Earthworks for InRoads V8i. Objectives. Starting InRoads. Start InRoads. Create a component bounded by top and rock surfaces. End-Area Volumes. Evaluation > Volumes > End-Area Volume Calculated from cross sections Surfaces must be opened Enable Create XML Report for printable output - PowerPoint PPT Presentation
Citation preview
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
Earthworks for InRoads V8i
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
2 | WWW.BENTLEY.COM
Objectives
Create Special Component For
Volumes
Compute End Area Volumes
Compute Quantities
Create Reports
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
3 | WWW.BENTLEY.COM
Starting InRoads
• Start InRoads
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
4 | WWW.BENTLEY.COM
Exercise…
• Create a component bounded by top and rock surfaces
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
5 | WWW.BENTLEY.COM
End-Area Volumes
Evaluation > Volumes > End-Area Volume– Calculated from cross sections
• Surfaces must be opened
– Enable Create XML Report for printable output– Select the appropriate surfaces
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
6 | WWW.BENTLEY.COM
Unsuitable Material
End-Area Volume > Unsuitable Material by Feature
- or -End-Area Volume > Unsuitable Material by
Station– Used for topsoil stripping and muck removal– Specify the depth of the material– Based on closed features or by station– Closed features
• Represents the stripping or muck removal boundary• Should be “Exclude from Triangulation”• Must intersect at least two points on each cross
section• Elevations of the feature points are not used• Feature Style used appears in volumes.xsl report
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
7 | WWW.BENTLEY.COM
Volume Exceptions and Classifications
•End-Area Volume > Volume Exception
•Used for bridges
•Select the starting and stopping station of the volume exception
Volume Exceptions
•End-Area Volume > Classifications
•Used to include or exclude materials in the reports
•Uses the surface component Style names in the reports
Classifications
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
8 | WWW.BENTLEY.COM
Compaction/Expansion
Compaction/Expansion• End-Area Volume > Compaction/Expansion• Select the starting and stopping station of the
Compaction/Expansion• Key-in the Cut and Fill Factors
Saving Project Specific Volume Settings• File > Save from the End-Area Volume dialog• Open the project volume settings for future InRoads
sessions• Project volume settings use the extension .eav and is
known as a Parameter File
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
9 | WWW.BENTLEY.COM
Exercise…
• Compute End-Area Volume– Setup the General leaf– Setup the Unsuitable Material by
Feature leaf– Setup the Classifications leaf– Setup the Compaction/Expansion
leaf– Setup the Volume Exceptions leaf– Compute the end-area volume– Review the reports– Save the Parameters file
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
10 | WWW.BENTLEY.COM
InRoads + Quantity Manager = Results
• InRoads Quantity Tools– Define pay items– Assign pay items to “engineered” data– Compute quantities– Create quantity database
• Quantity Manager Application– Read quantity database created by InRoads– Assign bidding and funding parameters (optional)– Export quantity information to external applications
such as Trns*port (optional)– Create quantity reports
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
11 | WWW.BENTLEY.COM
InRoads Quantity Tools
• Available as Add-in Application
• Appear on Quantities menu once enabled
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
12 | WWW.BENTLEY.COM
Pay Item Database
• Intelligence behind quantity calculations– Pay Item Name– Pay Item Code– Description– Unit– Formula for computing quantity
• Each• Linear• Area• Volume
– Rounding and deduction parameters
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
13 | WWW.BENTLEY.COM
Assigning Pay Items
• Assign Pay Items tool
– Quantities > Assign Pay Items
– Point and click graphical assignments
– Assign to DTM Feature or MicroStation Graphics
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
14 | WWW.BENTLEY.COM
Computing and Extracting Quantities
• Computes Quantities -> QM Database– From DTM Features and Graphics
• Computations based on– Entire project– Sheet Quantities
Quantity Manager
ReportsExporting
QM Database
InRoads Quantity Tools
InRoads FeaturesMicroStation Graphics
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
15 | WWW.BENTLEY.COM
Quantity Manager Application
• Reports
• Export
• Funding Participation and rules
• Phasing
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
16 | WWW.BENTLEY.COM
Report and Export Contents
• Quantity items displayed in the Quantity pane (upper right) controls report and export content
• To select all Quantities– Manual Mode
• Expand and individually select all Pay Items in left pane
– Automatic Mode• Enable View > Expand Quantity Categories• Select root in the left pane
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
17 | WWW.BENTLEY.COM
Reporting
• Generated from Quantity Manager Application
• Built in Formats– HTML and CSV
Formats– Customizable with
some XML Programming
© 2
00
9 B
en
tley S
yst
em
s, In
corp
ora
ted
18 | WWW.BENTLEY.COM
Summary and Review
You are now able to…
Before continuing let’sreinforce what
you have learned!
Recommended