Dipl.-Ing. Thomas FISCHER Almada, 26 th March 2009 Parking Policy Graz

Preview:

Citation preview

Dipl.-Ing. Thomas FISCHER

Almada, 26th March 2009

Parking Policy Parking Policy GrazGraz

Almada, 26th March 2009

2Parking Policy Parking Policy

GrazGraz

Overview

• General Data and Statistics

• Planning Principles

• Parking Policy

• P+R Life Cycle Costs

Almada, 26th March 2009

3Parking Policy Parking Policy

GrazGraz

City of Graz

• European Cultural Capital City 2003

• Area 127 km²

• ~ 245.000 inhabitants (1991: 238.000)

• ~ 121.000 jobs (1991: 134.000)

• District Graz–Umgebung

(surroundings)– 131.000 inhabitants (1991: 118.000)

– 36.000 jobs (1991: 26.000)

Almada, 26th March 2009

4Parking Policy Parking Policy

GrazGraz

Infrastructure

• Bicycle route network ~ 116 km

• Public transport network ~ 392 km– Tram (6 lines) ~ 49 km– Bus (37 lines) ~ 343 km

• Road network ~ 996 km– Priority roads ~ 194 km– Roads without priority ~ 802 km

Almada, 26th March 2009

5Parking Policy Parking Policy

GrazGraz

Mobility of the population

• On average every inhabitant makes 3.7 trips per day (1998: 3,8)

• He/she covers 23 km on average (1998: 22 km)

• And spends 78 minutes in traffic (1998: 75 min.)

• 1.11 million trips are made every day in Graz (1998: 1.1 mio.)

mobility survey 2004

Ownership of bikes, cars, driving-licenses and PT- tickets

Almada, 26th March 2009

6Parking Policy Parking Policy

GrazGraz

Modal Split – mode choice

31,0%

8,3%

33,8%

8,8%

18,1%

25,3%

11,7%

37,2%

8,2%

17,6%

23,6%

12,5%

37,3%

8,7%

17,9%

21,3%

14,2%

37,5%

8,7%

18,2%

19,3%

14,1%

38,2%

9,1%

19,3%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Weg

ante

ile in

%

1982 1988 1991 1998 2004

PT

car aspassenger

car as driver

by bike

on foot

mobility survey 2004

Almada, 26th March 2009

10Parking Policy Parking Policy

GrazGraz

Gentle Mobility –Ideas for the Future

• first strategies of environmental handling of transportation already in the early 70

• traffic concept 1992– 3 scenarios

• extrapolation of the trend

• car-friendly city

• „Gentle Mobility“

• transport policy 2000„Gentle Mobility“

Almada, 26th March 2009

11Parking Policy Parking Policy

GrazGraz

Planning principlesPolicy Guidelines

• Graz – a city of good accessibilitygood accessibility• Graz – a city of short distancesshort distances• Graz – a city with a balanced a balanced

distribution of the means of transportdistribution of the means of transport• Graz – a city with socially and socially and

environmentally compatible trafficenvironmentally compatible traffic

• Graz – a city with grass roots grass roots planning and public participation planning and public participation

Almada, 26th March 2009

13Parking Policy Parking Policy

GrazGraz

Planning principles:Gentle Mobility since 1980

• Priority for environmental friendly modes– Creation of a „green network“

• Permeability for foot and bike network• Direct connection to city centre and city

quarter centres – Making public transport more attractive

• User friendly stops• Modern vehicles• working reliability, securing connections,

correct timetables• Extension and priority measures

Almada, 26th March 2009

14Parking Policy Parking Policy

GrazGraz

Planning principles:Gentle Mobility since 1980

• Keeping through traffic out of residential areas

– Closing gaps in the priority road network– Direct link-up of industrial and commercial

areas with the priority road network

• Parking management– Park & Ride at the city edges and in the region– Different tariff zones– Extension of short term parking zones– Garages in residential areas

• Speed reduction– Tempo 30/50

Almada, 26th March 2009

15Parking Policy Parking Policy

GrazGraz

Parking Management

• Pedestrian Areas in the City Center• Advancement of on-road parking-

management– zones of short-term parking

– chargeable on-road parking („Parking-zone“)

• P+R areas at rail and/or Tram-lines– 2.100 existing parking places

– 2.000 parking places in planning stage

Almada, 26th March 2009

16Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

17Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

18Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

19Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

20Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

21Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

22Parking Policy Parking Policy

GrazGraz

Parking ManagementSpace for People

Almada, 26th March 2009

23Parking Policy Parking Policy

GrazGraz

• on-road parking management since 20 years

• 13.000 short-term parking places

• € 1,20 per hour• max. 3 hours• special fee for eco-

friendly vehicles (€ 0,80/h)

• special exceptions for resident (€ 214 / 2y)

On-Road Parking Management IShort-term Parking

Almada, 26th March 2009

24Parking Policy Parking Policy

GrazGraz

• since 2007 chargeable on-road parking

• 7.000 chargeable on-road parking places

• € 0,60 per hour• no parking-time

limitation• special fee for eco-

friendly vehicles (€ 0,40/h)

• special exceptions for resident (€ 96 / 2y)

On-Road Parking Management IIChargeable On-road Parking

Almada, 26th March 2009

25Parking Policy Parking Policy

GrazGraz

Kor

ridor

Wei

z

Korridor St. Stefan

Korridor Gleisdorf

12.3

15

25.952

18.872

Modal SplitMIV:ÖV87:13

Modal SplitMIV:ÖV90:10

Modal SplitMIV:ÖV89:11K

orrid

or B

ruck/M

.

28.145

Modal SplitMIV:ÖV83:17

Ko

rrido

r Leib

nitz

23.671

Modal SplitMIV:ÖV84:16

Kor

rido

r Dlb

erg

41.9

62

Modal SplitMIV:ÖV88:12

Corridor pers./dayproportion

cars PT

Bruck / Mur

Weiz

Gleisdorf

St. Stefan

Leibnitz

Deutschlandsberg

~ 28.000

~ 12.000

~ 26.000

~ 19.000

~ 24.000

~ 42.000

83

89

87

90

84

88

17

11

13

10

16

12

total

thereof cars

thereof daily commuters

~ 151.000

~ 130.000

~ 52.000

P+R in GrazTerminating Traffic

Almada, 26th March 2009

26Parking Policy Parking Policy

GrazGraz

             

WeinzödlFölling

Ostbahnhof

Webling

Thondorf

P + R

P + R

P + R

P + R Murpark

P + R

PuntigamP + R

P+R - facilities Stellplätze

Murpark

Webling

Ostbahnhof

Weinzödl

Mariatrost

Zentralfriedhof

List Halle

GKB

Thondorf

480

150

200

140

60

50

250

460

600

Fölling

Puntigam

240

500

P + R

Mariatrost

P + R

GKB P + R

List Halle P + R

Zentralfriedhof P + R

P+R in GrazExisting and Planned Facilties

Almada, 26th March 2009

27Parking Policy Parking Policy

GrazGraz

             

P+R in GrazWhy Life Cycle Costs?

• Because of the financial situation of city one question was asked

• How high must be the first-time investment, that the infrastructure have balanced budget after the life cycle of 30 years?

Almada, 26th March 2009

28Parking Policy Parking Policy

GrazGraz

             

P+R in GrazLife Cycle Costs - Definition

• Development• Planning• Construction

– Building– Technical equipment– Outside-facilities

• Utilisation– Operating Costs– Maintenance

• Re-Construction• Building Ground• Financing Costs

development

planning

constructionutilisation

re-construction

building ground

building

ground

Almada, 26th March 2009

29Parking Policy Parking Policy

GrazGraz

             

P+R in GrazLife Cycle Costs - Definition

• 3 Financing Models – Model 1:

• No Aid

• Financing onto the open market

– Model 2:• 35% Aid

(currently aid by the province of Styria for P+R facilities)

– Model 3:• Aid in the amount of the building costs

development

planning

constructionutilisation

re-construction

building ground

Almada, 26th March 2009

30Parking Policy Parking Policy

GrazGraz

             

P+R in GrazLCC – Garage 500 Places

€ % € % € %

Building 5.345.000,- 38% 5.345.000,- 50% 5.345.000,- 58%

Financing Costs 5.070.000,- 36% 1.424.000,- 13% 0,- 0%

Utilisation 4.094.000,- 29% 4.094.000,- 39% 4.094.000,- 45%

Ground Costs* 2.455.000,- 17% 2.455.000,- 23% 2.455.000,- 27%

Disp. Ground - 2.720.000,- -19% - 2.720.000,- -26% - 2.720.000,- -30%

Total after 30 years 14.244.000,- 100% 10.599.000,- 100% 9.174.000,- 100%

Model 1 Model 2 Model 3

* Ground Costs incl. Financing Costs

Almada, 26th March 2009

31Parking Policy Parking Policy

GrazGraz

             

P+R in GrazLife Cycle Costs - Conclusion

• Under the condition, that you can earn the running costs by parking fees

• About 80% aid is necessary to run a P+R garage without deficit in period of 30 years

development

planning

constructionutilisation

re-construction

building ground

Almada, 26th March 2009

32Parking Policy Parking Policy

GrazGraz

Stadtbaudirektion

Dipl.-Ing. Fischer ThomasCity of Graz

Executive Office for Urban Planning, Development and Construction

Europaplatz 20

A 8020 Graz

Austria

Phone: +43 316 872 3510

Fax: +43 316 872 3509

thomas.fischer@stadt.graz.at

Recommended