Detailed Design of Hullar Bridge

Preview:

DESCRIPTION

Bridge Design

Citation preview

ISLAMIC REPUBLIC OF PAKISTAN EARTHQUAKE RECONSTRUCTION AND

REHABILITATION AUTHORITY

AZAD JAMMU AND KASHMIR URBAN DEVELOPMENT PROGRAM

BAGH CITY DEVELOPMENT PROJECT (BCDP) CONSTRUCTION DRAWINGS HULLAR BRIDGE, BAGH

October, 2010

CONTRACTOR: China Xinjiang Beixin Construction & Engineering (Group) Co., Ltd.

China Xinjiang Beixin Camp, Rawani (near airport),

Muzaffarabad, Azad Jammu & Kashmir Tel & Fax: +92 5 822-433596 E-mail: cxbajk@hotmail.com

DESIGNER FOR CXB:

Document No: J-0446-CDHBD-003 R0 Date: 13-10-2010

Consulting Engineers & Project Managers

52-D1 Gulberg III Lahore, Pakistan

Voice : +92 42 587 5181, 587 6457 Fax : +92 42 587 6889 Email : info@ndapak.com http://www.ndapak.com

Recommended