26 Dump Trucks– 6 Front End Loaders– 2 Graders– 3 Anti-icing Trucks
2017 Clarion County PennDOT Maintenance
• Winter Services– $1.12 million dollar budget for
2016/17– 1,040 total snow lane miles– 120 snow lane miles of I80– 22 assigned snow routes– 6 assigned stockpile sections– 56 full-time operators– Average 18,000 tons of antiskid– Average 12,000 tons of salt– Use on average 100,000
gallons of salt brine
2017 Clarion County PennDOT Maintenance
Maintenance Cycle Activities Summer 2017
– General Maintenance
– Drainage Improvements
– Seal Coat Surface Treatment
– Shoulder Cutting
2017 Clarion County PennDOT Maintenance2016-2017 Low Cost Safety Initiative Project
Remove debris from bank seen as a safety concern on SR 58
AfterBefore
2017 Clarion County PennDOT Maintenance
Seal Coat Program
Planned 434,000gallons of production
for the 2017 Seal Coat Program.
299,765 gallons completed in 2016
2017 Clarion County PennDOT Maintenance
Shoulder Cutting Program
Planned 196 miles of shoulder cutting
for 2017
129 miles completed in 2016
2017 Clarion County PennDOT Maintenance
Pipe Replacement / Drainage Program
Planned 240 feet of Pipe Replacement for 2017
and2,035 feet of Parallel Pipe
542 feet of cross pipe &3,700 feet of parallel pipe
completed in 2016
2017 Clarion County PennDOT Maintenance
Crack Sealing Program
Planned82.25 miles of Crack Sealing
(including roadway shoulders) for 2017
78.05 miles completed in 2016
2017 Clarion County PennDOT Maintenance
Underdrain Program
Planned 6,600 feet of Underdrain for
2017
9,980 feet completed in 2016
2017 Clarion County PennDOT Maintenance
Ditch Cleaning Program
Planned 43,000 feet of Ditch Cleaning for
2017
12,610 feet completed in 2016
2017 Clarion County PennDOT Maintenance
Department Force Mowing Program
28 Miles of Interstate 80 gets
mowed three times a year while 193 Miles
of Mainlines get mowed twice each
year
2017 Clarion County PennDOT Maintenance
SR 2003 closed June
2016
BEFORE BEFORE
AFTERReopened August 2016
Department Force Bridge Replacement
SR 2003 Reids Run BridgeMonroe Township
2017 Department Force Bridge ReplacementSR 4005 Over a Tributary to Canoe Creek
Beaver Township
2017 Clarion County PennDOT Maintenance
BEFORE BEFORE
2017 Clarion County PennDOT Maintenance
Project Location
Department Force Bridge Detour
Plans for the future Maintenance Activities
Clarion County PennDOT has joined forces with Jefferson County PennDOT, piloting a combined crew (DOT Crew). This DOT Crew will allow us to stretch resources between the two counties allowing both counties to complete general maintenance activities along with surface improvement programs in both counties.
2017 Clarion County PennDOT Maintenance
Agility Program
Current active work plans• Clarion County Career Center
− PennDOT – sweep, patch and sealcoat school’s driveway, use of message boards
− Career Center – provides use of conference room with refreshments and also provides lunches for various meetings.
• Clarion County Sheriff’s Office− PennDOT – allows the use of Department wash facilities− Sheriff’s Office – patrols in I-80 work zones to alert motorists
Agility is a tool to build relationships with local communities by sharing and exchanging services and resources.
Outreach 20172017 Clarion County PennDOT Maintenance2017 Clarion County PennDOT Maintenance2017 Clarion County PennDOT MaintenanceSlide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Plans for the future Maintenance Activities Slide Number 17
Recommended