DURGA MINERALSSURVEY NO. 3834, 3837, 3838, 3839, 3840, 3875 & 3876,RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL,
JAYASHANKAR DISTRICT, TELANGANA STATE
FORM I
SUBMITTED BYSri Goli Mahender ReddyHouse No. 6-8-54,Raganna Darwaza,Hanamkonda, Warangal DistrictMobile No. +91 9989765929, +91 9848987115
STUDIES AND DOCUMENTATION BYTEAM Labs and ConsultantsB-115,116,117 & 509, Annapurna Block,Aditya Enclave, Ameerpet,Hyderabad-500 038Phone: 040-23748 555/616,Tele fax: 040-23748666Email: teamlabs@gmail.com
SUBMITTED TOSTATE LEVEL ENVIRONMENTAL IMPACT ASSESSMENT AUTHORITY
TELANGANA STATEGOVERNMENT OF INDIA
Durga Minerals Form-I
F-1
APPENDIX I(See paragraph – 6)
FORM 1(I) Basic InformationS. No Item Details
1 Name of the Project/s M/s. Durga Minerals2 S. No in the Schedule 1(a)3 Proposed capacity/area/length/tonnage to be
handled/command area/lease area/number of wellsto be drilled
Mine lease area is 4.28 ha (Semimechanized opencast method forLaterite production of 308632tons/annum)
4 New/Expansion/Modernization New mineCost estimated for the project Rs. 43 Lakhs
5 Existing Capacity/Area etc. -6 Category of Project i.e 'A' or 'B' B27 Does it attract the general condition? If yes, please
specifyNo
8 Does it attract the Specific condition? If yes, pleasespecify.
No
9 LocationPlot/Survey/Khasra No. Survey No. 3834, 3837, 3838, 3839,
3840, 3875 & 3876Village RamachandrapuramTehsil/Mandal MuluguDistrict JayashankarState Telangana
10 Nearest railway station/airport along with distance inkms.
Railway Station: Chintalpalli - 29 Km -SW
11 Nearest Town, City, District Headquarters along withdistance in kms.
Town: Warangal – 30km – WestDistrict headquarters:Eturunagaram-62km-NE
12 Village Panchayats, Zilla Parishad, MunicipalCorporation, Local body (complete postal addresswith telephone nos. to be given)
Village Panchayat:RamachandrapuramZilla Parishad: Eturunagaram
13 Name of the Applicant M/s. Durga Minerals14 Registered Address Sri Goli Mahender Reddy
House No. 6-8-54,Raganna Darwaza,Hanamkonda, Warangal DistrictMobile No. +91 9989765929, +919848987115
15 Address for Correspondence:Name Sri Goli Mahender Reddy
Durga Minerals Form-I
F-2
Designation(Owner/Partner/CEO) Managing partnerAddress Sri Goli Mahender Reddy
House No. 6-8-54,Raganna Darwaza,Hanamkonda, Warangal DistrictMobile No. +91 9989765929, +919848987115
Pin Code 506 001E-mailTelephone Number +91 9989765929, +91 9848987115Fax No. 040-23748 666
16 Details of alternative Sites examined, if any. Locationof these sites should be shown on a topo sheet.
Village-District-State –-NA –Site specific project i.e. mining.
17 Interlinked Projects -NA-18 Whether separate application of interlinked project
has been submitted?No
19 If yes, date of submission20 If no, reason21 Whether the proposal involves approval/clearance
under: if yes, details of the same and their status tobe given.(a) The Forest (Conservation) Act, 1980?(b) The Wildlife (Protection) Act, 1972?(c) The C.R.Z Notification, 1991?
No
22 Whether there is any Government Order/Policyrelevant/relating to the site?
Yes – In principle of quarry leasenotice issued by Department ofMines and Geology, Government ofTelangana vide notice no. 12754/R1-1/2015 dated 25.02.2017. Quarryingplan was scrutinized by DeputyDirector of Mines and Geology,Warangal Vide Letter No. 1764/QP-3/WGL/17 dated 24.05.2017
23 Forest land involved (hectares) No24 Whether there is any location pending against the
project and /or land in which the project is proposeto be set up?(a) Name of the Court(b) Case No(c) Orders/directions of the Court, if any and itsrelevance with the proposed project.
No
Durga Minerals Form-I
F-3
(II) Activity1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in waterbodies, etc.)
S.No Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data
1.1 Permanent or temporarychange in land use, landcover or topographyincluding increase inintensity of land use (withrespect to local land useplan)
NO The applied mine lease area is 4.2 Ha. The leasearea is an undulating mound rising to about 42mfrom the ground level and gently sloping fromNW to SE.
1.2 Clearance of existing land,vegetation and buildings?
NO It is a new mine using for Laterite extraction.
1.3 Creation of new land uses? NO1.4 Pre-construction
investigations e.g. borehouses, soil testing?
YES Survey completed.
1.5 Construction works? YES Construction activity involves infrastructure only.
1.6 Demolition works? NO1.7 Temporary sites used for
construction works orhousing of constructionworkers?
NO Local villagers shall be employed.
1.8 Above ground buildings,structures or earthworksincluding linear structures,cut and fill or excavations
YES Above ground building for the mine office only.No major excavation activity involved.
1.9 Underground works includingmining or tunneling?
NO The present method of mining is opencast semimechanized method for Laterite.
1.10 Reclamation works? NO No reclamation is proposed during the planperiod
1.11 Dredging? NO1.12 Offshore structures? NO1.13 Production and
manufacturing processes?YES Mining by using Opencast Semi mechanized
method. Detail Process description is enclosed in(Annexure I)
1.14 Facilities for storage of goodsor materials?
NO
1.15 Facilities for treatment ordisposal of solid waste or
YES During years plan period about 48911 Tons ofwaste will be generated. This waste will be
Durga Minerals Form-I
F-4
liquid effluents? dumped in west side of the mining lease areacovering an area of 2800 m2. (Annexure III)Liquid waste i.e. effluent from the domesticsource shall be sent to septic tank followed bysoak pit.
1.16 Facilities for long termhousing of operationalworkers?
NO
1.17 New road, rail or sea trafficduring construction oroperation?
NO
1.18 New road, rail, airwaterborne or othertransport infrastructureincluding new or alteredroutes and stations, ports,airports etc?
NO
1.19 Closure or diversion ofexisting transport routes orinfrastructure leading tochanges in trafficmovements?
NO
1.20 New or diverted transmissionlines or pipelines?
NO
1.21 Impoundment, damming,culverting, realignment orother changes to thehydrology of watercoursesor aquifers?
NO The ground water is found to be reached at 25mdepth at the bore well nearby areas on lowerlevel.
1.22 Stream crossings? NO1.23 Abstraction or transfers of
water form ground or surfacewaters?
NO Water shall be drawn from local villages for thepurpose of domestic and water sprinklingpurpose.
1.24 Changes in water bodies orthe land surface affectingdrainage or run-off?
NO
1.25 Transport of personnel ormaterials for construction,operation ordecommissioning?
YES Local villagers shall be employed. Laterite is sentaway from the site, the numbers of trips are 57per day.
1.26 Long-term dismantling ordecommissioning orrestoration works?
NO
1.27 Ongoing activity duringdecommissioning which
NO
Durga Minerals Form-I
F-5
could have an impact on theenvironment?
1.28 Influx of people to an area ineither temporarily orpermanently?
NO
1.29 Introduction of alien species? NO1.30 Loss of native species or
genetic diversity?NO
1.31 Any other actions? NO
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/checklist
Confirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible)with source of information data
2.1 Land especially undevelopedor agricultural land (ha)
YES The mine lease area is 4.28 ha. Themining lease area is an undulatingmound rising to about 42m from theground level and gently sloping fromNW to SE.
2.2 Water (expected source & competingusers) unit: KLD
YES 4.0 KLD, through tankers from nearbyvillage and RWS. Annexure-II.
2.3 Minerals (MT) YES The present proposal is for Lateritemining and it is a mineral.
2.4 Construction material– stone,aggregates, sand/soil(expectedsource- MT)
NA Mine office and temporary restshelters will be constructed, no majorconstruction involves.
2.5 Forests and timber (source – MT) NO2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel(MT), energy (MW)
YES Semi mechanized opencast mining;power shall be drawn from nearbyvillages.
2.7 Any other natural resources (useappropriate standard units)
NO
Durga Minerals Form-I
F-6
3.Use, storage, transport handling or production of substances or materials, which could beharmful to human health or the environment or raise concerns about actual or perceived risks tohuman health.
S.No. Information/Checklist.confirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible)with source of information data
3.1 Use of substances or materials,which are hazardous (as perMSIHC rules) to human health orthe environment (flora, fauna,and water supplies)
NO There are no Hazardous substances ormaterials to human health or theenvironment.
3.2 Changes in occurrence of diseaseor affect disease vectors (e.g.insect or water borne diseases)
NO
3.3 Affect the welfare of people e.g.by changing living conditions?
YES The proposed project shall enhance theprospects of employment. Recruitmentfor the unskilled and semiskilledworkers for the proposed project will befrom the nearby villages
3.4 Vulnerable groups of people whocould be affected by the projecte.g. hospital patients, children,the elderly etc.,
NO The nearest village isRamachandrapuram located at adistance of 2.3 Km from the ML area ineast. The project shall not have anysignificant impact on vulnerable groupsof people.
3.5 Any other causes NO
Durga Minerals Form-I
F-7
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsource of information data
4.1 Spoil, overburden or minewastes
NO 5% of waste material is anticipated in theplan period
4.2 Municipal waste (domesticand or commercialwastes)
NO
4.3 Hazardous wastes (as perHazardous WasteManagement Rules)
NO The present mine is Semi mechanizedopencast method. Excavators will be usedfor loading. Waste oil will be sent toauthorized recyclers.
4.4 Other industrial processwastes
NO
4.5 Surplus product NO4.6 Sewage sludge or other
sludge from effluenttreatment
NO
4.7 Construction or demolitionwastes
NO
4.8 Redundant machinery orequipment
NO
4.9 Contaminated soils or othermaterials
NO
4.10 Agricultural wastes NO4.11 Other solid wastes NO
Durga Minerals Form-I
F-8
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.No. Information/ChecklistConfirmation
Yes/No Details thereof (withapproximate quantities/rates,wherever possible) withsource of information data
5.1 Emissions from combustion offossil fuels from stationary ormobile sources
NO
5.2 Emissions from productionprocesses
YES Emissions are anticipated frommining, and transport activity.
5.3 Emissions from materials handlingincluding storage or transport
YES Dust may rise during mining,and transport.
5.4 Emissions from constructionactivities including plant andequipment
YES Dust may rise during transportof material and mining activity.The dust emissions shall bemitigated by water spraying.
5.5 Dust or odours from handling ofmaterials including constructionmaterials, sewage and waste
NO
5.6 Emissions from incineration ofwaste
NO
5.7 Emissions from burning of wastein open air (e.g. slash materials,construction debris)
NO
5.8 Emissions from any other sources NO
Durga Minerals Form-I
F-9
6. Generation of Noise and Vibration, and Emissions of Light and Heat:S.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, whereverpossible) with source ofinformation data with source ofinformation data
6.1 From operation of equipmente.g. engines, ventilation plant,crushers
YES No noise or ground vibrationsgeneration because the Laterite isbeing excavated without drillingand blasting. Water sprinklingsystem is provided to reduce thedust emissions. PPE’s are providedto the workers to reduce the noiselevels.
6.2 From industrial or similarprocesses
NO
6.3 From construction or demolition YES Safety equipments shall beprovided to the workers.
6.4 From blasting or piling YES Water sprinkling system is providedto control the dust emissions. PPE’sare provided to the workers.
6.5 From construction or operationaltraffic
YES The increased traffic shall not haveany significant impact.
6.6 From lighting or cooling systems NO6.7 From any other sources NO
Durga Minerals Form-I
F-10
7. Risks of contamination of land or water from releases of pollutants into the ground or intosewers, surface waters, groundwater, coastal waters or the sea:
S.No. Information/Checklist confirmation Yes/No Details thereof (withapproximatequantities/rates, whereverpossible) with source ofinformation data
7.1 From handling, storage, use or spillage ofhazardous materials
NO The material excavated isLaterite and is mineral.
7.2 From discharge of sewage or othereffluents to water or the land (expectedmode and place of discharge)
NO Septic Tank followed by soakpit shall be provided fortemporary toilets.
7.3 By deposition of pollutants emitted to airinto the land or into water
NO
7.4 From any other sources NO7.5 Is there a risk of long term build up of
pollutants in the environment from thesesources?
NO
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible)with source of information data
8.1 From explosions, spillages, fires etcfrom storage, handling, use orproduction of hazardoussubstances
NO
8.2 From any other causes NO8.3 Could the project be affected by
natural disasters causingEnvironmental damage (e.g.floods, earthquakes, landslides,Cloudburst etc)?
NO
Durga Minerals Form-I
F-11
9. Factors which should be considered (such as consequential development) which couldlead to environmental effects or the potential for cumulative impacts with otherexisting or planned activities in the locality
S. No. Information/Checklist confirmation Yes/No Details thereof (withapproximate quantities/rates,wherever possible) withsource of information data
9.1 Lead to development of supporting.facilities, ancillary development ordevelopment stimulated by the projectwhich could have impact on theenvironment e.g.:
•Supporting infrastructure (roads,power supply, waste or waste watertreatment, etc.)
•Housing development•Extractive industries• Supply industries• Other
YES The proposed project shallenhance the prospects ofemployment. Recruitment forthe unskilled and semiskilledworkers for the proposedproject will be from the nearbyvillages.
9.2 Lead to after-use of the site, whichcould have an impact on theenvironment
NO
9.3 Set a precedent for later developments NO9.4 Have cumulative effects due to
proximity to other existing or plannedprojects with similar effects
NO The baseline environmentalstatus of the surrounding areasis within the prescribed limitsas observed from thesecondary data.
Durga Minerals Form-I
F-12
(III) Environmental Sensitivity
S.No. Areas Name/Identity
Aerial distance (within 15 km.)Proposed project location boundary
1 Areas protected under internationalconventions, national or locallegislation for their ecological,landscape, cultural or other relatedvalue
NO
2 Areas which are important orsensitive for ecological reasons -Wetlands, watercourses or otherwater bodies, coastal zone,biospheres, mountains, forests
YES Narasampet Pakhal reserve forest isat a distance of 7.0 km from the MLarea in Southeast direction. JakaramNo. 2 reserve forest is at a distanceof 3.9 km from the ML area inNortheast direction. Jakaram No.1reserve forest is at a distance of 2.7km from the ML area in Northwestdirection. Morancha Branch (KakatiyaCanal) is flowing at a distance of 2.0km from the ML area in SW direction
3 Areas used by protected, importantor sensitive species of flora or faunafor breeding, nesting, foraging,resting, over wintering, migration
NO
4 Inland, coastal, marine orunderground waters
NO
5 State, National boundaries NO6 Routes or facilities used by the public
for access to recreation or othertourist, pilgrim areas
NO
7 Defence installations NO
8 Densely populated or built-up area NO The project impact area has no urbanor semi-urban area. The PIA consistsof rural area with low agriculturalactivity.
9 Areas occupied by sensitive man-made land uses (hospitals, schools,places of worship, communityfacilities)
NO The PIA consists of communityfacilities in various villages, howeverno major impact is anticipated, as themine is 2.3 Km away from theresidential area.
10 Areas containing important, highquality or scarce resources(ground water resources, surface
NO
Durga Minerals Form-I
F-13
resources, forestry, agriculture,fisheries, tourism, minerals)
11 Areas already subjected to pollutionor environmental damage. (thosewhere existing legal environmentalstandards are exceeded)
NO The area is undeveloped and consistsof very few industries.
12 Areas susceptible to natural hazardwhich could cause the project topresent environmental problems(earthquakes, subsidence, landslides,erosion, flooding or extreme oradverse climatic conditions)
NO
Durga Minerals Annexure of Form-I
A-3
Introduction
M/s. Durga Minerals propose to conduct Semi mechanized opencast method mining for
Laterite production in an area of 4.28 ha in Survey No. 3834, 3837, 3838, 3839, 3840, 3875
& 3876, Ramachandrapuram Village, Mulugu Mandal, Jayashankar District, Telangana State.
In principle of quarry lease notice issued by Department of Mines and Geology, Government
of Telangana vide notice no. 12754/R1-1/2015 dated 25.02.2017. Quarrying plan was
scrutinized by Deputy Director of Mines and Geology, Warangal Vide Letter No. 1764/QP-
3/WGL/17 dated 24.05.2017. Laterite production of 308632 tons/annum. Capital cost
proposed for the mining will be approximately Rs. 43 Lakhs.
Mine Location
M/s. Durga Minerals propose to conduct other than Semi mechanized open cast method
mining for Laterite production in an area of 4.28 ha in Survey No. 3834, 3837, 3838, 3839,
3840, 3875 & 3876, Ramachandrapuram Village, Mulugu Mandal, Jayashankar District,
Telangana State. The mine lease area falls in the Survey of India topo sheet no. 56 N/16 with
the co-ordinates of Latitude 18°06'53.0"N and Longitude 79°53'22.10"E with an elevation of
280m. The nearest village is Ramachandrapuram located at a distance of 2.3 Km from the
ML area in East direction. Ramachandrapuram to Narasimhareddypalli village road is
passing at a distance of 0.2km in South direction. National highway road (NH-202) is
Warangal and Eturnagaram village at a distance of 3.8 Km from the ML area in West
direction. Nearest town is Warangal at a distance of 30 km from the lease area in SW
direction. Railway station is Chintalpalli located at a distance of 29 Km from the ML area in
Southwest direction. Narasampet Pakhal reserve forest is at a distance of 7.0 km from the
ML area in Southeast direction. Jakaram No. 2 reserve forest is at a distance of 3.9 km from
the ML area in Northeast direction. Jakaram No.1 reserve forest is at a distance of 2.7 km
from the ML area in Northwest direction. Morancha Branch (Kakatiya Canal) is flowing at a
distance of 2.0 km from the ML area in SW direction. There are no national parks,
wildlife/bird sanctuaries observed in 10km radius from the mine lease area. Details of the
mine lease area are presented in table A-1.
Durga Minerals Annexure of Form-I
A-4
Table A-1 Details of the Mine Lease areaState &District Mandal Village Sy. No. Area
in HaOwnership and
status of occupancyTelangana &Jayashankar Mulugu Ramachandrapuram 3834, 3837, 3838, 3839,
3840, 3875 & 3876 4.28 Patta land
Reserves available for Mining and Life of the mine
Total Proved Reserves = 2998723 Tons
Reserves under 7.5m buffer zone= 347248 Tons
Reserves under safety slopes= 295351 Tons
Total Reserves blocked = 642599 Tons
Total available reserves= 2356124 Tons
Life of the mine = 2356124/308632= 7.63 or 8 Years
Mining Method
Semi mechanised opencast method operations are planned to be carried out partly
manually and partly by deploying machinery that poclain is to be deployed for removal.
Laterite production will be obtained by opencast mining exposed single bench height is 6m
each. A safe slope angle will be maintained throughout the mining operator. Apart from this
mechanization is required for this mining.
Year Wise Development & Production:
1st Year: It is proposed to raise about 135728 tons of Laterite in the first year with 300
working days from this area. In this one bench proposed for along the section X-X' and
bench height is 6m and width is 7.5m. In the year waste material of 7144 tons will be
obtained by advancing the bench from West to East.
2nd Year: It is proposed to raise about 112894 tons of Laterite in the 2nd year with 300
working days from this area and proposed a single bench towards west side along section X-
X' and bench height is 6m and width is 7.5m. In the year waste material of 5942 tons will be
obtained by working towards east.
3rd Year: It is proposed to raise about 113476 tons of Laterite in the 3rd year with 300
working days from this area and proposed a single bench towards west to east side along
section X-X' and bench height is 6m and width is 7.5m in below second year working. In the
year waste material of 5972 tons will be obtained.
Durga Minerals Annexure of Form-I
A-5
4th Year: It is proposed to raise about 308632 tons of Laterite in the 4th year with 300
working days from this area and proposed a single bench towards east to west side along
section X-X' and bench height is 6m and width is 7.5m in below three year working area. In
the year waste material of 16244 tons will be obtained.
5th Year: It is proposed to raise about 258586 tons of Laterite in the 5th year with 300
working days from this area and proposed a single bench towards west to east side along
section X-X' and bench height is 6m and width is 7.5m in below three year working area. In
this year waste material of 13610 tons will be obtained. During the plan period total
recovery 95% of production 929317 Tons of Laterite and remaining 5% is 48911 Tons of
waste mineral will be available. Year wise production and waste generation details are
presented in table A-2.
Table A-2 Year wise Laterite Production and Waste generation
Year Aream2
Benchheight m
Volumem3 TF Volume
TonsRecovery
@95% TonsWastage
@5% Tons1 11906 6 71436 2 142872 135728 71442 9903 6 59418 2 118836 112894 59423 9954 6 59724 2 119448 113476 59724 27073 6 162438 2 324876 308632 162445 22683 6 136098 2 272196 258586 13610
Total 489114 978228 929317 48911Extent of mechanization
S. No. Machinery Quantity1 Tata Hitachi Ex 200 Lc 12 Crow Bars 33 Tractor with Tanker 14 Tippers 2
Employment Potential
The following personnel will be employed for mining in this area.
Employment potentialS. No Description Quantity
1. Mines Manager 12. Supervisor 23. Skilled workers 204. Semi Skilled workers 20
Total 43
Durga Minerals Annexure of Form-I
A-6
ANNEXURE - II
Water Requirement
Water requirement for the project is mainly for Domestic source, maintaining the green belt
and also for sprinkling on the haulage roads to mitigate dust emissions. The water shall be
drawn from nearby villages. The water requirement of the project is presented in Table A-3.
Table A-3 Water RequirementS. No. Water Usage Quantity KLD
1 Water sprinkling on haul roads @ 1Ltr/Sq. mt +1/4th for waste dump 1.72 Domestic @ 45 Ltr/Head (43 No’s) 1.93 Green Belt – 2 times a day 0.4
Total 4.0
Durga Minerals Annexure of Form-I
A-7
ANNEXURE – III
Solid Waste
During the plan period total recovery 95% of production 929317 Tons of Laterite and
remaining 5% is 48911 Tons of waste mineral will be available.
Dump Area
The waste generated will be dumped in the west side of the mining lease area covering an
area of 2800 m2. Construction of retaining wall for waste dump in slope side and garland
drains in the mine lease area.
Recommended