View
133
Download
0
Category
Preview:
Citation preview
RESUME
REY MANTIZA JUMANGITQUALITY ASSURANCE / CONTROL ENGINEER (QAQC)
Halul Island, Qatar+974 33287149
rey_jumangit@yahoo.com.ph
PERSONAL DATA
Age : 46 Date of Birth : 4 June 1969Gender : Male Civil Status : MarriedNationality : Philippines Languages Spoken : English, Tagalog &
Chavacano (e.g. Spanish)EDUCATIONAL BACKGROUND
Education Level : Registered Electrical Engineer (1993)Education Field : Engineering (Electrical)School/University : Western Mindanao State University (WMSU)
SKILLS
Computer Skills : MS Excel, Power Point, AUTOCADLanguages : fluent in English & Tagalog, written & oral.Soft skills : communication, interpersonal skills, teamwork, decision making, can work
under pressure, fast learner, can meet deadlines & with positive attitude.
SUMMARY
A highly trained individual with over 10 years of experienced, excellent interpersonal skills, can manage work issues and able to resolve effectively, proficient in computer skills, ability to meet deadlines, great attitude towards work and ensures all standards are met. Vast experience in power utility company; estimation, designed, maintenance and implementation of High Voltage Overhead Transmission / Distribution Line and quality experience in Oil and Gas Plant, HV/LV Power Plant / Substation, Water Desalination Plant, Infrastructure both onshore and offshore.
Working knowledge of various Codes and Standards e.g. NEC, IEEE, IEC, BS, EU, NEMA, NFPA, CENELEC, CEC etc.
EXPERIENCED
A. Duration : September 2008 – TILL CURRENTPosition : QUALITY CONTROL ENGINEER (QAQC)Company : TARGET Engineering Construction Company LLCHead Office : UMM Al Quawain Bldg, 5th Flr Hamdan St. Abu Dhabi, UAEBranch Ofc. : D-Ring Road, near Al Rabeeh Naseem Hospital Doha, Qatar
RESPONSIBILITIES Coordinating with QAQC Project Manager for the timely submission of all Quality Documentations
/ Deliverables.
Preparation of Inspection and Test Plan / Check Sheets and ensuring approval from the Company.
rmj.cv Page 1
Ensure that all Contractual / Contractor / Company and local authority requirements for Quality Health Safety Environment (HSE) Requirements are complied with.
Ensure all inspections are done as per ITP / Contract and these are documented on predefined formats / check sheets. Ensuring all Hold and Witness points are adhered to and the Company / TPI is given sufficient notice for inspection.
Ensuring incoming materials and equipment are inspected, as approved and stored properly as recommended.
Ensuring all Quality requirements are understood by site personnel / workmen and subcontractors and providing training in the quality systems and skill functions necessary.
Ensure proper control on receipt / distribution of contractual documents and drawings with assistance from document controller.
Ensuring all valid documentation / contract documents are being used on site.
Carrying out regular surveillance inspection on QC activities on site.
Monitoring nonconformance and following up with site team for close out and ensuring corrective / preventive action are taken to avoid repetitions of non- conformances.
Coordination with material supplier/manufacturer for a Factory Acceptance Test (FAT) inspection of equipments / materials and correct all the problems that arises during the inspection prior to the delivery on site.
Reporting weekly and monthly Quality performance and documentation to Project manager.
Responsible for reviewing all quality records on site and retaining them on Handover Files.
Ensuring preparation of final handover documentation and submission of quality related documents.
ACCOMPLISHMENTS
Location: DOHA QATAR – ONSHORE & OFFSHORE
Company : TARGET Engineering Construction Company Project – Till Current : Construction of New Telecom, Security Building and New
Northern/Western Extension Rd at Halul Island, Offshore Project
Client : Qatar Petroleum (QP), Halul Island, Qatar
Company : TARGET Engineering Construction Company Project : RAF A1 – New Water Desalination Plant,
Ras Abu Fontas, Doha QatarClient : Qatar Electricity & Water Company (QEWC)Consultant : Parsons Brinckerhoff (PB)Main Contractor : Fisia Italimpianti (FIT)
Location: ABU DHABI, UAE
Company : TARGET Engineering Construction Company Project : Alumina Offshore Conveyor Installation – Phase 2 Taweelah
Abu Dhabi, UAE Client : Emirates Aluminum (EMAL) Smelter Company EPCM Contractor : SNC Lavalin International (SLII)
Company : TARGET Engineering Construction CompanyProject : Borouge Utility & Offsite 3 – Ruwais, Abu Dhabi Client : Abu Dhabi Polymers Company Limited Main Contractor : Hyundai Engineering & Construction Co.
Company : TARGET Engineering Construction Company Project : Additional Roof-Shell Bonding Measure for
The Lightning Protection of Floating RoofTanks at Ruwais Refinery Abu Dhabi, UAE
Client : Abu Dhabi Refining Company (TAKREER)
rmj.cv Page 2
Company : TARGET Engineering Construction Company Project : Electrical Above Ground (EAG) - EMAL Smelter,
Taweela, Abu Dhabi, UAEClient : Emirates Aluminum (EMAL) Smelter CompanyMain Contractor : SNC Lavalin/Worley Parsons (SLWP)
Location: ABU DHABI, UAE - OFFSHORE
Company : TARGET Engineering Construction CompanyProject : Replacement of Train 3 Main Cryogenic Heat
Exchanger (MCHE) Project Das Island, Abu Dhabi, UAE
Client : Abu Dhabi Gas Co. (ADGAS)
Company : TARGET Engineering Construction Company Project : Offshore Associated Gas (OAG) – Das Island, Client : Abu Dhabi Gas Co. (ADGAS)Main Contractor : MEPI Technip
B. Position : PROJECT PLANNING and CONTROL ENGINEERCompany : Zamboanga City Electric Cooperative, Inc. (ZAMCELCO)
Power Utility Company Duration : Feb. 1994 – Aug. 2008Location : MCLL Highway, Putik Zamboanga City, Phil.
RESPONSIBILITIES
Designing of transmission line and distribution line.(IEEE Standard, PEC Standard) Supervision and Construction of 69KV transmission line and 13.2KV distribution line. Planning and making feasibility study of the system. Designing of Power Substation steel structure assemblies. Preparation of Electrical Designed, Project Cost / Estimates and Bill of Materials for tendering
purposes. Responsible in managing the smooth operation of the project through a systematic planning,
maintain a sound coordination among field personnel. Conduct field engineering surveys on line extension and line upgrading of overhead transmission
and distribution lines. Supervising the execution of work in accordance with project specifications and standards. Monitoring of production/progress and scheduling of construction activities of the project.
Plan, Execute and Supervised the project. Conduct final inspection and final acceptance of the project prior to handing over.
C. Position : SITE ELECTRICAL ENGINEERDuration : May 1993 – Jan. 1994 Company : Zamboanga City Electric Cooperative Inc. (ZAMCELCO)
Power Utility CompanyLocation : MCLL Highway, Putik Zamboanga City, Phil.
RESPONSIBILITIES
Installation / construction of metal clad steel structure for the outgoing feeders in Substation Pre-commissioning and commissioning of HV/LV Switchgear installation at Substation. Commissioning and installation of 69/13.2 KV, 20MVA Power Transformer. Installation/erection of 69KV, SF6 Circuit Breaker for protection of 20MVA Power Transformer. Assist in the erection/construction of receiving and sending end 69KV tower steel structure. To ensure all work activities are in conformance with contract requirements, drawings &
specifications. Installations of switchgears, station & power transformers, distribution boards, UPS panel,
instrumentation panel, conduits, cable laying, glanding & termination.
rmj.cv Page 3
Installation of electronic single phase and three phase kilowatt hour meter. Served as assistant for calibration of single phase & three phase kilowatt hour meter. Banking in closed delta connection the single phase line distribution transformers and other
electrical line equipment.
SEMINARS/TRAININGSList some of my seminars and trainings attended:
Topic/Course Title Duration Conducted By Conducted in
1. New concept in Switchgear Design and Protection and Power Monitoring and Control System
03 Feb 2001 Schneider Electric Garden Orchid Hotel, Zamboanga City, Philippines
2. Power Factor Correction with Harmonics Compensation & Power Substation Testing
13 Nov. 2003 Institute Integrated of Electrical Engineer (IIEE)
Grand Astoria Hotel, Mayor Jaldon St., Phil
3. Supervisory Control & Data Acquisition / Remote Technical Unit (SCADA/RTU) & Transformer Protection
09 Dec. 1999 Institute Integrated of Electrical Engineer (IIEE)
Grand Astoria Hotel, Mayor Jaldon St., Zamboanga City, Phil.
4.
5.
6.7.8.
9.
10.
11.
Seminar on Distribution Line Design: Mechanical ConsiderationSeminar / Workshop on Protective Relaying
Certificate of EmploymentCertificate from ADGAS QA/QC Training Seminar on QMSQA/QC Training Seminar on IMS
H2S / BA Training
H.U.E.T & Sea Survival Training
11-14 Jan. 2005
11-13 May 1999
22 April 200822 Nov, 200917 May 2010
07 June 2011
07 June 2014
14 June 2011
National Electrification Administration (NEA)
National Electrification Administration (NEA)
ZAMCELCOADGAS - UAETarget Engineering
Target Engineering
EnerTech Qatar
Venture Gulf Training Center
Cebu Business Hotel, Junquera corner Colon St.,Cebu City, PhilipinesShamrock Beach Resort, Guimbal Iloilo City, Philippines
Target Engineering Conference Room.Target Engineering Conference Room.Room 5 Training Rm.
Training Pool, Venture Gulf
rmj.cv Page 4
Recommended