E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL...

Preview:

Citation preview

E. Richards

EE Chamber installation

Summary

Position Of the EE chambers

General view of EEL chambers

EEL5 chamber

Installation of other chambers ex. EEL11

10/6/08

Position of The EE chambers

10/6/08

General view of EEL chambers

10/6/08

EEL5 chamber

10/6/08

Installation of other chambers ex. EEL11

Barrel vacuum pumps must be removed Removal of gangways using “Wisconsin Tooling” or CMS tooling.

10/6/08

Installation of other chambers ex. EEL11

Installation of EEL support structure with modified Wisconsin Tooling

10/6/08

Installation of other chambers ex. EEL11

Installation of the chamber with modified Wisconsin tooling and “grabber”

10/6/08

Installation of other chambers ex. EEL11

Replace modified gangways

Reinstall vacuum pump

10/6/08

Recommended