DFMA with Current Product: It’s never too late

S t e p h a n i e F re i e r

9/11/2018

“The time for action is now. It’s never too late to do something.”

2

Agenda• Early Insights

• Rework

• Quoting

• Product Improvement

• Process Improvement

• Conclusion

3

New Product Integration

• Bring voice of manufacturing to New Product Development Teams

• Adoption of DFMA

4

FRFaucet Assembly Manufacturing

Engineering

➢ Rework➢ Quoting➢ Product

Improvement➢ Process

Improvement5

Rework

6

Choices

7

DFA Results

Scrap Full Assembly Costs Rework Costs Salvage Costs

Assembly Labor Time per unit 0 10 min 4.5 min

Time to Replenish Inventory 4+ weeks 2 weeks 3 weeks

% Cost of product value (including labor

for rework) 100% 18% 53%Notes/Risks: -Will run short on some

parts - Potential for damage to finished components during rework- Potential for new packaging needed

- Potential for damage to finished components during rework

8

ReworkLabor Estimates

Risks

Customer/Business Impact

9

Quoting

10

FR

11

Enable Success Through Quoting

11

FR

Additional Benefits

12

QuotingAccuracy

Data Driven Rates

Faster RFQ response

13

ProductImprovement

14

15

Assembly Time Reduced

Assembly Efficiency

Per Unit Savings

25.3% 34.9% 27%

Product Improvement in Action

16

Product ImprovementIdea generation

Justification

Validation

17

ProcessImprovement

18

FR

19

Process ImprovementLean

Idea Generation

Quick Analysis

20

σ

FR

Summary

• Rework

• Quoting

• Product Improvement

• Process Improvement

21