DSM Measures in Haryana
23rd July 2014
Contents
Importance of DSM in case of Haryana
Load Curve of Haryana
Analysis of Load Curve
Status of Smart Grid Project
Revision iof PLEC Charges and Impact study of DHBVN
Status of MOU with BEE & EESL
DSM implementation: Objective Oriented and Sustainable Approach
DSM measures implemented in Haryana: Projects and Coverage
Case Studies
HAREDA Green Building at Panchkula
Propsoed NET-ZERO Buliding of UHBVN at Panchkula
2
Importance of DSM in case of Haryana: Substantial
Scope for Energy Conservation
Domestic constitutes 22% share of the total sales in the State
• The Bachat Lamp Yojna resulted in reduction of 10.23 MW connected load and annual saving of 15.73
MUs in Sonepat and Y’ Nagar which have 13% of the total state’s DS consumers
Agricultural constitutes 29% of the total sales in the State
• W.e.f. December 2009 , it has been mandated to use star rated Agriculture Pump. After that all the new
AP connections i.e. 112945 nos. are released with Star rated Pump sets, which constitute 19% of total
installed base of 579338 Nos. AP connections in the state. which clearly indicates huge scope for
Agriculture DSM
3
Domestic77%
Non Domestic10%
LT (Industry)2%
HT Industry 0%
AP(Metered)6%
AP(Un-metered)
4%OTHERS
1%
No of connection as of March'14
Domestic22%
Non Domestic10%
LT (Industry)6%
HT Industry 25%
AP(Metered)15%
AP(Un-metered)
14%
OTHERS8%
Actual Sales for FY13-14
4
Quarterly Load Curve
6864 (20:00)
5434 (08:00)
0500
100015002000250030003500400045005000550060006500700075008000
(in
MW
)
Time
Average Load Curve for Haryana (July to Sep 2013)MAX (MW) 6864
MIN (MW) 5434
AVG (MW) 6055
5307 (18:45)
3745 (02:45)
0500
100015002000250030003500400045005000550060006500700075008000
(in
MW
)
Time
Average Load Curve for Haryana (Oct to Dec 2013)MAX (MW) 5307
MIN (MW) 3745
AVG (MW) 4229
Quarterly Load Curve
5
5883 (20:00)
4438 (08:00)
0500
100015002000250030003500400045005000550060006500700075008000
(in
MW
)
Time
Average Load Curve for Haryana (April to June 2014)MAX (MW) 5883
MIN (MW) 4438
AVG (MW) 5072
Load Curve Facts
6
Quarter/DemandMax Min Average
% Difference between Max &
Min
July-September 2013 6864 5434 6055 26%
October-December 2013
5307 3745 4229 42%
January-March 20145241 3219 4018 63%
April-June 20145883 4438 5072 33%
Analysis of Load Curve
• The load curve graph is almost flat for the period July-September
• There is small leverage in other three quarters where wecan use DSM measures to flatten the load curve.
• Presently the load curve flattening is being done throughPeak load exemption charges [PLEC] for Industrialconsumers.
• It is observed that peak demand of system is primarily dueto Domestic lighting load and Non-domestic load in evening.For addressing the peak due to domestic and commercialload utilities are planning to implement ToD meteringinitially in Panipat city area under smart grid project.
7
Technical Support for undertaking Load Research through BEE & EESL
• A MoU has been signed with Bureau of Energy Efficiency (BEE) inJuly , 2014, wherein EESL will hire 2 DSM consultants for UHBVN,the cost of which will be funded by BEE.
• The UHBVN has already conveyed its willingness to allow EESL tohire consultants in July, 2014 .
• As per MoU, EESL will provide support to DISCOMs in followingbroad areas.
– Develop Approach and Methodology for Load Survey, LoadResearch, Load Strategies and development of DSM ActionPlan.
– Provide technical support to the consultants during Load Survey,Load Research, Load Strategies and development of DSMAction Plan.
8
Load Management Initiatives -Smart Grid
Location:
• Panipat City Subdivision, UHBVN
• Implementation Agency :- NEDO, Japan
Project Summary:
• Project covers 31,623 consumers in Panipat
• Input energy of about 144.14 MU
• Functionality covered:
–Advanced Metering Infrastructure (AMI)
–Peak Load Management (PLM)
–Outage Management System (OMS)
–Renewable integration through net metering
• Estimated cost of the project Rs. 46.76 crore
• Annual benefit of Rs. 9.3 crore
• Payback period- 60 months
Benefits of the Smart Grid Project
• Advanced Metering Infrastructure (AMI)
– Reduction in AT&C losses
– Reduction in cost of Billing
• Peak Load Management (PLM)
– Better load management
– Partial shifting of Peak Load to non-peak hours & saving on
expensive Unscheduled Interchange
• Outage Management System (OMS)
– Reduction in transformer & line outages and downtime
– Improvement in reliability & customer satisfaction
Smart Grid -Analytics & Visualization
Analytics for Load Forecasting and Load Research
Analytics for Peak Load Estimation and Customer Segmentation
Analytics for Demand Response & Time of Use
Analytics for Outage & Asset Management
Analytics for Energy Accounting and Leakage
Analytics for Capacitor Bank Planning and Volt Var Optimization
Load Management Initiatives –Peak Load Exemption Charges [PLEC]
Levy of PLEC on Power intensive Industrial consumers to flatten the
load curve is applicable since 1990’s
• Primary objective is to flatten the curve during peak by shifting
the load to off peak. The PLEC Charges were reduced from Rs 3.80 per
unit in FY 2013-14 to Rs 1.90 per unit by utilities and as per present tariff
order for 2014-15 the applicable rate is as under :-
• Existing PLEC For Normal Consumer charges are :-
– Up to 50% of the Contract Demand :- Rs 1.00 per KVAH
– Above 50% of Contract Demand :- Rs 1.50 per KVAH
• For Open access Consumer PLEC charges are :-
• Up to 20% of the contract demand:-Nil
• From 20% to 50% of the contract demand:- Rs 0.95/Kwh
• Above 50%:- Rs 1.5/Kwh
Load Management Initiatives –Peak Load Exemption Charges [PLEC]-Impact Analysis- Case Study of DHBVN
Average Industrial Load of DHBVN during Day Time:- 960 MW
Average Industrial Load during Night :- 400 MW.
Average Industrial Load during Peak Time[06:30 P.M. To 10:00
P.M.] :- 250 to 300 MW
Impact of Reduced PLEC Charges :- 15% Increase in
Consumption during Peak Load.
DSM implementation: Objective Oriented and Sustainable
Approach
Objective Approach
• Energy conservation by price (through Incentive and Penalty mechanism)
– Through Tariff setting
– Peak Load exemption charges
– Reliability surcharge
– Incentive provisions for Shifting of load to off-peak hours
Peak Load
Management
• Energy Conservation by usage of efficient Equipment (through awareness and
mandatory provision)
– Promotion of CFLs for lighting in High Value consumers
– Mandatory Purchase of star rated equipment
– Mandatory provisions for Purchase of star rated equipment for consumers
Promotion of
energy efficient
equipment
• Energy Conservation by coordinated efforts
– Promotion and distribution of CFLs in low demand consumers
– Rebate on switching over to Other energy sources
– Improved Supply hours & Reliability for participating consumers
Customer
involvement and
Satisfaction
• Integration with other scheme
– Loss Reduction
• Sustainability through Long Term Planning
• Through Innovation;
Cost optimization
14
DSM measures implemented in Haryana: Projects and
Coverage
DSM Measures
Agriculture
Urban
(DS)
Industrial
CommercialTariff
Energy
Efficient
Building
Street light
Rural
(DS & NDS)
• Village Supply
Improvement (VSI scheme)
• Bachat Lamp Yojana
• Incentivized Promotion of
Solar Water Heater System
in Domestic use
• Bachat Lamp Yojana
• Incentivized
Promotion of Solar
Water Heater System
in Domestic use
• Peak Load
exemption charges
similar to ToD Tariff
• Reliability Charges
• Promotion of
essential usage of
CFLs for Lightening
• Promotion of
essential usage of
CFLs for Lightening
• AG DSM pilot project under
BEE (replacement pumps)
• Incentive scheme for shifting of
AG demand to off peak
• Compulsion of star rated
pumps from December 2009
• ESCO implementation through
EESL
• Replacement of
Street lamps/ bulbs
with Energy Efficient
Street Light.
• Green Building of
HAREDA
• Compulsion of CFLs
in Government
Building since 2005
• Peak Load
exemption charges
similar to ToD Tariff
• Reliability Charges 15
Pilot Project : Village Supply Improvement (VSI) Scheme
Integrated Scheme for DSM + Loss Reduction
Installation of Meters outside the consumers’ premises in Meter Pillar Boxes
Connection through LT service cable emanating from meter box to nearby consumer
premises
Incentives for the Villages; getting supply at par with urban
Utility
• Reduction in demand
• Improved Billing Efficiency
• Improved Revenue
• Cost effective with payback of 1-2 years
• Reduction in consumer complaints
• Reduction in transformer failure
Consumer
• Improved Supply hours upto 20-22 hrs
per day
• Improved supply conditions; load
balancing , under loading of transformer
• No Billing complaint like house lock,
inaccessible meter
• Switch over to efficient lightening system
(CFL) resulting savings
Scheme Modalities:
Benefit of the schemes: Win-Win case for Utility and Consumer
16
20-in-1 Meter Pillar Boxes with New Cables Installed in
Singhran & Chirod Village, Hisar
17
Quantitative Benefits from Pilot VSI Project: Singhran & Chirod
Village
Reduction in energy input of 43%.
Increased billed units by 98%.
Collection efficiency increases by 26%
Total AT&C loss reduction of 61%. [ pre-implementation AT&C loss is 77% and after implementation of
scheme AT&C losses comes down to 26%]
Avoidance of CAPEX as no augmentation of DT, Conductor and cable required.
Reduction in nos. Distribution Transformer and reduced DT damage rate.
Total 105 nos. of new consumers has been added; Total 135 defective meters were replaced
Average cost per consumer of the project is around Rs. 5560/-
Estimated payback period of 23 months
Consumer Indexing was also carried out; Transformer wise energy audit possible
Improved Supply hours from 11 hours to 22 hours
• The scheme was implemented in 100 villages of the state.
• Work order for 57 feeders covering 144 villages has been issued till date.
18
Other DSM initiatives …….
AG DSM pilot
project (BEE)
• Proposed scheme of Replacement of existing pump sets by
energy efficient pumps with BEE support under ESCO
• Estimated savings as per BEE of 16.7 MUs is at total cost of Rs.
7.85 Crores for replacement of 2124 pumps on single 11 KV
Mohanpur Feeder in Kurukshetra
• However , in spite of repeated follow up, no response from
ESCOs due to absence of credible Baseline date.
• Feeder segregation and HVDS scheme for Separated AG feeders and metered DTs provides platform for
implementing further DSM measures achieving reduction of demand
• To change the old and inefficient pumps, Implementation of AG DSM through ESCO routes is initiated by
DISCOMs; Concerns about the post supply liability of services observed between suppliers
19
Other DSM initiatives……..
Bachat Lamp
Yojana (BLY)
• Under BLY CDM Project of BEE, total 454483 CFLs distributed in Sonepat
& Yamunaganar circles of Haryana to the domestic consumers
• Total 10.23 MW of savings is observed , resulting in annual savings of
15.73 MUs
Solar Water
Heater System in
Domestic use
• Incentivized scheme started in 2007
• Rebate of Rs 100/-, Rs 200/- and Rs. 300/- for Solar water heater capacity
of Rs 100 LPD, Rs 200 LPD and Rs 300 LPD respectively.
• Rebate applicable up to three years after installation of solar heater
system
• DISCOMs are providing rebate of Rs. 3.75 lakhs to 262 nos of consumers
Promotion of
essential usage
of CFLs for
Lightening
• Usage of CFLs was made essential since July 2007 for industrial and
commercial consumers having load more than 5 KW
• Total 34532 nos. of commercial & Industrial consumers has already been
shifted to energy efficient lights/ CFLs
• After Bulk procurement 899039 ( 9 lacs) nos of CFLs has been sold to
domestic consumers at Nigam Counters at subsidized rate.
20
Other DSM initiatives ……..
Reliability Charges
Replacement of Street
lamps• Total 14595 nos. of Street lamps replaced with Energy Efficient Street Light.
Promotion of 4 star
rated Equipment
• Mandated usage of 4 star rated agricultural pump sets since December 2009
• Total 65818 nos. of 4 star rated transformers of different capacity has been purchased
Sr. No Reliability of Supply Reliability of charge
1Total Period During which supply remained available during the
billing period works out to 95% and above
Rs 1.50 per unit
2Total Period During which supply remained available during the
billing period works out equal to 90% or above but less than 95%
Rs 0.50 per unit
3Total Period During which supply remained available during the
billing period works out to be less than 90%
Nil (Penalty* clause shall
apply)
*Penalty liability on DISCOM: Rs. 0.50 per unit for the entire consumption during the billing period
21
Green Building HAREDA Compliance with the Energy Conservation
Building Codes (ECBC)
Comply with the 5 star GRIHA rating,
highest for Green buildings of Govt. of India
Constructed based on solar passive design
techniques having Building Integrated
Photovoltaic (BIPV) system of 42.50 KW
capacity, Solar Chimney, evaporative cooling,
cavity walls, Use of Fly ash based bricks water
recycling and Energy Efficient Lighting
Benefits of the Building
• Achievement of an internal temperature of about 28 deg. Centigrade without Air Conditioning
• Estimated energy consumption about 30 kWhr/m2/year compared to 200 kWhr/m2/year for existing air
conditioned buildings
• 25% reduced lighting energy need and Annual Energy Consumption at 3.48 units per sq, ft. against 18.5 units
per sq. ft. of a conventional building
http://hareda.gov.in/?model=pages&nid=31
22
NET ZERO Building of UHBVN at Panchkula-
UHBVN is also constructing building based on Net Zero Energy
consumption having total construction area 14470 sqmtr having 2
floor basement, Ground floor and 5 floors with following features.
• Designed Net Zero Energy (NZE) building with solar photovoltaic’s
• Building envelop is optimally designed and oriented towards north-
south direction for cutting out the harsh eastern / western radiation.
• Zero Water Discharge to Municipal drains
• Self Shaded Building with terrace spaces and greenery at each floor.
• Rain water Harvesting pit for recharging aquifer.
• Passive cooling on central circulation space through natural ventilation
• Efficient Day lighting of all office spaces.
• Solar water heating system for kitchen & Guest Houses.
• Double Basement Parking to Reduce urban heat island created from
surface parking.
23
Salient features of proposed NET ZERO Building of UHBVN at
Panchkula- Contd……
Energy Efficient Systems to be deployed
• More than 60% reduction in the lighting loads with the help of LED system.
• More than 65% reduction in HVAC load by proposing low energy equipment like
DeVAP system which is a passively cooling system.
• More than 90% on floor area is day lit by providing dedicated light shaft at the
center of wing.
Energy Efficient Measures Undertaken
• Use of occupancy sensors, Daylight and sensors.
• Use of high efficiency chillers.
• Variable frequency drives.
• Demand control ventilation system.
• High side equipment size reduction through efficient building envelope.
• Window wall ratio is 25% only.
24
Salient features of proposed NET ZERO Building of
UHBVN at Panchkula- Contd……
• Operational total estimated Energy savings/year in lighting is 286443
units
.
• The estimated load of 750 KW will effectively be reduced to 250 KW
with the help of energy efficiency measures.
• By minimizing all the energy load , the whole load can be generated
onsite by proposing PV’s system as per following plan.
Rooftop Solar PV 2066sqm
Outside rooftop 1396 sqm
Total 3462sqm
• The estimated payback period of solar PV installations is 8 years