Copyright EMEC 2008 Scotland World Leader in Marine Energy Neil Kermode Managing Director

Preview:

Citation preview

Copyright EMEC 2008

ScotlandWorld Leader in Marine

Energy

Neil KermodeManaging Director

Copyright EMEC 2009

Is it worth it?

20% of UK’s electricity from Marine Energy

Develop technology for export

Security of supply

Jobs

‘So where are these machines?’ &

‘Why Scotland?’

Copyright EMEC 2009

Wave Resource

Copyright EMEC 2009

Wave Resource

Copyright EMEC 2009

UK Wave Resource• Wave energy densities of

over 20kW/m• Scotland estimated

resource 14GW (46TWh)• 10% (4.6TWh) could

produce 10% of Scotland’s demand or 1.5% of UK’s

DTI Atlas

Copyright EMEC 2009

UK Tidal Resource• Considerable resource with

speeds in excess of 1.5m/s• Pentland Firth 3m/s locally

with potential 16GW• 10% extraction would give

over 3TWh• Total Scottish resource in

excess of 4TWh

DTI Atlas

Copyright EMEC 2009

Main Types of Wave Devices

Floating

Underwater BuoyantHinged Flap

Oscillating Water Column Overtopping

Copyright EMEC 2009

Types of Tidal DevicesHorizontal axial-flow,

bottom mounted

Horizontal axial-flow, floating

Horizontal axial-flow, surface piercing

Vertical axial-flow

Other designs include: Oscillating Hydrofoil, Air Injection Technology and Lagoons

Copyright EMEC 2009

Where are we now?

19042006

Copyright EMEC 2009

EMEC’s Mission:

To be the internationally acknowledged leading test and certification centre for

marine energy converters.

Copyright EMEC 2009

Wave Site – Billia Croo Cables

Grid

Data

Tidal Site – Fall of Warness, Eday

WavesTides

Hard Assets

Copyright EMEC 2009

Sponsors:• Scottish Executive• Scottish Enterprise• Highlands & Islands Enterprise • Orkney Enterprise• Carbon Trust • Orkney Islands Council• DTI• EU (Tidal)

Around £18M

Copyright EMEC 2009

EMEC’s Timeline• 1999 DTI Foresight• 2001 DTI & HIE Studies• 2002 design &

contract definition• 2003 construction• 2004 opening & 1st

wave device• 2005 tidal site

commenced• 2006 1st tidal device• 2007 cable connection• 2008 1st tidal grid

generation• 2009 …..

Copyright EMEC 2009

Wave Site – Billia Croo

Where are we now?

Copyright EMEC 2009

Tidal Site – Fall of Warness, Eday

Where are we now?

Copyright EMEC 2009

Progress?

• First Platform 3.5 months

• Second installation 20 minutes

Copyright EMEC 2009

We are not alone

Copyright EMEC 2009