View
215
Download
2
Category
Tags:
Preview:
Citation preview
INTRODUCTION
• Benefits of Deh Cho Bridge• Overview of Tolling System– Toll Structure– Infrastructure– Enforcement/Regulation
• Questions and Comments
• Year Round Uninterrupted Access• Reduced Vulnerability to the Effects of
Climate Change• Reduced Energy Consumption and
Greenhouse Gas Emissions in Trucking and Ferry Operations
• Reduced Risk of Fuel Spills• Reduced Cost of Living• Increased Economic Development, esp. from
Tourism• Reduced Sense of Isolation
OVERALL BENEFITS
• Reduced Down Time for Equipment• Greater Certainty for Supply Chain / JIT Delivery• Increased Cycle Time• Reduced Fuel Consumption - Emissions• Increased Competitiveness with Southern Firms• Shortened Delivery Time• 24 Hour Service • Reduced Warehousing Costs
INDUSTRY BENEFITS
PRE-CLEARANCE• Partners in Compliance Program (PIC) Motor
carrier safety program initiated in Alberta that rewards motor carriers with exemplary safety records.
• The Department of Transportation has signed an MOU with the Alberta Motor Transport Association to expand PIC to the NWT.
• The transponders used in the Deh Cho Bridge tolling system are also being used to support the PIC program in Alberta.
TOLLING– Northbound Commercial Vehicles >
4500 kg.– Number of AxlesCategory # of Axles
A 2 to 4
B 5 and 6
C 7 and greater
Category # of AxlesRemittance Transponder
Equipped
Single-use Toll Permit
A 2-4 $75.00 $91.25
B 5-6 $150.00 $166.25
C 7+ $275.00 $291.25
TOLL RATES/COLLECTION
• Benefits of becoming a Toll Remitter
– Lower costs of toll permit
– Remit payment monthly
• Remittance documents available online at www.tolling.dot.gov.nt.ca
REMITTANCE AGREEMENTS
• Required for Self Remitting
• Transponder Industry Standard
• Unique to Each Vehicle.
TRANSPONDERS
• Transponders must be registered with International Road Dynamics (IRD)
– transponder.admin@irdinc.com
• To register a transponder with IRD, clients must provide:
– Vehicle registration information
– photograph of the passenger side of the vehicle
TRANSPONDERS
• On Road Enforcement - Focus on non-remitting carriers
• Electronic Enforcement- Focus on carrier compliance
ENFORCEMENT
• Automated Analysis- Vehicle Registrations- Permits, Toll, Fuel Tax- Over-dimensional/overweight Permits- Speed
AUTOMATED ENFORCEMENT
• $1,725 Failing to pay or arrange to pay for toll.
• $2,875 Evading, obstruction, interfering or tampering with tolling.
• $575 Obstructing a Transport Officer• $115 Failing to display owner information
on the side of your vehicle.
FINES
DEH CHO BRIDGE - NUTS 'N' BOLTS
Total Length: 1,045 m
Road (Deck) width: 10.4 m
Deck height above river: 30.55 m
Pylon Tower peak height: 53.85 m
Widest span between piers: 190
m
Tonnes of Steel: 11,636
Total length of 24 cables: 1,434m
Total weight of structure: 49,923
tonnes
Maximum traffic load: 2,000
tonnes
(48 Super B tankers)
Temperature range at Ft.
Providence (daily mean): +25 C to
-44 C
Canadian manufacturing content:
98%
Cost: $202 million
Design Life: 75 years
Recommended