Coronavirus Update 16/08/2021
General:
While cases are high and rising, everybody needs to continue to act carefully and remain cautious.
Sites and work need to be planned and organised to avoid crowding and minimise the risk of spread of infection by following PHE and HSE guidance.
Testing when you have symptoms.
whilst Government is no longer instructing people to work from home if they can, Government would expect and recommend a gradual return over the summer
Government expects and recommends that people wear face coverings in crowded areas such as public transport;
When assessing and mitigating the risk consider ERIC. Eliminate, Reduce, Isolate, Control.
Eliminate
Unwell workers with symptoms should not travel to or attend the workplace, they should get tested from an NHS facility immediately.
If you have been double vaccinated, you do not need to isolate if you have come into contact with someone who has tested positive. If you produce a positive test, you must self-isolate.
Reduce
Social distancing and the wearing of masks has been removed. However, ALS advice is to still be cautious and adopt a sensible approach. Remember, some people and in particular the elderly and clinically vulnerable will still be social distancing and wearing their masks.
Continue to minimise the number of workers involved in the tasks Don’t get too close to one another. Regularly wipe down common touchpoints e.g. van door handles, pens, equipment that has been touch by unprotected hands, vehicle cabs and tools etc Be mindful of members of the public that continue to wear their masks, they are still concerned.
Isolate
Keep groups of workers that need to work within 2m: Together in teams (do not change them) As small as possible Away from other workers. (Particularly with ALS projects where you are on construction sites)
Control
As the regular measures have been removed, again move forward with a sensible approach. If working closely with others:
Don’t remain together for a lengthy period. Don’t cough or sneeze on your colleagues. Write your measures in the POWA.
PPE
Each activity should be risk assessed (please add to your daily POWA). Re-usable PPE should be thoroughly cleaned after use and not shared between workers Single use PPE should be disposed of safely. Where operatives are required to work in an area where (persons are shielding, with symptoms, or confirmed Coronavirus cases may be present e.g. healthcare or in a home environment) additional PPE should be considered specific to the COVID-19 risk.
Behaviours
The measures necessary to minimise the risk or spread of infection rely on everyone in the industry taking responsibility for their actions and behaviours. Please encourage all operatives, sub-contractors, agents and our partner agencies to collaborate and openly discuss any issues that arise.
Welfare Unit
ALS Civil Engineers generally hire in a unit.
All surfaces to be wiped down with supplied disinfectant Hand sanitiser and gel will be provided. Wash hands prior to and after using the toilet facility Wipe down any surfaces touched after use e.g kettle, microwave, pen and table. Continue with this process.
General
The risk of viral transmission is negligible provided that all members of the working party are symptom free and maintain good hygiene practices. Should a member of the working party develop symptoms whilst on-site, the agent should be contacted immediately, if indisposed then contact the
company secretary (Jan Whittaker 01843 850746). In these circumstances transport home will be arranged. Safety measures for the driver and operative will have to be maintained:
The transporting vehicle will need to be appropriately ventilated RPE to be worn by both The operative’s PPE will require immediate cleansing The vehicle’s cab will require complete cleansing
Public Health England further Advice
Advice in the construction environment where there is use of enclosed machinery such as diggers:
Operatives should continue to wash or sanitise their hands regularly on site. Ensure vehicles and enclosed spaces are well ventilated. The inside of cabs should be regularly cleaned, particularly if used by different operatives. Minimise vehicle sharing where possible.
Although many of the Government restrictions have now been removed, it is only sensible that we continue to be cautious regarding the Coronavirus. We have to be considerate for our colleagues and members of the public who have been touched by this virus. For many it is not yet over and for some it is still to happen. These new guidelines published by ALS Civil Engineers have taken this into account.
Adopt a sensible approach and stay safe for your family, yourself, your colleagues and members of the public.
ALS/Coronavirus/version004/Aug21
Construction Phase Plan (0-30 days)
This Construction phase plan is intended for use on projects with a construction duration (civils) of less than 30 days or 500 man days. The time limit relates to each individual phase of the works. This document is designed for use in conjunction with the daily site specific point of works assessment (POWA). This document covers works involving a maximum of 10 people on site. Projects involving activities of a specific, technical or higher risk nature (Schedule 3 risks) may require additional information to maintain compliance.
If you are unsure as to the suitability of this document for your current project then please contact your agent or safety advisor for clarification.
This document is subject to a review after 10 working days.Review Date Reviewed By Update Details
Project DetailsProject Name 150074481
QSite Location Courtstairs Manor
Planned Start Date 23/09/21
Planned Finish Date 28/09/21
Jointing Date 24/09/21
Engineers Contact Details
Principal Contractor ALS Civil Engineers Ltd
Principal Designer James Cooper
Description of Works As per Works Order and associated documentation.
Client Identified Risks Client Identified Risks are intended to be conveyed through the UKPN HEML document. All notified risks will be managed via the POWA and associated generic RAMS.
Key Dates As per the Works Order and POWA. Works carried out before the UKPN planned Jointing date will comprise of predominately Excavation and cable installation. Works carried out after the UKPN planned jointing date will comprise of predominately backfill and reinstatement.
Construction Phase Plan (0-30 days)
Site Critical InformationFor Agent
For Gang
General ArrangementsNames and Contact Details of others on site
As per the Works Order and Works management system.
Site Communications Via daily POWA briefing, Tool Box Talks and WMI.
Site Induction Will be conducted by the Team Leader Via the POWA.
Welfare Arrangements Use Local Welfare facilities.
Construction Phase Plan (0-30 days)
General Task Arrangements
All risks will be assessed and controlled using the associated generic RAMS included within the WMI and will be enacted and authorised via the POWA.
Emergency ArrangementsFirst Aiders All operational employees will have undergone First Aid Training.
First Aid Kits All site vehicles will have a suitable First Aid Kit.
Emergency Response AIRLINE 0161 774 0475
Flashcall SPN 0330 159 1710Flashcall LPN 0330 159 1706Flashcall EPN 0330 159 1766
Emergency Services 999
Evacuation Signal Primary means of raising an alarm will be to shout ‘FIRE, FIRE, FIRE’
Assembly Point The assembly point will be the nearest safe point outside of the works area or as detailed in the POWA.
Environmental Procedures are to be followed in line with the GENRA14 and the UKPN document HSS 01 039
Nearest Accident and Emergency Location
Call 112 or 999
Site RulesWorks Control All operatives and visitors are to receive a site specific safety briefing
recorded on the POWA. The person in charge of safety will be designated as the Foreman.Only trained operatives for the tasks being conducted are to be permitted to work on site.
Confined Space Confined space entry is only permitted for trained individuals. Additional equipment must be sourced prior to any confined space entry.
Accident/Incident All accidents, incidents and near misses must be reported via the agent responsible for the site.
Access Local rules are to be followed. UKPN sites may only be accessed by individuals in possession of the relevant qualifications or LOA.
PPE PPE must be assessed via the POWA and enacted in line with the RAMS and local site rules.
Equipment, Plant andMaterials
All Plant and equipment must be utilised in line with its intended use.Do not tamper with or alter any Plant, Equipment or Materials unless authorised.All plant is to be isolated and secured when not in use.
Excavation All excavations must be conducted in line with HSG 47 and DSR 01 014 and 014a. Excavation procedures must follow the POWA and generic RAMS
Construction Phase Plan (0-30 days)
Cable Installation All ducting/cables must be installed in line with ECS 02 019. Installation procedures must follow the POWA and generic RAMS
Asbestos The following procedures must be adhered to.HSS 01 063HSS 01 064All asbestos related work is to be reported to the Safety team via your Site Agent.
Lifting All mechanical lifting operations must be reported to the safety team via your site agent prior to commencement.
Drugs and Alcohol No persons under the influence of drugs or alcohol are allowed on site. All accidents/incidents will invoke as far as is practicable immediate D&A testing.
Mobile Phones Mobile phone use is to be kept to a minimum. Unless it is an emergency personal calls must be made during break times and away from the work area.
Site Signage Obey all safety signs and instructions.Driving on site Speed limits are to be obeyed at all times. Assess and adhere to
vehicular routes.Reversing vehicles Reversing operations are to be assisted by a team member and must
be visually assessed prior to carrying out.Smoking No smoking or vaping is to be undertaken within buildings, temporary
accommodation, plant or vehicles.Working at Height WAH is to be avoided where possible. Excavations must be carried out
in line with the generic RAMS and the POWA. All above ground WAH must be signed off by the safety team prior to commencement.
Manual Handling Avoid where possible. Assess lifting requirements and use sufficient personnel to provide a safe lift.
Leptospirosis Wear PPE at all times during work processes. Wash hands prior to eating practice good personnel hygiene. Adhere to document ALS 01556
Fuel Storage All fuels must be stored securely in suitable marked containers. Drip trays must be used when re-fuelling plant on site.
Noise Use equipment and tools correctly. Work to be carried out in line with the POWA.Carry out activities where possible between the hours of 08:00 – 17:00. Ensure tools and equipment are in good condition.Utilise PPE.
Hazardous substances Use substances in line with the COSHH assessment.Any deficiencies/omissions in the COSHH assessment must be conveyed to the H&S team for approval prior to commencement.
HAVS Record all HAVS activities on the HAVS record sheet. Carry out activities in line with the adapted HAVS values and HAVS safety triangle. Documents are available in your WMS kit bag.
Security Ensure the work area is protected by continuous barriers or fencing at all times.All mobile plant is to be removed from the work area during non-
Construction Phase Plan (0-30 days)
working times. Store all plant, equipment and materials safely and so as not to cause a hazard to the public or other work streams operating in the vicinity.
Plant operations All personnel operating plant will be trained and competent in it’s use.Plant operations will be carried out in line with the RAMS and POWA
Signature
Length
Length
Length
Length
Any Additional information Cables
Earth Cable
Cable locationSundridge
HV Cable
LV Cable
Service Cable
x
Work Order
*Please identify work completed/outstanding and return all job status information to its originator
PRE VISIT ASSESSMENT (form detail from HSS 01 105a)
ALL JOINT BAYS ON SITE MUST BE PROTECTED WITH POSTS AND BARRIERS
**Please blind and cover ALL cables with marker tape as required**
x Gas SewageSite 2500 Map
Reinstatement Ref No
Closing Datex
Street works quote x
ALS Work Order (WO)ALL WORK ASSOCIATED WITH THIS ORDER SHALL BE CARRIED OUT IN ACCORDANCE WITH THE
DISTRIBUTION SAFETY RULES, OPERATIONAL INSTRUCTIONS, ENGINEERING INSTRUCTIONS, WORKING
MANUALS, SAFETY POLICY MANUAL AND ASSOCIATED DOCUMENTS, TOGETHER WITH ANY SITE SPECIFIC
RISK ASSESSMENT
South Eastern Region
xx
CT11 0JE
Pegwell road
Ramsgate
ALS Agent
Job Description
Utilities as RequiredSite Proposal Drawing (Clean) Opening Notice No
Opening DateWater
J S WornhamSite contact name / number / email
FINISH:
Site Recorders Drawing BT
x
Purchase Order No
Proposed jointing
date24/09/2021
GSOP
START:
Courtstairs Manor
Mark Warbey
Site name & Address details
Phil
07767 478 188
Date
08/09/2021
CNB2
Rigs code
29/09/2021
23/09/2021
yes
Service Order No
150074481 Justin Wornham
Contract Mgr/Supervisor
07875111627
Contact number
Excavate/reinstate joint bay only required in pegwell road as per UKPN 8500165462-1-500 Stage 2 Proposal Plan
https://smhub.scp.ukpowernetworks.co.uk/SAPUKPNUIPermitApplication/index.html#/PlannedPermit/create/sapkey/TYah1nZhARWLRHdQ51GJ
weather may be wet or warm due to time of year. Be prepared for all kinds of weather. Drink plenty of fluids.
Any acceess / egress issues should be noted on POWRA and briefed to work party.
For any work around residential/industrial/rural areas, be aware and take care of public and environment at all time.
Ensure all open excavations are safely barriered off and sufficient gaurding and signage in place.
For work on building site, ensure all site rules are followed. Take great care of third party contractors.
Parking may be limited. Ensure vehicle is parked in a safe and suitable position. Display parking sign on dashboard.
toilet and washing facilities should be available on site or at the nearest primary.
ensure site is kept tidy and all waste is removed when leaving.
Y / N
Confined Spaces
Type A Confined Space
Access is by stairway
Door with Confined space sign
Substances (COSHH)
Oil
PCBS
Other polluting liquids
Compressed gas
SF6
Structures / Buildings
Unstable structures / Dilapidations
Temporary Works Identified
Welfare, Storage & Waste
toilet and washing facilities
Area for kitchen, drying room, site office
fluids and provisions
storage and waste material
Transient Site details
Existing Welfare Details
CO2/Fire Suppression Systems
Manual Handling/Lifting
Heavy or multiple items
Mechanical lifts
Fixed lifting equipment
Ensure any heavy lifts are 2 man or more, necessary for the load. Mechanical lifts if too heavy for men.
Any staff operating mechanical lifting must be authorised to do so and any equipment must be tested and inspected
to a good standard. Hiab lifts in accordance with lifting plan.
Flooding / Water Discharge
Asbestos / Suspect Materials
Noise or Dust generation
Fauna Flora
Live working for parts of the job - justified by no. of customers affected, safe procedures to do so, and need to
identify neutral. Follow live working procedure and wear appropriate PPE.
Excavating around live cables. All excavations must be carried out in accordance with DSR 01 014 and associated
procedures.
Traffic / Pedestrian / NRSWA
Fast road risk of collision
Traffic Management required
Signs/Barriers/Lights
Pedestrians not safe
Traffic lights
Electricity
Live conductors
Buried / Overhead Services
Distressed equipment
Operational Restrictions
Exposed bars
Drug paraphernalia
PRE VISIT ASSESSMENT (form detail from HSS 01 105a)
Site Specific Risks/Hazards
Location, Access & Egress
Restricted access / egress
Residential / Rural / Urban / Industrial Area
Schools / Hospital / Other land use
Uneven / poor ground conditions
Open excavations
Building Site
Sub-stations
Parking on / off site
Overhead Obstructions/Lines
Environment
Extreme Weather
Poor light / space
Risk of fire
Spillage
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Nearest A&E = QEQM Margate
for emergency call 999/112 - Flashcall number = 03301591710. Ensure all staff are aware of emergency
arrangements.
Any young persons need to be identified and made aware of any risks on site. The presence of young persons must
ne boted on the POWRA.
Covid -19
Ensure there is no known cases of Covid -19 in any building before entering. If there are, contact a manager/engineer about the best
method of entering and refer to A89 / HSS 01 0165a.
Ensure you follow Covid-19 government guidelines and maintian 2m social distancing at all times where possible.
Wash Hands regularly or use hand sanitiser if washing facilities are not available. Practice personal good hygiene at all times.
Ensure you wear enough PPE to reasonably protect yourself and others from the risk of infection. Masks, Gloves, Overshoes and other
PPE are available.
Complete form HSS 01 165a for every property at risk of COvid-19 that work is to be carried out.
Completed By:Justin
Wornhamcontact details: 07875111627
other
Nearest A&E
emergency arrangements
young persons
Working At Height
Scaffold
Mobile Platform
Steps/Ladders
Climbing Irons
Third parties working at height
Falling objects
Unknown O2 level in atmosphere
Type B Confined Space
Accessed by tripod or other lifting equipment
through hole in ground
Type C Confined Space
Tunnel / Duct / Culvert
Number of access/egress points.
Accessed by vertical ladders or step irons or by
other means.
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
Check
User ID
Wornh1j
Scheduling Team EmailMaidstoneandCanterburyAreaSchedulingTeam@UKPowerNetworks.mail.onmicrosoft.com
CrawleyBrightonSchedulingTeam@ukpowernetworks.co.ukCroydonandKingstonAreaSchedulingTeam@ukpowernetworks.co.ukEastbourneandTunbridgeWellsAreaSchedulingTeam@UKPowerNetworks.mail.onmicrosoft.comMaidstoneandCanterburyAreaSchedulingTeam@UKPowerNetworks.mail.onmicrosoft.com
EastbourneandTunbridgeWellsAreaSchedulingTeam@UKPowerNetworks.mail.onmicrosoft.comMaidstoneandCanterburyAreaSchedulingTeam@UKPowerNetworks.mail.onmicrosoft.com
The positions of pipes shown on this plan are believed to be correct, but Southern Water Services Ltd accept no responsibility in the event of inaccuracy. The actual positions should be determined on site. This plan is produced by Southern Water Services Ltd (c) Crown copyright and database rights 2020 Ordnance Survey 100031673 .This map is to be used for the purposes of viewing the location of Southern Water plant only. Any other uses of the map data or further copies is not permitted.
WARNING: BAC pipes are constructed of Bonded Asbestos Cement.
WARNING: Unknown (UNK) materials may include Bonded Asbestos Cement.
Date: 06/01/21 Scale: 1:500 Data updated: 21/12/20Map Centre: 636711,164187(c) Crown copyright and database rights 2021 Ordnance Survey 100031673 Clean Water Plan A3
jessica.wellings@ukpowernetworks.co.uk
ALLREGIONS
LOGISTICS ORDER FORM 15Operations & Connections Cable, ABC &Stocked OHL rev 0
All Queries & Questions to DISTRIBUTIONPLANTREQUESTS@UKPOWERNETWORKS.CO.UKRECIPIENT ORDER TYPE / INSTRUCTIONS
Primary Contact and External Contact Number Delivery Drop Point (choice)Justin Wornham 07875111627 SUNDRIDGE - O'KEEFE (UKPN)Justin Wornham 07875111627 5003471Secondary Contact and External Contact Number Dunbrik Depot, Main Road, Sundridge, TN14 6EP
IS THIS A FAULT JOB THAT IS REQUIRED WITHIN 4 HRS? NODelivery Date on GWC Site required
DELIVERY ADDRESS 16/08/2021Final Full Site Address including postcode
Courtstairs
Pegwell Road
Ramsgate
Postcode* CT11 0JEAny extra information relevant to the order or delivery of the above
CHOOSE PRODUCT(S) EITHER BY SPECIFIC MATERIAL (VIA BUTTON) OR BYBROWSING TYPE/PRODUCT LISTS
ALL LINES REQUIRE A SERVICE ORDER NUMBER FORCOSTS
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
05577P
LV Mains Cables WaveformLV_MAINS_WF
65 Drum95MM 3C ALI WAVEFORM (500m Drum) *05577P* Apx Wgt /
Each *****
Service Order 150074481 Operation No. 00170 1
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
05886L LV Service CablesLV_SERV
100 Drum35MM 1C ALI PHASE CONDUCTOR (100m Drum) *05886L* Apx Wgt /
Each *****
Service Order 150074481 Operation No. 00560 2
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. 3
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. 4
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. 5
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. 6
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. 7
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. NON SELECTABLE QTY REQUIRES DISCUSSION 8
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Send Form for Processing (UKPN DEVICE ONLY)
CLICK HERETO ENTERMATERIAL
CODE
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
CLICK FORIMPORTANT INFO
FOR ORDERING
Apx Wgt /Each *****
Service Order Operation No. 9
SAP Material Code choose TYPE then PRODUCT below Desired Qty Cable: Coil or Drum?
Apx Wgt /Each *****
Service Order Operation No. 10
Office UseJustin Wornham:07875111627 / tbc : Courtstairs,Pegwell Road,Ramsgate. CT11 0JE Back to
Top
Send Form for Processing (UKPN DEVICE ONLY)
CLICKHERE TOENTER
MATERIAL
CLICKHERE TOENTER
MATERIAL
05577P 65 150074481 0005 1080 000045 Drum05886L 100 150074481 0005 1080 000045 Drum
0 0 0005 1080 0000450 0 0005 1080 0000450 0 0005 1080 0000450 0 0005 1080 0000450 0 0005 1080 0000450 0 0005 1080 0000450 0 0005 1080 0000450 0 0005 1080 000045
Drum/Coil?
OFFICE USE ONLY
ALLREGIONS
DIRECT TO SITE QUESTIONAIRRE 15PLEASE NOTE: All deliveries will be delivered on a 26ton Lorry Loader Crane (HIAB) vehicle. Site must allow full
extension of support legs and ground conditions must be hard standing.
Job Number / SO Number
Engineer Name / Tel No
Delivery Address
Postcode
Grid reference if applicable
Site Contact on date of delivery (Name and telephone number)
Does the job involve a Road Closure? (Y / N)
Is a site induction required? If yes, provide estimated time of induction
Special Documentation Required such as Driver ID, Certificates etc
Total estimated time on site for delivery vehicle
Does the site allow for full extension of all vehicle support legs?
Ground Conditions - Hard or Soft ground
Please provide details of any restrictions: (Access to site / Weight Restrictions on approach roads / Low bridges on approachroads / proximity to O/H Lines / Low Hanging Trees / Parking Permits needed)
Category SKU Description wgt/m 10m
11kV Mains ALI Single Core LSOH Cables 06016T 11KV 300MM2 ALI S/C AWS LSOH (750m Drum) *06016T* 2.09 20.0911kV Mains ALI Single Core LSOH Cables 06014Y 11KV 95MM2 ALI S/C AWS LSOH (750m Drum) *06014Y* 0.91 9.111kV Mains ALI Single Core XLPE Cables - Fault Stock / Small Works 06124Q 11KV 1000MM2 ALI S/C AWS PE (500m Drum) *06124Q* 4.12 41.211kV Mains ALI Single Core XLPE Cables - Fault Stock / Small Works 06125A 11KV 1200MM2 ALI S/C AWS PE (500m Drum) *06125A* 4.73 47.311kV Mains ALI Single Core XLPE Cables - Fault Stock / Small Works 06122V 11KV 630MM2 ALI S/C AWS PE (500m Drum) *06122V* 3.03 30.0311kV Mains ALI Single Core XLPE Cables - Fault Stock / Small Works 06123F 11KV 800MM2 ALI S/C AWS PE (500m Drum) *06123F* 3.64 36.411kV Mains ALI Triplex XLPE Cables 06010K 11KV 185MM2 ALI TRIPLEX AWS PE (250m Drum) *06010K* 4.21 42.111kV Mains ALI Triplex XLPE Cables 06011U 11KV 300MM2 ALI TRIPLEX AWS PE (250m Drum) *06011U* 5.7 5711kV Mains ALI Triplex XLPE Cables 06009P 11KV 95MM2 ALI TRIPLEX AWS PE (500m Drum) *06009P* 2.51 25.111kV Mains CU Single Core LSOH Cables 06121L 11KV 300MM2 CU S/C AWS LSOH (750m Drum) *06121L* 3.58 35.811kV Mains CU Triplex XLPE Cables (LPN Faults Only) 06012E 11KV 185MM2 CU TRIPLEX AWS PE (250m Drum) *06012E* 5.24 52.411kV Mains CU Triplex XLPE Cables (LPN Faults Only) 06013P 11KV 300MM2 CU TRIPLEX AWS PE (250m Drum) *06013P* 10.5 10533kV Mains ALI Cables - Fault Stock / Small Works 06143X 33KV 1000MM2 ALI S/C XLPE AWS (500m Drum) *06143X* 5 5033kV Mains ALI Cables - Fault Stock / Small Works 06140T 33KV 300MM2 ALI S/C XLPE AWS (500m Drum) *06140T* 2.06 20.0633kV Mains ALI Cables - Fault Stock / Small Works 06141D 33KV 500MM2 ALI S/C XLPE AWS (500m Drum) *06141D* 2.82 28.233kV Mains ALI Cables - Fault Stock / Small Works 06142N 33KV 630MM2 ALI S/C XLPE AWS (500m Drum) *06142N* 3.37 33.7Bare Conductors ALI 08957Q 100MM AAAC BARE [OAK] (1000m Drum) *08957Q* 0.329 3.29Bare Conductors ALI 05804W 100MM ACSR BARE [DOG] (1000m Drum) *05804W* 0.4 4Bare Conductors ALI 05814F 100MM HD ALI BARE [WASP] (1000m Drum) *05814F* 0.736 7.36Bare Conductors ALI 05806R 150MM AAAC BARE [WOLF] (500m Drum) *05806R* 0.72 7.26Bare Conductors ALI 05425T 200MM ACSR BARE [JAGUAR] (1000m Drum) *05425T* 0.736 7.36Bare Conductors ALI 05420U 25MM ACSR BARE [GOPHER] (1000m Drum) *05420U* 0.27 2.7Bare Conductors ALI 05421E 50MM ACSR BARE [RABBIT] (1000m Drum) *05421E* 0.75 7.5Bare Conductors ALI 05427N 50MM HD ALI BARE [ANT] (1000m Drum) *05427N* 0.146 1.46Bare Conductors CU 05824P 100MM HD CU BARE (500m Drum) *05824P* 0.911 9.11Bare Conductors CU 05819E 120MM HD CU BARE (500m Drum) *05819E* 1.35 13.5Bare Conductors CU 05820A 16MM HD CU BARE (500m Drum) *05820A* 0.149 1.49Bare Conductors CU 05429H 25MM HD CU BARE (500m Drum) *05429H* 0.272 2.72Bare Conductors CU 05430D 32MM HD CU BARE (1000m Drum) *05430D* 0.295 2.95Bare Conductors CU 05823E 70MM HD CU BARE (500m Drum) *05823E* 0.688 6.88Copper Bonding Lead 06050U 240MM2 COPPER BONDING LEAD (500m Drum) *06050U* 3.11 31.1Copper Bonding Lead 06051E 240MM2 COPPER CONCENTRIC BONDING LEAD (500m Drum) *06051E* 5.54 55.4Covered Conductors 05445L 100MM SCA PVC GREEN [DOG] (1000m Drum) *05445L* 0.704 7.04Covered Conductors 05443R 25MM SCA PVC GREEN [GOPHER] (1000m Drum) *05443R* 0.19 1.9Covered Conductors 05437W 50MM ALI PVC BLACK [ANT] (1000m Drum) *05437W* 0.8 8Covered Conductors 05444B 50MM ASCR PVC GREEN [RABBIT] (1000m Drum) *05444B* 0.9 9Fibre Optic 01203Y 24F FIBRE CABLE – SINGLE (2000m Drum Only) *01203Y* xx N/AFibre Optic 01204J 24F HYBRID FIBRE CABLE 16F – COMPOSITE (2000m Drum Only) *01204J* xx N/AFluid Filled Cables - Fault Work Only 06042F 132KV 1000MM 1 CORE FLUID FILLED (250m Drum) *06042F* 15.75 N/AFluid Filled Cables - Fault Work Only 06039Q 132KV 400MM 1 CORE FLUID FILLED (500m Drum) *06039Q* 9.1 N/AFluid Filled Cables - Fault Work Only 06040L 132KV 400MM 3 CORE FLUID FILLED (250m Drum) *06040L* 20.75 N/AFluid Filled Cables - Fault Work Only 06037V 33KV 185MM 3 CORE FLUID FILLED (250m Drum) *06037V* 2.8 N/AFluid Filled Cables - Fault Work Only 06038F 33KV 400MM 3 CORE FLUID FILLED (250m Drum) *06038F* 16.74 N/A
HV Covered Conductor 09913V ALI BLX 120MM (1000m Drum) *09913V* 0.49 4.9HV Covered Conductor 09902C ALI BLX 50MM (2000m Drum) *09902C* 0.202 2.02LV Aerial Bundled Conductors (ABC) 06212U ABC 120MM 1C EARTH WIRE (100m Drum) *06212U* 0.49 4.9LV Aerial Bundled Conductors (ABC) 06208U ABC 120MM 4 CORE (250m Drum) *06208U* 1.627 16.27LV Aerial Bundled Conductors (ABC) 06209E ABC 35MM 1C EARTH WIRE (100m Drum) *06209E* 0.22 2.2LV Aerial Bundled Conductors (ABC) 06200R ABC 35MM 2 CORE (500m Drum) *06200R* 0.259 2.59LV Aerial Bundled Conductors (ABC) 06205Q ABC 35MM 4 CORE (500m Drum) *06205Q* 0.526 5.26LV Aerial Bundled Conductors (ABC) 06210A ABC 50MM 1C EARTH WIRE (100m Drum) *06210A* 0.27 2.7LV Aerial Bundled Conductors (ABC) 06201B ABC 50MM 2 CORE (500m Drum) *06201B* 0.351 3.51LV Aerial Bundled Conductors (ABC) 06206A ABC 50MM 4 CORE (500m Drum) *06206A* 0.702 7.02LV Aerial Bundled Conductors (ABC) 06211K ABC 95MM 1C EARTH WIRE (100m Drum) *06211K* 0.41 4.1LV Aerial Bundled Conductors (ABC) 06202L ABC 95MM 2 CORE (500m Drum) *06202L* 0.655 6.55LV Aerial Bundled Conductors (ABC) 06207K ABC 95MM 4 CORE (350m Drum) *06207K* 1.309 13.09LV Booklet Cables 05858E 120MM 1C CU BLUE PVC / PVC (50m Drum) *05858E* 1 10LV Booklet Cables 05840S 120MM 1C CU BROWN PVC / PVC (50m Drum) *05840S* 1.471 14.71LV Booklet Cables 05859P 185MM 1C CU BLUE PVC / PVC (50m Drum) *05859P* LV Service Cables 15LV Booklet Cables 05841C 185MM 1C CU BROWN PVC / PVC (50m Drum) *05841C* 1.5 15LV Booklet Cables 05857U 70MM 1C CU BLUE PVC / PVC (50m Drum) *05857U* 0.749 7.49LV Booklet Cables 05839W 70MM 1C CU BROWN PVC / PVC (50m Drum) *05839W* 0.749 7.49LV Booklet Earth Cables 05867D 120MM 1C CU GRN/YLW EARTH CABLE (50m Drum) *05867D* 1.234 12.34LV Booklet Earth Cables 05847L 16MM 1C CU GRN/YLW EARTH CABLE (50m drum) *05847L* 0.179 1.79LV Booklet Earth Cables 05864Y 35MM 1C CU GRN/YLW EARTH CABLE (50m Drum) *05864Y* 0.379 3.79LV Booklet Earth Cables 05866T 50MM 1C CU GRN/YLW EARTH CABLE (50m Drum) *05866T* 0.512 5.12LV Booklet Earth Cables 05865J 70MM 1C CU GRN/YLW EARTH CABLE (50m Drum) *05865J* 0.722 7.22LV Mains Cables Waveform 05579J 185MM 3C ALI WAVEFORM (250m Drum) *05579J* 3.63 36.3LV Mains Cables Waveform 05588H 300MM 3C ALI WAVEFORM (250m Drum) *05588H* 4.9 49LV Mains Cables Waveform 05577P 95MM 3C ALI WAVEFORM (500m Drum) *05577P* 1.98 19.8LV Mains Cables Waveform CU (LPN Faults Only) 05587X 300MM 3C CU WAVEFORM (250m Drum) *05587X* 11.117 111.17LV Mains Cables Waveform LSOH 05595M 185MM 3C ALI WAVEFORM LSOH (250m Drum) *05595M* 3.9 39LV Mains Cables Waveform LSOH 05556M 185MM 4C ALI WAVEFORM LSOH (250m Drum) *05556M* 4.8 48LV Mains Cables Waveform LSOH 05596W 300MM 3C ALI WAVEFORM LSOH (250m Drum) *05596W* 5.2 52LV Mains Cables Waveform LSOH 05557W 300MM 4C ALI WAVEFORM LSOH (250m Drum) *05557W* 6.6 66LV Mains Cables Waveform LSOH 05594C 95MM 3C ALI WAVEFORM LSOH (250m Drum) *05594C* 2.4 24LV Mains Cables Waveform LSOH 05555C 95MM 4C ALI WAVEFORM LSOH (250m Drum) *05555C* 2.3 23LV Service Cables 01284D 25MM ALI SINGLE PHASE SERVICE CABLE (100m Drum) *01284D* 0.252 2.52LV Service Cables 05886L 35MM 1C ALI PHASE CONDUCTOR (100m Drum) *05886L* 0.39 3.9LV Service Cables 05887V 35MM 1C ALI SPLIT CONCENTRIC CONDUCTOR (100m Drum) *05887V* 0.6 6LV Service Cables 05903U 35MM 3C ALI PHASE CONDUCTOR (250m Drum) *05903U* 0.84 8.4LV Service Cables 05860K 4MM CU COMBINED NEUTRAL AND EARTH (CNE) (250m Drum) *05860K* 0.13 1.3LV Service Cables LSOH 05550D 35MM 1C ALI PHASE LSOH CONDUCTOR (100m Drum) *05550D* 0.395 3.95LV Service Cables LSOH 05553H 35MM 1C ALI SPLIT PHASE LSOH SNE CONDUCTOR (100m Drum) *05553H* 0.6 6LV Service Cables LSOH 05552X 35MM 3C ALI PHASE LSOH CONDUCTOR (250m Drum) *05552X* 1.1 11LV Service Cables LSOH 05554S 35MM 3C ALI PHASE LSOH CONDUCTOR (250m Drum) *05554S* 0.6 6LV Transformer Tail Cables (LPN Only) 05179D 480MM (4 x 120MM) 1C SOLID SECTORAL (250m Drum) *05179D* 1.76 17.6LV Transformer Tail Cables (LPN Only) 05180Y 600MM (4 x 150MM) 1C SOLID SECTORAL (250m Drum) *05180Y* 2.13 21.3LV Transformer Tail Cables (SPN Only) 05880C 600MM (4 x 150MM) 1C SOLID SECTORAL ARMOURED (250m Drum) *05880C* 3.25 32.5LV Transformer Tail Cables (SPN Only) 05881M 740MM (4 x 185MM) 1M SOLID SECTORAL ARMOURED (250m Drum) *05881M* 3.55 35.5Multicore Pilot and Multi-pair Cables 05973F 12C 2.5MM 7/.067MM MULTICORE (250m Drum) *05973F* 1.056 10.56Multicore Pilot and Multi-pair Cables 05527V 19 PAIR POLY PILOT CABLE (1000m Drum) *05527V* 1.8 18Multicore Pilot and Multi-pair Cables 05974Q 19C 2.5MM 7/.067MM MULTICORE (250m Drum) *05974Q* 1.3 13Multicore Pilot and Multi-pair Cables 05975A 27C 2.5MM 7/.067MM MULTICORE (250m Drum) *05975A* 2.5 25Multicore Pilot and Multi-pair Cables 05528F 37 PAIR POLY PILOT CABLE (500m Drum) *05528F* 3 30Multicore Pilot and Multi-pair Cables 05971L 4C 2.5MM 7/.067MM MULTICORE (250m Drum) *05971L* 0.113 1.13Multicore Pilot and Multi-pair Cables 05526L 7 PAIR POLY PILOT CABLE (500m Drum) *05526L* 0.93 9.3Multicore Pilot and Multi-pair Cables 05972V 7C 2.5MM 7/.067MM MULTICORE (250m Drum) *05972V* 0.7 7Strategic and Discontinued 05145N 11KV 185MM CU TRIPLEX CWS PE (250M DRUM) – OLD SPEC *05145N* 8.147 81.47Strategic and Discontinued 05145N 11KV 185MM2 CU TRIPLEX CWS PE SHEATH *05145N* 8.14 84Strategic and Discontinued 06003F 11KV 300MM2 CU TRIPLEX CWS PE SHEATH *06003F* 11.73 117.3Strategic and Discontinued 06024H 11KV XLPE 400MM2 CU 1C LSOH SHEATH *06024H* 4.79 47.9Strategic and Discontinued 06021D 11KV XLPE 500MM2 CU 1C XLPE *06021D* 5.91 59.1Strategic and Discontinued 06079A 132KV XLPE 630MM2 AL HDPE SO *06079A* 6.18 61.8Strategic and Discontinued 06101T 33KV 1C CU 300MM XLPE *06101T* 4 40Strategic and Discontinued 06102D 33KV 1C CU 400MM XLPE *06102D* 5.29 52.9Strategic and Discontinued 06075L 66KV XLPE 400MM2 CU HDPE (500m Drum) *06075L* 5.63 56.3Tiletape / Stokboard / LV Ducting 25400F 32MM COILABLE SERVICE DUCT (100m Coil) *25400F* xx N/ATiletape / Stokboard / LV Ducting 04041M 33KV TILE - HEAVY DUTY 1000 X 244 X 9MM *04041M* xx N/ATiletape / Stokboard / LV Ducting 25401Q 50MM COILABLE SERVICE DUCT (50m Coil) *25401Q* xx N/ATiletape / Stokboard / LV Ducting 25411Y RIDGIDUCT SOLID 2M X 125MM *25411Y* xx N/ATiletape / Stokboard / LV Ducting 04039G TAPE TILE - 200MM X 2.5MM (MIN 40M) *04039G* xx N/A
15m 20m 30m 40m 50mMAXCOILQTY
31.35 41.8 62.7 83.6 104.5 3013.65 18.2 27.03 36.4 45.5 4061.8 82.4 123.6 164.8 206 1070.95 94.6 141.9 189.2 236.5 1045.45 60.6 90.09 121.2 151.5 1554.6 72.8 109.2 145.6 182 1563.15 84.2 126.3 168.4 210.5 2085.5 114 171 128 285 1537.65 50.2 75.3 100.4 125.5 2553.7 71.6 107.4 143.2 179 3078.6 104.8 157.2 209.6 262 15157.5 210 315 420 525 1575 100 150 200 250 1030.9 41.2 61.8 82.4 103 1542.3 56.4 84.6 112.8 141 1550.55 67.4 101.1 134.8 168.5 154.935 6.58 9.87 13.16 16.45 506 8 12 16 20 50
11.04 14.72 22.08 29.44 36.8 5010.89 14.52 21.78 29.04 36.03 5011.04 14.72 22.08 29.44 36.8 504.05 5.4 8.1 10.8 13.5 5011.25 15 22.5 30 37.5 502.19 2.92 4.38 5.84 7.3 50
13.665 18.22 27.33 36.44 45.55 5020.25 27 40.5 54 67.5 502.235 2.98 4.47 5.96 7.45 504.08 5.44 8.16 10.88 13.6 504.425 5.9 8.85 11.8 14.75 5010.32 13.76 20.64 27.52 34.4 5046.65 62.2 93.3 124.4 155.5 3083.1 110.8 166.2 221.6 277 1510.56 14.08 21.12 28.16 35.2 502.85 3.8 5.7 7.6 9.5 5012 16 24 32 40 5013.5 18 27 36 45 50N/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/A
HeavyCaution - 2 Man
OK - 1 Man
7.35 9.8 14.7 19.6 24.5 503.03 4.04 6.06 8.08 10.1 1007.35 9.8 14.7 19.6 24.5 50
24.405 32.54 48.81 65.08 81.35 503.3 4.4 6.6 8.8 11 50
3.885 5.18 7.77 10.36 12.95 1007.89 10.52 15.78 21.04 26.3 504.05 5.4 8.1 10.8 13.5 505.265 7.02 10.53 14.04 17.55 10010.53 14.04 21.06 28.08 35.1 506.15 8.2 12.3 16.4 20.5 509.825 13.1 19.65 26.2 32.75 5019.635 26.18 39.27 52.36 65.45 5015 20 30 40 50 50
22.07 29.42 44.13 58.84 73.55 4022.5 30 45 60 75 4022.5 30 45 60 75 2511.24 14.98 22.47 29.96 37.45 5011.24 14.98 22.47 29.96 37.45 5018.51 24.68 37.02 49.36 61.7 502.685 3.58 5.37 7.16 8.95 505.685 7.58 11.37 15.16 18.95 507.68 10.24 15.36 20.48 25.6 5010.83 14.44 21.66 28.88 36.1 5054.45 72.6 108.9 145.2 181.5 1573.5 98 147 196 245 1529.7 39.6 59.4 79.2 99 50
166.755 222.234 333.51 444.68 555.85 558.5 78 117 156 195 2572 96 144 192 240 2078 104 156 208 260 1599 132 198 264 330 1036 48 72 96 120 5034.5 46 69 92 115 503.78 5.04 7.52 10.08 12.6 1005.85 7.8 11.7 15.6 19.5 1009 12 18 24 30 100
12.6 16.8 25.2 33.6 42 801.95 2.6 3.9 5.2 6.5 2505.925 7.9 11.85 15.8 19.75 1009 12 18 24 30 100
16.5 22 33 44 55 509 12 18 24 30 50
26.4 35.2 52.8 70.4 88 3031.95 42.6 63.9 85.2 106.5 3048.75 65 97.5 130 162.5 1553.25 71 106.5 142 177.5 1515.84 21.12 31.68 42.24 52.8 5027 36 54 72 90 4019.5 26 39 52 65 5037.5 50 75 100 125 3545 60 90 120 150 25
1.695 2.26 3.39 4.52 5.65 25013.95 18.6 27.9 37.2 46.5 5010.5 14 21 28 35 50
122.205 162.94 244.41 325.88 407.35 10122.1 168 252 325.6 407 15175.95 234.6 351.9 469.2 586.5 1571.85 95.8 143.7 191.6 239.5 2088.65 118.2 177.3 236.4 295.5 1592.7 123.6 185.4 247.2 309 1060 80 120 160 200 20
79.35 105.8 158.7 211.6 264.5 2084.45 112.6 168.9 225.2 281.5 15N/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A N/A
Cable & Arial Bundled Conductor (ABC)
Step 1
Onsite Measure the Cable/ABC needed
Step 2
Order the Cable/ABC from LogisticsEmail: distributionplantrequest@ukpowernetworks.co.uk
Step 3
Logistics Prepare the Cable/ABC
Step 4
Logistics deliver Cable/ABC
Step 5
Install the Cable/ABC on site
Day 1
Day 2
Day 3
If a job changes call the Logistics team onTel: 01284 726265 and email 'Distribution Plant Requests' with the details and wewill move the delivery
To Return Drums call:01284 726265or email 'Distribution Plant Requests'or put a BLACK CROSS on the delivery labeland our driver will know to collect the drum
0 10 20
metres
This plan shows the location of those pipes owned by Scotia Gas Networks (SGN) by virtue of being a licensed Gas Transporter (GT). Gas
pipes owned by other GTs or third parties may also be present in this area but are not shown on this plan. Information with regard to
such pipes should be obtained from the relevant owners. No warranties are given with regard to the accuracy of the information shown
on this plan. Service pipes, valves, siphons, sub-connections etc. are not shown but their presence should be anticipated. You should be
aware that a small percentage of our pipes/assets may be undergoing review and will temporarily be highlighted in yellow. If your
proposed works are close to one of these pipes, you should contact the SGN Safety Admin Team on 0800 912 1722 for advice. No liability
of any kind whatsoever is accepted by SGN or its agents, servants or sub-contractors for any error or omission contained herein. Safe
digging practices, in accordance with HS (G)47, must be used to verify and establish the actual position of mains, pipes, services and
other apparatus on site before any mechanical plant is used. It is your responsibility to ensure that plant location information is provided
to all persons (whether direct labour or sub-contractors) working for you on or near gas apparatus. Information included on this plan
should not be referred to beyond a period of 28 days from the date of issue.
Contact Us
SGN Safety Admin Team:
0800 912 1722 Email:
plantlocation@sgn.co.uk
Report damage immediately – KEEP EVERYONE AWAY FROM THE AREA
0800 111 999
This plan is reproduced from or based on the OS map by Scotia Gas Networks plc, with the sanction of the controller of HM Stationery Office. Crown Copyright Reserved. Southern Gas –
100044373 and Scotland Gas – 100044366.
This information is given as a guide
only and its accuracy cannot be
guaranteed.
= "Material
Change
SSSIs
Area:
GTs
$ Diameter
Change
LAs
Digsite:
Line:
SyphonDepth of
Cover
Medium Pressure Mains
Intermediate Pressure Mains
High Pressure Mains
Some Examples Of Plant Items
Low Pressure Mains
Valve 5
1:1000 Area or Circle dig site1:1000 Line dig site
Exact Scales:
Date Requested: 06/01/2021Job Reference: 20927853Site Location: 636711 164187
Your Scheme/Reference:1
Requested by:Miss Jessica Wellings
Warning: PDF designed for colour print only with no page scaling.
Plans generated by DigSAFE Pro (tm) software provided by LinesearchbeforeUdig
The positions of pipes shown on this plan are believed to be correct, but Southern Water Services Ltd accept no responsibility in the event of inaccuracy. The actual positions should be determined on site. This plan is produced by Southern Water Services Ltd (c) Crown copyright and database rights 2020 Ordnance Survey 100031673 .This map is to be used for the purposes of viewing the location of Southern Water plant only. Any other uses of the map data or further copies is not permitted.
WARNING: BAC pipes are constructed of Bonded Asbestos Cement.
WARNING: Unknown (UNK) materials may include Bonded Asbestos Cement.
Date: 06/01/21 Scale: 1:500 Data updated: 21/12/20Map Centre: 636711,164187(c) Crown copyright and database rights 2021 Ordnance Survey 100031673 Wastewater Plan A3
jessica.wellings@ukpowernetworks.co.uk
Manhole Reference Liquid Type Cover Level Invert Level Depth to Invert
Manhole Reference Liquid Type Cover Level Invert Level Depth to Invert
Manhole Reference Liquid Type Cover Level Invert Level Depth to Invert
PERMIT APPLICATION SUMMARY 61667
Requestor : michelle.batchelor@alscivil.com
KZ50045004940-03
KZ50045004940
000150074481
0203
Permit Reference Numbers
Permit Reference NumberUKPN Works Reference NoSAP Work Order NumberSAP Work Order Operations Number
Selected Location:opp 1-12 Pegwell Court,PEGWELL ROAD, RAMSGATE
USRN:40301003
Road Category:4 Carriageway type 4 (up to 0.5 MSA)
Operational Zone:East Kent
Highway Authority:KENT
Traffic Sensitivity:No
Lane Rental Applicable:No
Position of Works:
Work Location Details
Special Designations (0)
No data
Carriageway
Primary Contractor:ALS Civil Engineers Ltd
Secondary Contractor (Optional):N/A
Other Contractor:
Work Type:planned
Activity Type:New Service Connection
Traffic Management Contractor:
Collaboration Type:
TTRO Required:No
Excavation Required:Yes
Excavation Carried Out:Yes
Collaborative Working:Yes
Collaboration Details:
Collaborative Work Reference:
Environmental Health Notifiable:No
Agreement Reference Number:
Additional Information:
Response to Covid-19:No
Work Date Range:23 Sep 2021 - 29 Sep 2021
Jointing Date:24 Sep 2021, 00:00:00
Traffic Management Type:Priority Working
Footway Closure:Yes, provide alternative route
Collaboration Type:
WRP:True
WRP Authority:
Department Identifier:Connections Projects
Works Identifier:Installation of a new electricity supply for a customer
Works Description:Excavate joint bay for new service connection, pull cables, joint and reinstate.
External Reference:N/A
Person Responsible:justin.wornham@ukpowernetworks.co.uk
Person Responsible Contact Details (Optional):07875111627
Comments to Highway Authority:
Work Details
Work Type: planned
Hi Emma, the conflicting works are approx 715mtrs away from our works. Michelle 07973844608Site was not able to be jointed will need to be rescheduled. MichelleSite was not able to be jointed will need to be rescheduled. MichelleEstimated charge information for : KZ50045004940 With charge rate : NORMAL. For Permit Authority Organisation: 2275 (KENT COUNTY COUNCIL).
Our estimate for the cost of this Standard works Permit on a non traffic sensitive street Carriageway type 4 (up to0.5 MSA) is : £0
Permit Conditions (4)
NCT01a-undefined
Recommended