DCALDesign review

26 July 2012

Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie,

Arturo Tauro, Corrado Gargiulo

MECH

DCAL DESIGN REVIEW 26 JULY 2012

2 DCAL DESIGN REVIEW 26 JULY 2012 NEW CYLINDRICAL ROLLERS

before

now

ROTATOR INTERFACES

VERIFICATION

LOAD TRANSFER BALLS

3

SLIDING PLATFORM

2000 mm

DCAL DESIGN REVIEW 26 JULY 2012

4

SLIDING PLATFORM DCAL DESIGN REVIEW 26 JULY 2012

5 DCAL DESIGN REVIEW 26 JULY 2012

Sliding platform vs rotator i/f verification ok

6 DCAL DESIGN REVIEW 26 JULY 2012

40°

20°

60°

0°Sliding platform & rotator @ (°) ok

7 DCAL DESIGN REVIEW 26 JULY 2012

?

Rotator Rails interference with

miniframe: Rails cut not in the last 3D CAD model

8 DCAL DESIGN REVIEW 26 JULY 2012

2000 mm150 mm

* Sliding platform vs services ok

9 DCAL DESIGN REVIEW 26 JULY 2012

OK

? TO BE SHORTENED

OK

10 DCAL DESIGN REVIEW 26 JULY 2012

1/3 SUPERMODULE PUSHING JIG

11

Drawings approved for production at DCAL Design review 12 June 2012

DCAL DESIGN REVIEW 26 JULY 2012

12 DCAL DESIGN REVIEW 26 JULY 2012

90% production done

…on going-rollers machining-welding (TBD)-painting1 week estimated working time to completion

13 DCAL DESIGN REVIEW 26 JULY 2012

?

-welding TBD the cut in the bracket for services

14 DCAL DESIGN REVIEW 26 JULY 2012

40°

20°

60°

Dcal bridge

15 DCAL DESIGN REVIEW 26 JULY 2012

Bridge production drawing

final revision on going

16 DCAL DESIGN REVIEW 26 JULY 2012

n.8 length ~3700mmMinimum number needed n.2+2 spare

n.2 length ~3300mm TBD

n.4 length ~3600mm TBD

n.8 length ~1600mm

TBD by Manoel

production drawings by whom?Bridge rails

17 DCAL DESIGN REVIEW 26 JULY 2012

Constraints to define rails length for 60°

18 DCAL DESIGN REVIEW 26 JULY 2012

DRILLING N.6 M20 HOLE X BEAM FOR BEAM HANDLINGNEED FORMAL APPROVAL

DCAL rails

19 DCAL DESIGN REVIEW 26 JULY 2012

DCAL rails LOAD TEST

RAILS INSTALLATION IN SXL2 COMPLETED BY THE END OF THE WEEK

20 DCAL DESIGN REVIEW 26 JULY 2012

PROCEDURES

Needed soon

Load test in SXL2Survey in SXL2Survey in L3

For procedures use the template “Alice Task Description”