DISTRIBUTION GENERATION

PROJECTS IN RIHAND REGION 

ENGINEERING

Knowledge Management System

ELECTRICAL ENGG.

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 2/27

Distributed Generation

Projects

inRihand Region

B.K.Sinha 

NTPC Limited, Rihand 

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 3/27

10 KVAPower Conditioning Unit (PCU)

193 houses + 37 street lights +Commercial load (BatteryCharging + Irrigation Pump)

Area covered & Electrified (Actual)

233 houses + 30 street lights +commercial load as per DPR

Area to be Covered & Electrified

1 + 1 dayBack up for no sun shine period

5.5 Kms. against proposed 2.0

Kms.

Length of Distribution Network

120 V / 600 AHBattery

11.9 KwCapacity

Approx. 14 KmsDistance from Main plant

Jarha-Chetwa VillageLocation

SPV Project At Village Jarha-Chetwa

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 4/27

Tarriff / Service Charge for various application

Initial Charges : Rs. 500 per house in 4 instalments

First Instalment before connection : Rs. 250 per house

Rs. 10-15 / per chargingBattery charging

Rs. 20/- per hourIrrigation Pump

Rs. NilStreet lightsRs. 30 / point / monthDomestic Lighting

Tarrif / Service ChargeEnergy Service

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 5/27

22.02.2005VEC Registration

22.12.2004Certificate Issued by RESPO

24.11.2004Land Finalisation

16.10.2004First Gram Sabha Held

05.06.2005Charging of All the Feeders

30.05.2005Commissioning of system with Battery & PCU

28.03.2005Test Lighting with PV Modules only

25.09.2004Award of Contract to BHEL

15.07.2004Award of Contract to TERI as PIA

03.06.2004Letter for Implementation of DG Project at JarhaChetwa

Dates of Important Activities

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 6/27

L

Pothipather

86/ 69/ 62

Hadwadia

63 / 10 / 5

Khamarbahra46 / 40 / 28

Harijan Basti98 /33/10

Ambadand92 /41 /32

Biyar Basti59

Bardand70

From Rihand

To Mahuli

Hamlets of Jarha-Chetwa

L – Plant Location 1/2/3 - FeedersX / Y / Z – Total / houses Covered by Net work /Connected To Feeders

1

23

500 M 1200 M

1200 M

200 M500 M

500 M

Chetwa More

25

200 M

To Murdhawa

17

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 7/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 8/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 9/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 10/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 11/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 12/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 13/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 14/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 15/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 16/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 17/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 18/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 19/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 20/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 21/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 22/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 23/27

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 24/27

Important Parameters For Sustainability of DGProject

1. Effective Social Engineering

2. Proper coordination

3. Capacity Building of villagers to own the project

4. Capacity Building of VEC to manage the Project

5. Maintenance

6. Income Generation Schemes

7. Revenue Collection

8. Transparency

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 25/27

480

160

183

250

No of

houses tobebenefited

60

25

20

18

Distance

fromRhSTPP

100

25

30

40

Capacity

(Kw)

69.65Supachua

39.18Piprahar

39.77Mahuli

50.62Biyar Basti

Estimated

ProjectCost (Rs inlacs)

Village

Biomass Projects in Rihand Region

7/31/2019 Dist Generation

http://slidepdf.com/reader/full/dist-generation 26/27

Critical Points for Biomass DG Projects

1. Vendors for social Engineering

2. Vendors for Main Equipment

3. Specification

4. Sharing of Information related with Bio mass

7/31/2019 Dist Generation